7050 W 85TH ST 90045
Certificate Information: 7050 W 85TH ST 90045
- Application / Permit
- 20016-30000-02376
- Plan Check / Job No.
- X20WL00498
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __21___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. (14) Window and (1) Door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
- Permit Issued
- Issued on 1/27/2020
- Issuing Office
- West Los Angeles
- Current Status
- Permit Finaled on 4/17/2020
Permit Application Status History
| Issued | 1/27/2020 | LADBS |
| Permit Finaled | 4/17/2020 | JUAN VALENZUELA |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| MICHAEL LEWIS, (310) 914-3979 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 3/9/2020 | Approved | JUAN VALENZUELA |
| Final | 4/2/2020 | Corrections Issued | JUAN VALENZUELA |
| SGSOV-Seismic Gas S/O Valve | 4/2/2020 | SGSOV Not Ready | JUAN VALENZUELA |
| Smoke Detectors | 4/2/2020 | Corrections Issued | JUAN VALENZUELA |
| Floor/Roof Diaphrgm/Shear Wall | 4/10/2020 | No Access for Inspection | JUAN VALENZUELA |
| SGSOV-Seismic Gas S/O Valve | 4/10/2020 | SGSOV Not Ready | JUAN VALENZUELA |
| Smoke Detectors | 4/10/2020 | No Access for Inspection | JUAN VALENZUELA |
| Final | 4/17/2020 | Permit Finaled | JUAN VALENZUELA |
| SGSOV-Seismic Gas S/O Valve | 4/17/2020 | SGSOV Approved | JUAN VALENZUELA |
| Smoke Detectors | 4/17/2020 | Approved | JUAN VALENZUELA |