2142 S PORTLAND ST 90007

Certificate Information: 2142 S PORTLAND ST 90007

Application / Permit
20016-30000-01832
Plan Check / Job No.
B20WL00315
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Convert Living room to 2 full bedrooms w/full bath. , Sunroom to a bedroom w/ full bath, remove stairs to 2nd floor from kitchen, create more interior openings for kitchen on the 1st floor. Remodeling all bedrooms on 2nd floor and provide full baths and closets, covert Sunroom to full bedroom, and removing some walls and doors per Engineeeing calc. Total 9 bedrooms. Per engineering design.
Permit Issued
Issued on 2/13/2020
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 6/16/2020

Permit Application Status History

Submitted 1/22/2020 APPLICANT
Assigned to Plan Check Engineer 1/23/2020 VLADIMIR ARUTYUNYAN
Corrections Issued 1/31/2020 VLADIMIR ARUTYUNYAN
Building Plans Picked Up 2/7/2020 APPLICANT
Plan Check Approved 2/13/2020 PARISA ZAHABI
Issued 2/13/2020 LADBS
Permit Finaled 6/16/2020 KATHRYN BUTTERWORTH

Permit Application Clearance Information

ZI Cleared 2/13/2020 NOAH MCCOY

Contact Information

Architect Zbikowski,, Jeffrey; Lic. No.: C35389 5919 S CROSFT AVENUE      LOS ANGELES, CA 90056
Contractor Owner-Builder       ,
Engineer Kang,, Danniel; Lic. No.: S6242 633 E 223RD ST B      CARSON, CA 90745

Inspector Information

WILLIAM SIERRA, (213) 202-3122 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 3/10/2020 Partial Approval ALEJANDRO DE ARTOLA
ELECTRICAL-Rough 3/16/2020 Conditional Approval ALEJANDRO DE ARTOLA
PLUMBING-Rough 3/16/2020 Approved ALEJANDRO DE ARTOLA
BUILDING-Rough-Frame 3/18/2020 Approved ALEJANDRO DE ARTOLA
HVAC-Rough 3/18/2020 Partial Approval ALEJANDRO DE ARTOLA
Insulation 3/18/2020 Approved ALEJANDRO DE ARTOLA
Drywall Nailing 3/19/2020 Partial Approval ALEJANDRO DE ARTOLA
Drywall Nailing 3/23/2020 Approved ALEJANDRO DE ARTOLA
Final 6/5/2020 Corrections Issued KATHRYN BUTTERWORTH
SGSOV-Seismic Gas S/O Valve 6/5/2020 SGSOV Not Ready KATHRYN BUTTERWORTH
Smoke Detectors 6/5/2020 Approved KATHRYN BUTTERWORTH
Final 6/16/2020 Permit Finaled KATHRYN BUTTERWORTH
SGSOV-Seismic Gas S/O Valve 6/16/2020 SGSOV Approved KATHRYN BUTTERWORTH