7319 S DUNFIELD AVE 90045

Certificate Information: 7319 S DUNFIELD AVE 90045

Application / Permit
20016-20000-32786
Plan Check / Job No.
B20VN16335
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT 19'-2" x 19'-2" (E) DETACHED GARAGE TO ACCESSORY DWELLING UNIT PER CA Govt. Code 65852.2(e)(1)(A).
Permit Issued
Issued on 4/29/2021
Issuing Office
Current Status
CofO Issued on 1/19/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/15/2021 APPLICANT
Assigned to Plan Check Engineer 3/16/2021 SARKIS HARABEDIAN
Corrections Issued 3/16/2021 SARKIS HARABEDIAN
Plan Check Approved 4/29/2021 SARKIS HARABEDIAN
Issued 4/29/2021 APPLICANT
Building Plans Picked Up 4/30/2021 APPLICANT
CofO in Progress 1/13/2023 HERBERT GIRON
Permit Finaled 1/19/2023 DANIEL ORRANTE
CofO Issued 1/19/2023 DANIEL ORRANTE
Permit Finaled 1/19/2023 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 4/16/2021 DINAH GARIN
Sewer availability Cleared 4/16/2021 DINAH GARIN
Eng Process Fee Ord 176,300 Cleared 4/20/2021 DINAH GARIN
Grading Pre-Inspection Cleared 4/20/2021 BRIAN MILLER

Contact Information

Contractor La Home Construction; Lic. No.: 1061118-B 8610 CHALMERS DR #203      LOS ANGELES, CA 90035
Engineer Standley,, Craig Erick; Lic. No.: C87675 5330 ZELZAH AVE UNIT 7      ENCINO, CA 91316

Inspector Information

MORRIS JACKSON, (310) 914-3885 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/2/2022 Approved JESUS RODRIGUEZ
Footing/Foundation/Slab 5/13/2022 Corrections Issued JESUS RODRIGUEZ
PLUMBING-Rough 5/13/2022 Partial Approval JESUS RODRIGUEZ
Sewer 5/13/2022 Not Ready for Inspection JESUS RODRIGUEZ
Deputy Drilled-In Anchors 5/18/2022 Conditional Approval RICHARD STEINBACH
Footing/Foundation/Slab 5/24/2022 Conditional Approval BOBBY KEY
PLUMBING-Rough 5/24/2022 Partial Approval BOBBY KEY
PLUMBING-Rough 5/26/2022 Not Ready for Inspection CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 6/3/2022 Corrections Issued STEPHANIE SWANSON
Footing/Foundation/Slab 6/3/2022 Approved STEPHANIE SWANSON
BUILDING-Rough-Frame 6/15/2022 Partial Approval RICHARD STEINBACH
ELECTRICAL-Rough 6/15/2022 Corrections Issued RICHARD STEINBACH
Green Building Rough 6/15/2022 Approved RICHARD STEINBACH
PLUMBING-Rough 6/15/2022 Corrections Issued RICHARD STEINBACH
BUILDING-Rough-Frame 6/21/2022 Not Ready for Inspection DAVID FEILER
ELECTRICAL-Rough 6/21/2022 Not Ready for Inspection DAVID FEILER
HVAC-Rough 6/21/2022 Not Ready for Inspection DAVID FEILER
Interior/Exterior Lathing 6/21/2022 Not Ready for Inspection DAVID FEILER
METHANE-Rough 6/21/2022 Approved DAVID FEILER
PLUMBING-Rough 6/21/2022 Not Ready for Inspection DAVID FEILER
Shower Pan 6/21/2022 Not Ready for Inspection DAVID FEILER
PLUMBING-Rough 6/23/2022 Approved STEPHANIE SWANSON
BUILDING-Rough-Frame 6/27/2022 Not Ready for Inspection JESUS RODRIGUEZ
HVAC-Rough 6/27/2022 Corrections Issued JESUS RODRIGUEZ
Insulation 6/27/2022 Corrections Issued JESUS RODRIGUEZ
Interior/Exterior Lathing 6/27/2022 Corrections Issued JESUS RODRIGUEZ
Shower Pan 6/27/2022 Corrections Issued JESUS RODRIGUEZ
BUILDING-Rough-Frame 7/8/2022 Approved JESUS RODRIGUEZ
HVAC-Rough 7/8/2022 Approved JESUS RODRIGUEZ
Insulation 7/8/2022 Approved JESUS RODRIGUEZ
Interior/Exterior Lathing 7/8/2022 Approved JESUS RODRIGUEZ
Shower Pan 7/8/2022 Approved JESUS RODRIGUEZ
Underground Mechanical 7/13/2022 Approved HERBERT GIRON
Drywall Nailing 7/14/2022 Approved HERBERT GIRON
ELECTRICAL-Final 8/5/2022 Corrections Issued HERBERT GIRON
Final 8/5/2022 Corrections Issued HERBERT GIRON
Green Building Final 8/5/2022 Corrections Issued HERBERT GIRON
HVAC-Final 8/5/2022 Corrections Issued HERBERT GIRON
PLUMBING-Final 8/5/2022 Approved HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 8/5/2022 SGSOV Not Ready HERBERT GIRON
Smoke Detectors 8/5/2022 Corrections Issued HERBERT GIRON
ELECTRICAL-Final 8/23/2022 Corrections Issued HERBERT GIRON
Final 8/23/2022 Corrections Issued HERBERT GIRON
Green Building Final 8/23/2022 Approved HERBERT GIRON
HVAC-Final 8/23/2022 Corrections Issued HERBERT GIRON
PLUMBING-Final 8/23/2022 Approved HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 8/23/2022 SGSOV Approved HERBERT GIRON
Smoke Detectors 8/23/2022 Approved HERBERT GIRON
ELECTRICAL-Final 11/8/2022 Corrections Issued HERBERT GIRON
Final 11/8/2022 Corrections Issued HERBERT GIRON
HVAC-Final 11/8/2022 Approved HERBERT GIRON
ELECTRICAL-Final 11/10/2022 Corrections Issued HERBERT GIRON
Final 11/10/2022 Corrections Issued HERBERT GIRON
Final 12/22/2022 No Access for Inspection HERBERT GIRON
Final 1/4/2023 Not Ready for Inspection HERBERT GIRON
ELECTRICAL-Final 1/13/2023 Approved HERBERT GIRON
Final 1/13/2023 OK to Issue CofO HERBERT GIRON