5052 N BILOXI AVE 91601

Certificate Information: 5052 N BILOXI AVE 91601

Application / Permit
20016-20000-28757
Plan Check / Job No.
B20VN14504
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT 15' X 20' (E) DETACHED REC ROOM W/ 3'-6" X 20' PATIO COVER AND CONVERT 15' X 17' (E) DETACHED REC ROOM W/ 3'-6" X 17' PATIO COVER AND ADD 13' X 16' W/ 3'-6" X 13' PATIO COVER TO CONNECT INTO ONE STRUCTURE TO CREATE A (N) DETACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d). ALL WORK PER ENGINEERING. NFPA 13D FIRE SPRINKLERS THROUGHOUT.
Permit Issued
Issued on 12/13/2021
Issuing Office
Current Status
CofO Issued on 2/7/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/16/2020 APPLICANT
Assigned to Plan Check Engineer 12/30/2020 RAPHAEL ROSAS
Corrections Issued 1/2/2021 RAPHAEL ROSAS
Applicant returned to address corrections 6/7/2021 RAPHAEL ROSAS
Building Plans Picked Up 6/24/2021 APPLICANT
Issued 12/13/2021 APPLICANT
CofO in Progress 1/12/2024 JOHN HAYES
Permit Finaled 2/7/2024 RUBEN SALAS
CofO Issued 2/7/2024 RUBEN SALAS
Permit Finaled 2/7/2024 RUBEN SALAS

Permit Application Clearance Information

Address approval Cleared 1/5/2021 ADRIAN CASTRO
Eng Process Fee Ord 176,300 Cleared 1/6/2021 ADRIAN CASTRO
Sewer availability Cleared 1/6/2021 ADRIAN CASTRO
Construction near power lines Cleared 3/29/2021 RIDWAN HARDY
Low Impact Development Cleared 6/7/2021 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 6/7/2021 ABDULLAH SADOZAI

Contact Information

Contractor All State Construction Inc; Lic. No.: 1056262-B 509 N FAIRFAX AVE SUITE 209      LOS ANGELES, CA 90036
Engineer Basso,, Alexandre; Lic. No.: C77670 7231 SUMMITROSE ST      TUJUNGA, CA 91042

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 12/27/2021 Approved JACK KARGODORIAN
Excavation/Setback/Form/Re-Bar 12/27/2021 Approved JACK KARGODORIAN
BUILDING-Rough-Frame 1/21/2022 Approved MATT KELLERMAN
ELECTRICAL-Rough 1/21/2022 Approved MATT KELLERMAN
Green Building Rough 1/21/2022 Approved MATT KELLERMAN
HVAC-Final 1/21/2022 Not Ready for Inspection MATT KELLERMAN
PLUMBING-Rough 1/21/2022 Approved MATT KELLERMAN
Insulation 1/26/2022 Corrections Issued MISAEL ESPARZA
Insulation 3/8/2022 Approved DAVID MATSON
Drywall Nailing 3/21/2022 Approved CALEB MEISTER
Verify Sprinkler Sign Off 3/21/2022 Approved CALEB MEISTER
Final 5/16/2022 Corrections Issued JACK KARGODORIAN
Footing/Foundation/Slab 5/16/2022 Approved JACK KARGODORIAN
Green Building Final 5/16/2022 Not Ready for Inspection JACK KARGODORIAN
SGSOV-Seismic Gas S/O Valve 5/16/2022 SGSOV Not Ready JACK KARGODORIAN
Smoke Detectors 5/16/2022 Approved JACK KARGODORIAN
Final 9/18/2023 Corrections Issued JOHN HAYES
Green Building Final 9/18/2023 Approved JOHN HAYES
SGSOV-Seismic Gas S/O Valve 9/18/2023 SGSOV Approved JOHN HAYES
Final 11/7/2023 Corrections Issued JENNIFER RABUCHIN
Final 1/11/2024 OK to Issue CofO JOHN HAYES