2120 S DUXBURY CIR 90034

Certificate Information: 2120 S DUXBURY CIR 90034

Application / Permit
20016-20000-26523
Plan Check / Job No.
B20VN13582
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO THE (E) KITCHEN AND DINING ROOM. REMOVE PORTION OF THE WALL BETWEEN KITCHEN/DINING RM AND PORTION OF THE WALL BETWEEN DINING/LIVING RM. ALL WORK PER ENGINEER.
Permit Issued
Issued on 12/1/2020
Issuing Office
Current Status
Permit Finaled on 9/1/2021

Permit Application Status History

Submitted 10/19/2020 APPLICANT
Assigned to Plan Check Engineer 10/29/2020 MOHAMMAD ESMAILI
Corrections Issued 11/1/2020 MOHAMMAD ESMAILI
Plan Check Approved 11/30/2020 ANGELICA MARTINEZ
Issued 12/1/2020 APPLICANT
Permit Finaled 9/1/2021 KEVIN SARGSYAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor P M A Renovations; Lic. No.: 1033506-B 17941 VENTURA BLVD #204      ENCINO, CA 91316
Engineer Wu,, Harold Ping-Hung; Lic. No.: C35693 1168 SAN GABRIEL BLVD NO N      ROSEMEAD, CA 91770

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 2/1/2021 Not Ready for Inspection KEVIN SARGSYAN
Deputy Wood Construction 2/2/2021 Conditional Approval KEVIN SARGSYAN
ELECTRICAL-Rough 2/16/2021 Partial Approval OGANES TARAKHCHYAN
HVAC-Rough 2/16/2021 Approved OGANES TARAKHCHYAN
PLUMBING-Rough 2/16/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Wood Frame 2/16/2021 Partial Approval OGANES TARAKHCHYAN
Shower Pan 2/18/2021 Approved EVAN COOPER
Interior/Exterior Lathing 2/22/2021 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Rough 2/22/2021 Corrections Issued KEVIN SARGSYAN
Insulation 2/23/2021 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 2/23/2021 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 3/1/2021 Approved KEVIN SARGSYAN
PLUMBING-Rough 3/1/2021 Approved KEVIN SARGSYAN
Drywall Nailing 3/8/2021 Not Ready for Inspection KEVIN SARGSYAN
Drywall Nailing 3/10/2021 Approved KEVIN SARGSYAN
Final 6/15/2021 No Access for Inspection KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 6/15/2021 SGSOV Not Ready KEVIN SARGSYAN
Smoke Detectors 6/15/2021 No Access for Inspection KEVIN SARGSYAN
Service/Power Release 6/30/2021 No Access for Inspection KEVIN SARGSYAN
Final 7/12/2021 Corrections Issued KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 7/12/2021 SGSOV Approved KEVIN SARGSYAN
Smoke Detectors 7/12/2021 Approved KEVIN SARGSYAN
Final 7/30/2021 Not Ready for Inspection KEVIN SARGSYAN
Final 8/13/2021 No Access for Inspection JUAN VALENZUELA
Final 9/1/2021 Permit Finaled KEVIN SARGSYAN