3422 N CASTLEWOODS PL 91403

Certificate Information: 3422 N CASTLEWOODS PL 91403

Application / Permit
20016-20000-24084
Plan Check / Job No.
B20VN12603
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL THROUGHOUT (E) 2-STORY SFD: CONVERT (E) GUEST ROOM TO (N) BEDROOM AND REMODEL (E) KITCHEN/DINING ROOM/LIVING ROOM AT FIRST FLOOR; REMODEL (E) BEDROOMS/BATHROOMS/CLOSETS AND CREATE NEW LAUNDRY ROOM AT SECOND FLOOR, NEW ROOF DECK OVER (E) 21'-6" X 26'-10" ATTACHED GARAGE BELOW. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 11/13/2020
Issuing Office
Current Status
Permit Finaled on 11/17/2021

Permit Application Status History

Submitted 9/24/2020 APPLICANT
Assigned to Plan Check Engineer 10/2/2020 JENNIFER LEE
Corrections Issued 10/5/2020 JENNIFER LEE
Plan Check Approved 11/13/2020 JENNIFER LEE
Issued 11/13/2020 APPLICANT
Permit Finaled 11/16/2021 ROBERT GOLD

Permit Application Clearance Information

Specific Plan Cleared 10/20/2020 LIZZI BEDUYA
Eng Process Fee Ord 176,300 Cleared 10/27/2020 ADRIAN CASTRO
Roof/Waste drainage to street Cleared 10/27/2020 ADRIAN CASTRO
Sewer availability Cleared 10/27/2020 ADRIAN CASTRO
Grading Pre-Inspection Cleared 10/28/2020 BARTON HOLMES

Contact Information

Contractor Owner-Builder       ,
Engineer Mohammadi,, Saeid; Lic. No.: C82330 17412 VENTUTRA BLVD 21      ENCINO, CA 91316

Inspector Information

THOMAS FINNILA, (818) 774-4324 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 2/1/2021 Approved RONALD COWAN
Excavation/Setback/Form/Re-Bar 2/8/2021 Approved SEAN WIRCH
Footing/Foundation/Slab 2/8/2021 Approved SEAN WIRCH
Floor/Roof Diaphrgm/Shear Wall 3/11/2021 Partial Approval DAVID SCANTLIN
Deputy Wood Construction 3/25/2021 Partial Approval CHRISTOPHER DELLEFIELD
Deputy Wood Construction 3/31/2021 Approved RONALD COWAN
ELECTRICAL-Rough 4/23/2021 Approved RONALD COWAN
HVAC-Rough 4/23/2021 Approved RONALD COWAN
PLUMBING-Rough 4/23/2021 Approved RONALD COWAN
BUILDING-Rough-Frame 5/4/2021 Approved JEFFREY PARD
Insulation 5/17/2021 Approved SHAVONNE ESPINOZA
Shower Pan 5/17/2021 Partial Approval SHAVONNE ESPINOZA
BUILDING-Rough-Frame 5/21/2021 Corrections Issued JESUS RODRIGUEZ
Drywall Nailing 5/21/2021 Partial Approval JESUS RODRIGUEZ
Interior/Exterior Lathing 5/21/2021 Partial Approval JESUS RODRIGUEZ
Shower Pan 5/21/2021 Partial Approval JESUS RODRIGUEZ
Shower Pan 5/27/2021 Approved RONALD COWAN
Gas Test 7/12/2021 Approved RYAN SALAZAR
Final 11/16/2021 Permit Finaled ROBERT GOLD
SGSOV-Seismic Gas S/O Valve 11/16/2021 SGSOV Approved ROBERT GOLD
Smoke Detectors 11/16/2021 Approved ROBERT GOLD