12247 W LAUREL TERRACE DR 91604

Certificate Information: 12247 W LAUREL TERRACE DR 91604

Application / Permit
20016-20000-24048
Plan Check / Job No.
B20VN12594
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO REMOVE WALL BETWEEN KITCHEN AND DINING ROOM. CONVERT (E) BEDROOM TO ENLARGE MASTER BEDROOM AND ADD BALCONY. REMODEL KITCHEN AND BATHROOM.
Permit Issued
Issued on 7/7/2021
Issuing Office
Current Status
Permit Finaled on 5/7/2024

Permit Application Status History

Submitted 9/24/2020 APPLICANT
Assigned to Plan Check Engineer 10/1/2020 JEROME MAGAT PALMA
Corrections Issued 10/2/2020 JEROME MAGAT PALMA
Applicant returned to address corrections 12/7/2020 JEROME MAGAT PALMA
Applicant returned to address corrections 3/3/2021 JEROME MAGAT PALMA
Plan Check Approved 3/4/2021 JEROME MAGAT PALMA
Building Plans Picked Up 3/8/2021 APPLICANT
Issued 7/7/2021 APPLICANT
Permit Finaled 5/7/2024 CHRISTOPHE COCHRAN

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 10/15/2020 GUILLERMO PETRA
Roof/Waste drainage to street Cleared 10/15/2020 GUILLERMO PETRA
Grading Pre-Inspection Cleared 3/3/2021 BRIAN MILLER

Contact Information

Contractor Advance Remodeling Ideas Inc; Lic. No.: 1067383-B 6100 DE SOTO AVE #534      WOODLAND HILLS, CA 91367
Engineer Mohammadi,, Saeid; Lic. No.: C82330 17412 VENTUTRA BLVD 21      ENCINO, CA 91316

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 8/30/2021 Conditional Approval ARAM AVEDISIAN
Footing/Foundation/Slab 8/31/2021 Conditional Approval ARAM AVEDISIAN
ELECTRICAL-Rough 9/17/2021 Corrections Issued ARAM AVEDISIAN
PLUMBING-Rough 9/17/2021 Corrections Issued ARAM AVEDISIAN
Special/Order Compliance 9/17/2021 Partial Inspection ALIZAH MAYAGOITIA
Rough-Elec/Plmb/HVAC 9/24/2021 Approved ARAM AVEDISIAN
BUILDING-Rough-Frame 10/1/2021 Corrections Issued ARAM AVEDISIAN
BUILDING-Rough-Frame 10/6/2021 Not Ready for Inspection CHRISTOPHER DELLEFIELD
BUILDING-Rough-Frame 10/15/2021 Partial Approval ARAM AVEDISIAN
Insulation 10/15/2021 Partial Approval ARAM AVEDISIAN
Interior/Exterior Lathing 11/8/2021 Partial Approval CALEB MEISTER
Shower Pan 11/8/2021 Not Ready for Inspection CALEB MEISTER
Drywall Nailing 11/12/2021 Approved ARAM AVEDISIAN
Shower Pan 11/12/2021 Approved ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 6/29/2022 SGSOV Not Ready CHRISTOPHE COCHRAN
Final 3/21/2024 Corrections Issued CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 3/21/2024 SGSOV Approved CHRISTOPHE COCHRAN
Smoke Detectors 3/21/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Final 4/5/2024 Corrections Issued CHRISTOPHE COCHRAN
Smoke Detectors 4/5/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Final 5/7/2024 Permit Finaled CHRISTOPHE COCHRAN
Smoke Detectors 5/7/2024 Approved CHRISTOPHE COCHRAN