5322 E RANGE VIEW AVE 90042

Certificate Information: 5322 E RANGE VIEW AVE 90042

Application / Permit
20016-20000-23686
Plan Check / Job No.
B20VN12414
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NONSTRUCTURAL INTERIOR REMODEL TO CONVERT (E) CLOSET & PORTION OF MUD RM INTO FULL BATHRM PER PLAN. ADD NEW DOOR FROM EX BEDRM AT REAR TO ACCESS NEW 30" HIGH UNROOFED DECK. REMOVE AND REPLACE EXISTING WINDOWS W/ SAME SIZE/TYPE/LOCATIONS.
Permit Issued
Issued on 10/26/2020
Issuing Office
Current Status
Permit Finaled on 5/1/2021

Permit Application Status History

Submitted 9/24/2020 APPLICANT
Assigned to Plan Check Engineer 10/1/2020 HAYATO TSUCHIYA
Corrections Issued 10/4/2020 HAYATO TSUCHIYA
Plan Check Approved 10/21/2020 CRISTINA SALAZAR
Issued 10/26/2020 APPLICANT
Building Plans Picked Up 10/27/2020 APPLICANT
Permit Finaled 4/30/2021 CRAIG VAUGHAN

Permit Application Clearance Information

Grading Pre-Inspection Cleared 10/15/2020 BARTON HOLMES

Contact Information

Contractor Owner-Builder       ,
Engineer Adzhemyan,, Arsen; Lic. No.: C89103 1010 RALEIGH ST APT 107      GLENDALE, CA 91205

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 12/10/2020 Partial Approval CRAIG VAUGHAN
HVAC-Rough 12/10/2020 Not Ready for Inspection CRAIG VAUGHAN
PLUMBING-Rough 12/10/2020 Partial Approval CRAIG VAUGHAN
Floor/Roof Diaphrgm/Shear Wall 12/16/2020 Partial Approval OSVALDO PARAMO
HVAC-Rough 12/16/2020 Corrections Issued OSVALDO PARAMO
BUILDING-Rough-Frame 12/21/2020 Partial Inspection OSVALDO PARAMO
HVAC-Rough 12/21/2020 Not Ready for Inspection OSVALDO PARAMO
PLUMBING-Rough 12/21/2020 Approved OSVALDO PARAMO
BUILDING-Rough-Frame 12/24/2020 Approved CRAIG VAUGHAN
HVAC-Rough 12/24/2020 Approved CRAIG VAUGHAN
Insulation 12/30/2020 Partial Approval CRAIG VAUGHAN
Drywall Nailing 1/12/2021 Approved ROBERT VORHIS
Footing/Foundation/Slab 1/19/2021 Not Ready for Inspection CRAIG VAUGHAN
Excavation/Setback/Form/Re-Bar 2/3/2021 Approved CRAIG VAUGHAN
Footing/Foundation/Slab 2/3/2021 Approved CRAIG VAUGHAN
Pre-Inspection 2/3/2021 Approved CRAIG VAUGHAN
Final 4/12/2021 Corrections Issued CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 4/12/2021 SGSOV Approved CRAIG VAUGHAN
Smoke Detectors 4/12/2021 Approved CRAIG VAUGHAN
Final 4/30/2021 Permit Finaled CRAIG VAUGHAN