750 S BUNDY DR #204 90049
Certificate Information: 750 S BUNDY DR #204 90049
- Application / Permit
- 20016-20000-22283
- Plan Check / Job No.
- B20VN11829
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (35) Condo-Multi Family
- Work Description
- INTERIOR REMODEL TO THE KITCHEN AND BATHROOMS, AND CREATE A NEW OPENING AT THE WALL BETWEEN THE KITCHEN AND LIVING ROOM. ALL WORK PER ENGINEERING.
- Permit Issued
- Issued on 10/21/2020
- Issuing Office
- Current Status
- Permit Finaled on 9/29/2021
Permit Application Status History
| Submitted | 9/8/2020 | APPLICANT |
| Assigned to Plan Check Engineer | 9/14/2020 | RAPHAEL ROSAS |
| Corrections Issued | 9/15/2020 | RAPHAEL ROSAS |
| Plan Check Approved | 10/9/2020 | RAPHAEL ROSAS |
| Issued | 10/21/2020 | APPLICANT |
| Permit Finaled | 9/29/2021 | JOHN DODGE |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Stay Forever Construction Corporation; Lic. No.: 986055-B | 27138 CHERRY LAUREL PL CANYON COUNTRY, CA 91387 |
| Engineer | Arakelyan,, Aram; Lic. No.: C82796 | 145 S GLENOAKS BI 328 BURBANK, CA 91502 |
Inspector Information
| CASIMIR BRITTON, (310) 914-3913 | Office Hours: 7:00-8:00 AM MON-FRI |
| SHAVONNE ESPINOZA, (310) 914-3913 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Interior/Exterior Lathing | 11/12/2020 | Approved | JOHN DODGE |
| Wood Frame | 11/12/2020 | Not Ready for Inspection | JOHN DODGE |
| Insulation | 11/17/2020 | Approved | JOHN DODGE |
| Wood Frame | 11/17/2020 | Conditional Approval | JOHN DODGE |
| Drywall Nailing | 11/20/2020 | Approved | JOHN DODGE |
| Final | 3/16/2021 | Not Ready for Inspection | LEOPOLDO MENDOZA |
| SGSOV-Seismic Gas S/O Valve | 3/16/2021 | SGSOV Not Ready | LEOPOLDO MENDOZA |
| Smoke Detectors | 3/16/2021 | Approved | LEOPOLDO MENDOZA |
| Final | 3/31/2021 | Not Ready for Inspection | JOHN DODGE |
| Pre-Inspection | 3/31/2021 | Approved | JOHN DODGE |
| SGSOV-Seismic Gas S/O Valve | 3/31/2021 | SGSOV Not Ready | JOHN DODGE |
| Final | 9/29/2021 | Permit Finaled | JOHN DODGE |
| SGSOV-Seismic Gas S/O Valve | 9/29/2021 | SGSOV Approved | JOHN DODGE |