2636 S MIDVALE AVE 90064

Certificate Information: 2636 S MIDVALE AVE 90064

Application / Permit
20016-20000-21694
Plan Check / Job No.
B20VN11545
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO THE (E) SFD TO REMODEL THE KITCHEN, DINING ROOM , LIVING ROOM , TWO BATHROOMS, LAUNDRY, CONVERT (E) FAMILY ROOM INTO MASTER BEDROOM , CREATE MASTER BATHROOM, AND MASTER W.I.C., CONVERT (2) BEDROOMS INTO (1), REMODEL (1) BEDROOM, REMOVE AND REPLACE WINDOWS. ALL WORK PER ENGINEERING
Permit Issued
Issued on 9/25/2020
Issuing Office
Current Status
Permit Finaled on 5/3/2021

Permit Application Status History

Submitted 9/1/2020 APPLICANT
Assigned to Plan Check Engineer 9/11/2020 RARES BODEA
Corrections Issued 9/11/2020 RARES BODEA
Plan Check Approved 9/23/2020 SARKIS HARABEDIAN
Issued 9/25/2020 APPLICANT
Permit Finaled 4/30/2021 KENNETH NAGLE

Permit Application Clearance Information

Grading Pre-Inspection Cleared 9/23/2020 BRIAN MILLER

Contact Information

Contractor Pearl Remodeling; Lic. No.: 955824-B 6803 YARMOUTH AVENUE      RESEDA, CA 91335
Engineer Standley,, Craig Erick; Lic. No.: C87675 5330 ZELZAH AVE UNIT 7      ENCINO, CA 91316

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 10/30/2020 Corrections Issued JOHNNY MIRANDA
ELECTRICAL-Rough 10/30/2020 Corrections Issued JOHNNY MIRANDA
HVAC-Rough 10/30/2020 Corrections Issued JOHNNY MIRANDA
PLUMBING-Rough 10/30/2020 Approved JOHNNY MIRANDA
Wood Frame 10/30/2020 Not Ready for Inspection JOHNNY MIRANDA
BUILDING-Rough-Frame 11/4/2020 Not Ready for Inspection OGANES TARAKHCHYAN
ELECTRICAL-Rough 11/4/2020 Partial Inspection OGANES TARAKHCHYAN
HVAC-Rough 11/4/2020 Corrections Issued OGANES TARAKHCHYAN
Interior/Exterior Lathing 11/4/2020 Not Ready for Inspection OGANES TARAKHCHYAN
Insulation 11/16/2020 Partial Approval KEVIN SARGSYAN
Interior/Exterior Lathing 11/16/2020 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 11/19/2020 Partial Approval RICHARD ROBLES
Shower Pan 11/19/2020 Approved RICHARD ROBLES
ELECTRICAL-Rough 11/24/2020 Corrections Issued RICHARD ROBLES
HVAC-Rough 11/24/2020 No Access for Inspection RICHARD ROBLES
BUILDING-Rough-Frame 11/30/2020 Approved OGANES TARAKHCHYAN
Drywall Nailing 11/30/2020 Not Ready for Inspection OGANES TARAKHCHYAN
ELECTRICAL-Rough 11/30/2020 Approved OGANES TARAKHCHYAN
HVAC-Rough 11/30/2020 Approved OGANES TARAKHCHYAN
Wood Frame 11/30/2020 Approved OGANES TARAKHCHYAN
Drywall Nailing 12/4/2020 Approved RICHARD ROBLES
Interior/Exterior Lathing 12/4/2020 Approved RICHARD ROBLES
Final 4/30/2021 Permit Finaled KENNETH NAGLE
SGSOV-Seismic Gas S/O Valve 4/30/2021 SGSOV Approved KENNETH NAGLE
Smoke Detectors 4/30/2021 Approved KENNETH NAGLE