4841 N DON PIO DR 91364

Certificate Information: 4841 N DON PIO DR 91364

Application / Permit
20016-20000-20286
Plan Check / Job No.
B20VN10756
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL (E) BATHROOMS, BEDROOM AND KITCHEN, REPLACE (E) WINDOWS AT KITCHEN/BATHROOM, REPLACE (E) WATER HEATER WITH (N) TANKLESS WATER HEATER. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 9/24/2020
Issuing Office
Current Status
Permit Finaled on 3/9/2021

Permit Application Status History

Submitted 8/19/2020 APPLICANT
Assigned to Plan Check Engineer 8/21/2020 JENNIFER LEE
Corrections Issued 8/24/2020 JENNIFER LEE
Plan Check Approved 9/23/2020 JENNIFER LEE
Issued 9/24/2020 APPLICANT
Permit Finaled 3/8/2021 DAVID SANDOVAL

Permit Application Clearance Information

Address approval Cleared 9/1/2020 ADRIAN CASTRO
Eng Process Fee Ord 176,300 Cleared 9/2/2020 ADRIAN CASTRO
Specific Plan Cleared 9/4/2020 PABLO ESTRADA
Grading Pre-Inspection Cleared 9/9/2020 BARTON HOLMES

Contact Information

Contractor Spazio La Designs; Lic. No.: 1006766-B 10620 MAGNOLIA BLVD      NORTH HOLLYWOOD, CA 91601
Engineer Karapetian,, Arbi; Lic. No.: C79953 21520 BURBANK BLVD APT 219      WOODLAND HILLS, CA 91367

Inspector Information

JOHN HAYES, (818) 774-4302 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 10/16/2020 Approved RONALD COWAN
BUILDING-Rough-Frame 10/26/2020 Corrections Issued RONALD COWAN
ELECTRICAL-Rough 10/26/2020 Approved RONALD COWAN
PLUMBING-Rough 10/26/2020 Approved RONALD COWAN
BUILDING-Rough-Frame 11/9/2020 Not Ready for Inspection DONALD SUNSERI
Insulation 11/9/2020 Not Ready for Inspection DONALD SUNSERI
Shower Pan 11/9/2020 Approved DONALD SUNSERI
Insulation 12/18/2020 Approved VINCENT HANLEY
Interior/Exterior Lathing 12/24/2020 Approved JENNIFER RABUCHIN
ELECTRICAL-Final 3/8/2021 Approved DAVID SANDOVAL
Final 3/8/2021 Permit Finaled DAVID SANDOVAL
HVAC-Final 3/8/2021 Approved DAVID SANDOVAL
PLUMBING-Final 3/8/2021 Approved DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 3/8/2021 SGSOV Approved DAVID SANDOVAL
Smoke Detectors 3/8/2021 Approved DAVID SANDOVAL