5101 S EDSEL AVE 90066

Certificate Information: 5101 S EDSEL AVE 90066

Application / Permit
20016-20000-19725
Plan Check / Job No.
B20VN10503
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR/EXTERIOR REMODEL TO REMOVE EX WALLS BETWEEN DINING/KITCHEN/FAMILY RM TO CREATE ONE OPEN KITCHEN/DINING ROOM. DEMO EX WINDOWS/DOORS WITHIN KITCHEN/DINING RM FOR TWO NEW SLIDING DOORS PER PLAN. THIS WORK TO INCLUDE KITCHEN REMODEL. ALL WORK AT 1ST FLR.
Permit Issued
Issued on 1/7/2021
Issuing Office
Current Status
Permit Finaled on 7/30/2021

Permit Application Status History

Submitted 9/10/2020 APPLICANT
Assigned to Plan Check Engineer 9/17/2020 HAYATO TSUCHIYA
Corrections Issued 9/18/2020 HAYATO TSUCHIYA
Plan Check Approved 12/2/2020 HAYATO TSUCHIYA
Issued 1/7/2021 APPLICANT
Permit Finaled 7/30/2021 RYAN BARNES

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Treeium Inc; Lic. No.: 617148-B 5352 LAUREL CANYON BLVD #200      VALLEY VILLAGE, CA 91607
Engineer Maalouf,, Sami; Lic. No.: C53210 15445 VENTURA BLVD STE 367      SHERMAN OAKS, CA 91403

Inspector Information

MORRIS JACKSON, (310) 914-3885 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 2/16/2021 Approved DAVID HEINE
Footing/Foundation/Slab 2/16/2021 Approved DAVID HEINE
Wood Frame 3/8/2021 Conditional Approval DAVID HEINE
ELECTRICAL-Rough 3/18/2021 Approved DAVID HEINE
PLUMBING-Rough 3/18/2021 Approved DAVID HEINE
BUILDING-Rough-Frame 3/24/2021 Corrections Issued BRENDAN LOONEY
MERV13>=Rough 3/24/2021 Approved BRENDAN LOONEY
Wood Frame 3/31/2021 Approved PIERRE VEGA
Drywall Nailing 4/7/2021 Approved PIERRE VEGA
Interior/Exterior Lathing 5/12/2021 Not Ready for Inspection ENRIQUE MIRELES
Interior/Exterior Lathing 5/13/2021 Corrections Issued BRENDAN LOONEY
BUILDING-Rough-Frame 7/19/2021 Not Ready for Inspection BRENDAN LOONEY
MERV13>=Final 7/19/2021 Not Ready for Inspection BRENDAN LOONEY
SGSOV-Seismic Gas S/O Valve 7/19/2021 SGSOV Not Ready BRENDAN LOONEY
Smoke Detectors 7/19/2021 Not Ready for Inspection BRENDAN LOONEY
Final 7/21/2021 Corrections Issued ENRIQUE MIRELES
ELECTRICAL-Final 7/23/2021 Approved GERMAN RODRIGUEZ MENDOZA
PLUMBING-Final 7/23/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 7/28/2021 Approved ENRIQUE MIRELES
Final 7/28/2021 Corrections Issued ENRIQUE MIRELES
MERV13>=Final 7/28/2021 Approved ENRIQUE MIRELES
PLUMBING-Final 7/28/2021 Approved ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 7/28/2021 SGSOV Approved ENRIQUE MIRELES
Smoke Detectors 7/28/2021 Approved ENRIQUE MIRELES
ELECTRICAL-Final 7/30/2021 Approved RYAN BARNES
Final 7/30/2021 Permit Finaled RYAN BARNES
PLUMBING-Final 7/30/2021 Approved RYAN BARNES