13331 W MULHOLLAND DR 90210

Certificate Information: 13331 W MULHOLLAND DR 90210

Application / Permit
20016-20000-17043
Plan Check / Job No.
B20VN09361
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO (E) SINGLE FAMILY DWELLING. REMOVE AND REPLACE REAR WALL WINDOWS AND ADD NEW BI-FOLD DOOR. REMOVE AND REPLACE ENTRY DOOR AND WINDOWS. ADD NEW BATHROOM. REMODEL MASTER BATHROOM TO ADD NEW WALK IN CLOSET. REMODEL KITCHEN.
Permit Issued
Issued on 12/18/2020
Issuing Office
Current Status
Permit Finaled on 6/17/2021

Permit Application Status History

Submitted 7/16/2020 APPLICANT
Assigned to Plan Check Engineer 8/6/2020 SARKIS HARABEDIAN
Corrections Issued 8/8/2020 SARKIS HARABEDIAN
Quality Review Completed 9/1/2020 STEVEN KIM
Applicant returned to address corrections 9/21/2020 SARKIS HARABEDIAN
Plan Check Approved 12/18/2020 SARKIS HARABEDIAN
Issued 12/18/2020 APPLICANT
Permit Finaled 6/17/2021 ARAM AVEDISIAN

Permit Application Clearance Information

Specific Plan Cleared 8/24/2020 MARITZA PRZEKOP
Eng Process Fee Ord 176,300 Cleared 9/11/2020 ADRIAN CASTRO
Grading Pre-Inspection Cleared 12/16/2020 PATRICK MISCHLICH

Contact Information

Contractor Racing Green Ltd; Lic. No.: 992206-B 3873 BERRY DR      STUDIO CITY, CA 91604
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 12/24/2020 Partial Approval ARAM AVEDISIAN
Deputy Drilled-In Anchors 12/24/2020 Conditional Approval ARAM AVEDISIAN
ELECTRICAL-Rough 12/24/2020 Approved ARAM AVEDISIAN
Footing/Foundation/Slab 12/24/2020 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 12/24/2020 Partial Approval ARAM AVEDISIAN
PLUMBING-Rough 12/24/2020 Approved ARAM AVEDISIAN
Shower Pan 1/4/2021 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 1/7/2021 Partial Approval ARAM AVEDISIAN
Wood Frame 2/1/2021 Approved ARAM AVEDISIAN
Drywall Nailing 2/17/2021 Approved ARAM AVEDISIAN
Final 6/17/2021 Permit Finaled ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 6/17/2021 SGSOV Approved ARAM AVEDISIAN
Smoke Detectors 6/17/2021 Approved ARAM AVEDISIAN