3610 N WRIGHTWOOD DR 91604

Certificate Information: 3610 N WRIGHTWOOD DR 91604

Application / Permit
20016-20000-15779
Plan Check / Job No.
B20VN08819
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO (E) SFD. REMOVE PORTION OF INT. LOAD BEARING WALL BETWEEN DINING ROOM AND KITCHEN, VAULT THE CEILING IN DINING ROOM, REMODEL (E) KITCHEN AND REPLACE ALL WINDOWS SAME SIZE. WORK PER ENGINEER.
Permit Issued
Issued on 11/3/2020
Issuing Office
Current Status
Permit Finaled on 6/25/2021

Permit Application Status History

Submitted 7/3/2020 APPLICANT
Assigned to Plan Check Engineer 7/8/2020 ROSENDO MEDINA
Corrections Issued 7/11/2020 ROSENDO MEDINA
Plan Check Approved 10/19/2020 ROSENDO MEDINA
Issued 11/3/2020 APPLICANT
Permit Finaled 6/25/2021 RAUL BARAJAS

Permit Application Clearance Information

Specific Plan Cleared 7/15/2020 MIGUEL GAMBOA
Grading Pre-Inspection Cleared 9/25/2020 BRIAN MILLER

Contact Information

Contractor Kopplin Construction Company; Lic. No.: 932319-B 8700 PERSHING DR UNIT 1109      PLAYA DEL REY, CA 90293
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/17/2020 Not Ready for Inspection BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 12/2/2020 Approved BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 12/17/2020 Approved BRIAN SULLIVAN
Wood Frame 1/7/2021 Not Ready for Inspection BRIAN SULLIVAN
Rough-Elec/Plmb/HVAC 1/12/2021 Partial Approval BRIAN SULLIVAN
PLUMBING-Rough 1/13/2021 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 1/15/2021 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 1/21/2021 Partial Approval BRIAN SULLIVAN
ELECTRICAL-Rough 1/21/2021 Approved BRIAN SULLIVAN
Insulation 1/27/2021 Not Ready for Inspection BRIAN SULLIVAN
Insulation 1/29/2021 Approved RAUL BARAJAS
Drywall Nailing 2/5/2021 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 4/9/2021 Partial Approval BRIAN SULLIVAN
ELECTRICAL-Final 6/16/2021 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Final 6/16/2021 Not Ready for Inspection BRIAN SULLIVAN
Final 6/21/2021 Corrections Issued BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 6/21/2021 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 6/21/2021 Approved BRIAN SULLIVAN
Final 6/25/2021 Permit Finaled RAUL BARAJAS