3610 N WRIGHTWOOD DR 91604
Certificate Information: 3610 N WRIGHTWOOD DR 91604
- Application / Permit
- 20016-20000-15779
- Plan Check / Job No.
- B20VN08819
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- INTERIOR REMODEL TO (E) SFD. REMOVE PORTION OF INT. LOAD BEARING WALL BETWEEN DINING ROOM AND KITCHEN, VAULT THE CEILING IN DINING ROOM, REMODEL (E) KITCHEN AND REPLACE ALL WINDOWS SAME SIZE. WORK PER ENGINEER.
- Permit Issued
- Issued on 11/3/2020
- Issuing Office
- Current Status
- Permit Finaled on 6/25/2021
Permit Application Status History
| Submitted | 7/3/2020 | APPLICANT |
| Assigned to Plan Check Engineer | 7/8/2020 | ROSENDO MEDINA |
| Corrections Issued | 7/11/2020 | ROSENDO MEDINA |
| Plan Check Approved | 10/19/2020 | ROSENDO MEDINA |
| Issued | 11/3/2020 | APPLICANT |
| Permit Finaled | 6/25/2021 | RAUL BARAJAS |
Permit Application Clearance Information
| Specific Plan | Cleared | 7/15/2020 | MIGUEL GAMBOA |
| Grading Pre-Inspection | Cleared | 9/25/2020 | BRIAN MILLER |
Contact Information
| Contractor | Kopplin Construction Company; Lic. No.: 932319-B | 8700 PERSHING DR UNIT 1109 PLAYA DEL REY, CA 90293 |
| Engineer | Melchor,, Oscar Elias; Lic. No.: C76828 | 21243 VENTURA BLVD SUITE 119 WOODLAND HILLS, CA 91364 |
Inspector Information
| ROY SPAULDING, (213) 202-3461 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 11/17/2020 | Not Ready for Inspection | BRIAN SULLIVAN |
| Excavation/Setback/Form/Re-Bar | 12/2/2020 | Approved | BRIAN SULLIVAN |
| Excavation/Setback/Form/Re-Bar | 12/17/2020 | Approved | BRIAN SULLIVAN |
| Wood Frame | 1/7/2021 | Not Ready for Inspection | BRIAN SULLIVAN |
| Rough-Elec/Plmb/HVAC | 1/12/2021 | Partial Approval | BRIAN SULLIVAN |
| PLUMBING-Rough | 1/13/2021 | Not Ready for Inspection | BRIAN SULLIVAN |
| PLUMBING-Rough | 1/15/2021 | Approved | BRIAN SULLIVAN |
| BUILDING-Rough-Frame | 1/21/2021 | Partial Approval | BRIAN SULLIVAN |
| ELECTRICAL-Rough | 1/21/2021 | Approved | BRIAN SULLIVAN |
| Insulation | 1/27/2021 | Not Ready for Inspection | BRIAN SULLIVAN |
| Insulation | 1/29/2021 | Approved | RAUL BARAJAS |
| Drywall Nailing | 2/5/2021 | Approved | BRIAN SULLIVAN |
| Interior/Exterior Lathing | 4/9/2021 | Partial Approval | BRIAN SULLIVAN |
| ELECTRICAL-Final | 6/16/2021 | Not Ready for Inspection | BRIAN SULLIVAN |
| PLUMBING-Final | 6/16/2021 | Not Ready for Inspection | BRIAN SULLIVAN |
| Final | 6/21/2021 | Corrections Issued | BRIAN SULLIVAN |
| SGSOV-Seismic Gas S/O Valve | 6/21/2021 | SGSOV Approved | BRIAN SULLIVAN |
| Smoke Detectors | 6/21/2021 | Approved | BRIAN SULLIVAN |
| Final | 6/25/2021 | Permit Finaled | RAUL BARAJAS |