3106 W BERKELEY AVE #1 90026

Certificate Information: 3106 W BERKELEY AVE #1 90026

Application / Permit
20016-20000-11631
Plan Check / Job No.
X20VN06993
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
Window (30) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b)1B of Title 24. Kitchen/bathroom remodel for residential buildings (no structural changes). Replacement of damaged framing members (less than 10% of replacement cost of building) for houses and duplexes (not including decks). Replace drywall (no new walls added) for single family dwellings and duplexes only.
Permit Issued
Issued on 5/20/2020
Issuing Office
Current Status
Permit Finaled on 9/12/2020

Permit Application Status History

Issued 5/20/2020 APPLICANT
Permit Finaled 9/11/2020 STUART CHAPMAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Almax Construction Management; Lic. No.: 1065273-B 8504 FIRESTONE BLVD #240      DOWNEY, CA 90241

Inspector Information

HAMIK HARTOUNIAN, (213) 202-3275 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Wood Frame 5/22/2020 Corrections Issued ROBERT VORHIS
Wood Frame 6/6/2020 Not Ready for Inspection MATTHEW NUCKOLLS
Wood Frame 6/13/2020 Conditional Approval JOSEPH MCGARRY
Insulation 6/16/2020 Approved THOMAS LOGRASSO
Interior/Exterior Lathing 6/16/2020 Approved THOMAS LOGRASSO
Drywall Nailing 6/17/2020 Approved THOMAS LOGRASSO
Final 9/8/2020 Partial Approval ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 9/8/2020 SGSOV Not Ready ENRIQUE MIRELES
Smoke Detectors 9/8/2020 Partial Approval ENRIQUE MIRELES
Final 9/10/2020 Conditional Approval STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 9/10/2020 SGSOV Approved STUART CHAPMAN
Smoke Detectors 9/10/2020 Approved STUART CHAPMAN
Final 9/11/2020 Permit Finaled STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 9/11/2020 SGSOV Approved STUART CHAPMAN
Smoke Detectors 9/11/2020 Approved STUART CHAPMAN