5159 N AMESTOY AVE 91316

Certificate Information: 5159 N AMESTOY AVE 91316

Application / Permit
20016-20000-09504
Plan Check / Job No.
B20VN05604
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL AND ALTERATIONS TO THE (E) DINING AND FAMILY ROOMS. RAISE THE CEILING AND ROOF OVER THE FAMILY ROOM AND RAISE THE FLOOR BY 7" TO BE THE SAME LEVEL AS THE DINING ROOM. NEW POCKET DOOR. ALL WORK PER ENGINEERING
Permit Issued
Issued on 5/6/2020
Issuing Office
Valley
Current Status
Permit Finaled on 10/1/2020

Permit Application Status History

Submitted 4/15/2020 APPLICANT
Assigned to Plan Check Engineer 4/20/2020 JEFFREY TANGONAN
Plan Check Approved 4/22/2020 JEFFREY TANGONAN
Issued 5/6/2020 LADBS
Permit Finaled 10/1/2020 STEVEN BACK

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Mnm Remodeling Inc; Lic. No.: 1003511-B 6200 CANOGA AVE SUITE 207      WOODLAND HILLS, CA 91367
Engineer Helou,, Dawn Renee; Lic. No.: C52361 22701 ERWIN ST      WOODLAND HILLS, CA 91367

Inspector Information

JON MCHUGH, (818) 774-4348 Office Hours: 7:00-8:00 AM MON-FRI
IVAN SARABIA, (818) 774-4348 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 5/12/2020 Not Ready for Inspection STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 5/12/2020 Partial Approval STEVEN BACK
Footing/Foundation/Slab 5/12/2020 Corrections Issued STEVEN BACK
BUILDING-Rough-Frame 5/14/2020 Partial Approval STEVEN BACK
Footing/Foundation/Slab 5/14/2020 Approved STEVEN BACK
Rough-Elec/Plmb/HVAC 5/27/2020 Not Ready for Inspection STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 6/8/2020 Partial Approval STEVEN BACK
Rough-Elec/Plmb/HVAC 6/8/2020 Not Ready for Inspection STEVEN BACK
BUILDING-Rough-Frame 6/10/2020 Partial Approval STEVEN BACK
Insulation 6/10/2020 Approved STEVEN BACK
Rough-Elec/Plmb/HVAC 6/10/2020 Partial Approval STEVEN BACK
BUILDING-Rough-Frame 7/20/2020 Corrections Issued STEVEN BACK
Drywall Nailing 7/20/2020 Corrections Issued STEVEN BACK
BUILDING-Rough-Frame 8/10/2020 Approved STEVEN BACK
Drywall Nailing 8/10/2020 Not Ready for Inspection STEVEN BACK
Interior/Exterior Lathing 8/10/2020 Not Ready for Inspection STEVEN BACK
Drywall Nailing 8/14/2020 Approved STEVEN BACK
Interior/Exterior Lathing 8/14/2020 Approved STEVEN BACK
SGSOV-Seismic Gas S/O Valve 9/30/2020 SGSOV Not Ready STEVEN BACK
Final 10/1/2020 Permit Finaled STEVEN BACK
SGSOV-Seismic Gas S/O Valve 10/1/2020 SGSOV Approved STEVEN BACK
Smoke Detectors 10/1/2020 Approved STEVEN BACK