2421 N DITMAN AVE 90032

Certificate Information: 2421 N DITMAN AVE 90032

Application / Permit
20016-20000-08906
Plan Check / Job No.
B20VN05295
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED INT/EXT REMODEL: REMOVE WALL BETWEEN EX KITCHEN/DINING RM & LIVING RM TO CREATE OPEN KITCHEN/DINING/LIVING RM AREA. DEMO EX LAUNDRY RM. REMODEL EX BATHRM, NEW LAUNDRY RM & NEW CLOSETS PER PLAN. ONE NEW WINDOW WITHIN LIVING RM. CLOSE UP EX OPENINGS & REDUCE THE SIZE OF EX SLIDING DR WITHIN KITCHEN. KITCHEN REMODEL. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 2/10/2021
Issuing Office
Valley
Current Status
Permit Finaled on 9/28/2021

Permit Application Status History

Plan Check Approved 7/2/2020 RAPHAEL ROSAS
Issued 2/10/2021 APPLICANT
Permit Finaled 9/27/2021 RUBEN SALAS

Permit Application Clearance Information

"Q" conditions Cleared 4/30/2020 RUBEN VASQUEZ
ZI Cleared 4/30/2020 RUBEN VASQUEZ
Grading Pre-Inspection Cleared 5/14/2020 BRIAN MILLER

Contact Information

Contractor My Home Builders Inc; Lic. No.: 1002927-B 20720 VENTURA BLVD #280      WOODLAND HILLS, CA 91364
Engineer Dominguez,, Refugio; Lic. No.: C50820 254 COTTONWOOD ST      ONTARIO, CA 91761

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 3/22/2021 Approved OSVALDO PARAMO
PLUMBING-Rough 3/22/2021 Approved OSVALDO PARAMO
Wood Frame 3/22/2021 Approved OSVALDO PARAMO
Insulation 3/31/2021 Approved OSVALDO PARAMO
Interior/Exterior Lathing 3/31/2021 Approved OSVALDO PARAMO
Shower Pan 3/31/2021 Approved OSVALDO PARAMO
Drywall Nailing 4/12/2021 Approved RICHARD STEINBACH
Interior/Exterior Lathing 4/12/2021 Partial Approval RICHARD STEINBACH
Final 6/22/2021 Corrections Issued OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 6/22/2021 SGSOV Not Ready OSVALDO PARAMO
Smoke Detectors 6/22/2021 Approved OSVALDO PARAMO
Final 8/16/2021 Corrections Issued ASHLEY THOMPSON
Pre-Inspection 8/16/2021 Partial Inspection ALAN MORELOS
SGSOV-Seismic Gas S/O Valve 8/16/2021 SGSOV Not Ready ASHLEY THOMPSON
ELECTRICAL-Final 9/27/2021 Approved RUBEN SALAS
Final 9/27/2021 Permit Finaled RUBEN SALAS
HVAC-Final 9/27/2021 Approved RUBEN SALAS
PLUMBING-Final 9/27/2021 Approved RUBEN SALAS
SGSOV-Seismic Gas S/O Valve 9/27/2021 SGSOV Approved RUBEN SALAS