1912 N PHILLIPS WAY 90042
Certificate Information: 1912 N PHILLIPS WAY 90042
- Application / Permit
- 20016-20000-08512
- Plan Check / Job No.
- B20VN05120
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- INTERIOR REMODEL TO (E) SFD TO CONVERT (2) BEDROOMS ON THE FIRST FLOOR TO (1) BEDROOM AND CONVERT (2) BEDROOMS ON THE SECOND FLOOR TO (1) BEDROOM & BATHROOM. ALL WORK DONE PER STRUCTURAL ENGINEERING.
- Permit Issued
- Issued on 6/4/2020
- Issuing Office
- Current Status
- Permit Finaled on 1/19/2022
Permit Application Status History
| Plan Check Approved | 5/22/2020 | GURUNATH NESARAJAH |
| Issued | 6/4/2020 | APPLICANT |
| Permit Finaled | 1/18/2022 | CRAIG VAUGHAN |
Permit Application Clearance Information
| Grading Pre-Inspection | Cleared | 5/20/2020 | VASIL MIHALEV |
Contact Information
| Contractor | La Remodeling Co; Lic. No.: 932510-B | 6000 YORK BLVD STE A LOS ANGELES, CA 90042 |
| Engineer | Wu,, Harold Ping-Hung; Lic. No.: C35693 | 1168 SAN GABRIEL BLVD NO N ROSEMEAD, CA 91770 |
Inspector Information
| RONNIE MEDINA, (213) 469-5852 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 6/8/2020 | Approved | CRAIG VAUGHAN |
| ELECTRICAL-Rough | 7/30/2020 | Partial Approval | CRAIG VAUGHAN |
| HVAC-Rough | 7/30/2020 | Not Ready for Inspection | CRAIG VAUGHAN |
| PLUMBING-Rough | 7/30/2020 | Partial Approval | CRAIG VAUGHAN |
| Wood Frame | 7/30/2020 | Partial Approval | CRAIG VAUGHAN |
| Wood Frame | 8/12/2020 | Not Ready for Inspection | CRAIG VAUGHAN |
| Wood Frame | 8/17/2020 | Partial Approval | CRAIG VAUGHAN |
| Wood Frame | 8/20/2020 | Approved | CRAIG VAUGHAN |
| Drywall Nailing | 8/27/2020 | Approved | CHRISTOPHER DELLEFIELD |
| Interior/Exterior Lathing | 9/1/2020 | Approved | CRAIG VAUGHAN |
| ELECTRICAL-Rough | 11/23/2020 | Partial Approval | CRAIG VAUGHAN |
| HVAC-Rough | 11/23/2020 | Partial Approval | CRAIG VAUGHAN |
| PLUMBING-Rough | 11/23/2020 | Approved | CRAIG VAUGHAN |
| Wood Frame | 11/23/2020 | Partial Approval | CRAIG VAUGHAN |
| Final | 8/31/2021 | Corrections Issued | CRAIG VAUGHAN |
| SGSOV-Seismic Gas S/O Valve | 8/31/2021 | SGSOV Approved | CRAIG VAUGHAN |
| Smoke Detectors | 8/31/2021 | Approved | CRAIG VAUGHAN |
| Final | 1/18/2022 | Permit Finaled | CRAIG VAUGHAN |