12261 W THELMA ST 91352

Certificate Information: 12261 W THELMA ST 91352

Application / Permit
20016-20000-07047
Plan Check / Job No.
B20VN04294
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL AND ALTERATIONS TO ADD NON LOAD BEARING WALLS TO CREATE A NEW BEDROOM AND A BATHROOM, REMODEL (E)KITCHEN AND (E)BATHROOM, REPLACE 8 (E) WINDOWS SAME SIZE AND LOCATION, REPLACE (E)WINDOW WITH (N) 4' x 4' WINDOW AT BEDROOM, REPLACE (E)DOOR WITH (N) 32" x 80" DOOR AT BATHROOM AND RE-ROOF WITH CLASS A OR B ROOF COVERING MATERIAL WEIGHING LESS THAN 6 POUNDS PER SQ.FT. OVER EXISTING SOLID SHEATING.
Permit Issued
Issued on 3/10/2020
Issuing Office
Valley
Current Status
Permit Finaled on 5/18/2020

Permit Application Status History

Submitted 3/10/2020 APPLICANT
Assigned to Plan Check Engineer 3/10/2020 SARKIS HARABEDIAN
Plan Check Approved 3/10/2020 SARKIS HARABEDIAN
Issued 3/10/2020 LADBS
Permit Finaled 5/18/2020 THOMAS FINNILA

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,

Inspector Information

MATTHEW NELSON, (818) 374-1170 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 4/10/2020 Corrections Issued JOHN HAYES
ELECTRICAL-Rough 4/10/2020 Not Ready for Inspection JOHN HAYES
MERV13>=Rough 4/10/2020 Not Ready for Inspection JOHN HAYES
PLUMBING-Rough 4/10/2020 Not Ready for Inspection JOHN HAYES
Wood Frame 4/10/2020 Not Ready for Inspection JOHN HAYES
BUILDING-Rough-Frame 4/14/2020 Not Ready for Inspection JOHN HAYES
Rough-Elec/Plmb/HVAC 4/14/2020 Approved JOHN HAYES
Special/Order Compliance 4/14/2020 Not Ready for Inspection JOHN HAYES
BUILDING-Rough-Frame 4/16/2020 Approved JOHN HAYES
MERV13>=Rough 4/16/2020 Approved JOHN HAYES
Rough-Elec/Plmb/HVAC 4/16/2020 Approved JOHN HAYES
Final 5/14/2020 Not Ready for Inspection JOHN HAYES
MERV13>=Final 5/14/2020 Approved JOHN HAYES
SGSOV-Seismic Gas S/O Valve 5/14/2020 SGSOV Approved JOHN HAYES
Smoke Detectors 5/14/2020 Not Ready for Inspection JOHN HAYES
Final 5/18/2020 Permit Finaled THOMAS FINNILA
Smoke Detectors 5/18/2020 Approved THOMAS FINNILA