5123-5123 1/2 E IRVINGTON TER 90042

Certificate Information: 5123-5123 1/2 E IRVINGTON TER 90042

Application / Permit
20016-20000-06585
Plan Check / Job No.
B20VN03982
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
PROPOSED INT REMODEL (5123 E. IRVING TR) - REMOVE INT WALL WITHIN EX COMBINED KITCHEN/LIVING RM PER PLAN. THEN CONSTR NEW WALL TO 'SEPARATE' KITCHEN & LIVING RM AND ALSO TO CREATE DINING RM. REMOVE & REPLACE EX WINDOWS W/ DIFF SIZE/LOCATION PER PLAN. REPLACE ONE WINDOW W/ SLIDING DOOR. THIS PERMIT TO INCLUDE KITCHEN REMODEL. SEE COMMENTS.
Permit Issued
Issued on 8/6/2020
Issuing Office
Current Status
Permit Finaled on 11/29/2022

Permit Application Status History

Submitted 3/5/2020 APPLICANT
Assigned to Plan Check Engineer 3/6/2020 HAYATO TSUCHIYA
Corrections Issued 3/10/2020 HAYATO TSUCHIYA
Building Plans Picked Up 3/11/2020 APPLICANT
Applicant returned to address corrections 4/8/2020 HAYATO TSUCHIYA
Applicant returned to address corrections 5/4/2020 HAYATO TSUCHIYA
Applicant returned to address corrections 7/27/2020 HAYATO TSUCHIYA
Plan Check Approved 8/4/2020 HAYATO TSUCHIYA
Issued 8/6/2020 APPLICANT
Permit Finaled 11/29/2022 HAMIK HARTOUNIAN

Permit Application Clearance Information

Tenant Habitability Plan Cleared 7/13/2020 STEVEN HOFSTAD

Contact Information

Contractor Owner-Builder       ,
Engineer Khazra,, Afshin; Lic. No.: C50250 22855 PAUL REVERE DR      CALABASAS, CA 91302

Inspector Information

NICHOLAS LOPEZ, (213) 202-3224 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/12/2020 Corrections Issued HAMIK HARTOUNIAN
Wood Frame 9/8/2020 Partial Approval HAMIK HARTOUNIAN
Drywall Nailing 9/22/2020 Conditional Approval HAMIK HARTOUNIAN
Final 2/7/2022 Corrections Issued HAMIK HARTOUNIAN
SGSOV-Seismic Gas S/O Valve 2/7/2022 SGSOV Not Ready HAMIK HARTOUNIAN
Smoke Detectors 2/7/2022 Approved HAMIK HARTOUNIAN
Final 11/1/2022 Corrections Issued HAMIK HARTOUNIAN
SGSOV-Seismic Gas S/O Valve 11/1/2022 SGSOV Approved HAMIK HARTOUNIAN
Final 11/29/2022 Permit Finaled HAMIK HARTOUNIAN