2362 N ALLVIEW TER EAST 90068

Certificate Information: 2362 N ALLVIEW TER EAST 90068

Application / Permit
20016-20000-04247
Plan Check / Job No.
X20VN03480
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Window (6) and door (4) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b)1B of Title 24. Kitchen/bathroom (1) remodel for residential buildings (no structural changes) combined with MEP. Replace drywall (no new walls added) for single family dwellings and duplexes only. Re-stucco for single family dwellings and duplexes only. Water damage repair less than 10% of replacement cost of residential building.
Permit Issued
Issued on 2/12/2020
Issuing Office
Valley
Current Status
Permit Finaled on 12/17/2020

Permit Application Status History

Issued 2/12/2020 LADBS
Permit Finaled 12/16/2020 JOHN TCHANG

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Salt Mine Design Build Inc; Lic. No.: 996933-B 1719 OAK DRIVE      TOPANGA, CA 90290

Inspector Information

JOEL ORDAZ, (213) 252-3049 Office Hours: 7:00-8:00 AM MON-FRI
PTOLEMY HILL, (213) 252-3049 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVAKIAN, (213) 252-3049 Office Hours: 7:00-8:00 AM MON-FRI
EDMOND DECKERT, (213) 252-3049 Office Hours: 7:00-8:00 AM MON-FRI
TIMOTHY KEY, (213) 252-3049 Office Hours: 7:00-8:00 AM MON-FRI
ROBERT CHAVEZ, (213) 252-3049 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Wood Frame 7/13/2020 Not Ready for Inspection GORDON ZUBER
Smoke Detectors 8/17/2020 Not Ready for Inspection GORDON ZUBER
Interior/Exterior Lathing 8/27/2020 Partial Approval JOHN TCHANG
Interior/Exterior Lathing 9/10/2020 Approved JOHN TCHANG
Interior/Exterior Lathing 9/15/2020 Approved JOHN TCHANG
Drywall Nailing 9/28/2020 Partial Approval JOHN TCHANG
Interior/Exterior Lathing 10/6/2020 Partial Approval JOHN TCHANG
Insulation 10/8/2020 Approved JOHN TCHANG
Interior/Exterior Lathing 10/8/2020 Approved JOHN TCHANG
Final 10/9/2020 Not Ready for Inspection JOHN TCHANG
Insulation 10/9/2020 Approved JOHN TCHANG
Interior/Exterior Lathing 10/9/2020 Approved JOHN TCHANG
SGSOV-Seismic Gas S/O Valve 10/9/2020 SGSOV Not Ready JOHN TCHANG
Smoke Detectors 10/9/2020 Not Ready for Inspection JOHN TCHANG
Final 11/24/2020 Not Ready for Inspection JOHN TCHANG
SGSOV-Seismic Gas S/O Valve 11/24/2020 SGSOV Not Ready JOHN TCHANG
Smoke Detectors 11/24/2020 Approved JOHN TCHANG
Final 12/2/2020 Partial Approval JOHN TCHANG
SGSOV-Seismic Gas S/O Valve 12/2/2020 SGSOV Approved JOHN TCHANG
Final 12/16/2020 Permit Finaled JOHN TCHANG