14703 W ALBERS ST 91411

Certificate Information: 14703 W ALBERS ST 91411

Application / Permit
20016-20000-02231
Plan Check / Job No.
B20VN01254
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) GARAGE TO (N) ACCESSORY DWELLING UNIT
Permit Issued
Issued on 2/13/2020
Issuing Office
Valley
Current Status
CofO Issued on 2/11/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/24/2020 APPLICANT
Assigned to Plan Check Engineer 1/24/2020 PINANK PATEL
Corrections Issued 2/3/2020 PINANK PATEL
Plan Check Approved 2/13/2020 PINANK PATEL
Issued 2/13/2020 LADBS
CofO in Progress 2/11/2021 DANIEL ORRANTE
CofO Issued 2/11/2021 DANIEL ORRANTE
Permit Finaled 2/11/2021 DANIEL ORRANTE

Permit Application Clearance Information

Construction near power lines Cleared 2/4/2020 RIDWAN HARDY
Construction within easement Cleared 2/4/2020 RIDWAN HARDY
Address approval Cleared 2/7/2020 APEKSHYA BAJRACHARYA
Eng Process Fee Ord 176,300 Cleared 2/7/2020 APEKSHYA BAJRACHARYA
Roof/Waste drainage to street Cleared 2/7/2020 APEKSHYA BAJRACHARYA
Sewer availability Cleared 2/7/2020 APEKSHYA BAJRACHARYA

Contact Information

Contractor Krn Construction And Remodeling Inc; Lic. No.: 1047372-B 6433 TOPANGA CYN BLVD #483      CANOGA PARK, CA 91303

Inspector Information

DAVID ANDERSON, (818) 374-1166 Office Hours: 7:00-8:00 AM MON-FRI
RAUL OLAGI, (818) 374-1166 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/9/2020 Corrections Issued CHRISTOPHE COCHRAN
Footing/Foundation/Slab 3/10/2020 Approved CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 3/11/2020 Conditional Approval CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 3/23/2020 Corrections Issued MICHAEL TEMPLE
Green Building Rough 3/23/2020 Not Ready for Inspection MICHAEL TEMPLE
ELECTRICAL-Rough 3/28/2020 Corrections Issued MICHEL ABAJAN
Interior/Exterior Lathing 3/28/2020 Approved MICHEL ABAJAN
PLUMBING-Rough 3/28/2020 Not Ready for Inspection MICHEL ABAJAN
BUILDING-Rough-Frame 4/13/2020 Corrections Issued BRENDAN LOONEY
ELECTRICAL-Rough 4/13/2020 Not Ready for Inspection BRENDAN LOONEY
Green Building Rough 4/13/2020 Not Ready for Inspection BRENDAN LOONEY
Interior/Exterior Lathing 4/13/2020 Not Ready for Inspection BRENDAN LOONEY
PLUMBING-Rough 4/13/2020 Not Ready for Inspection BRENDAN LOONEY
Interior/Exterior Lathing 4/15/2020 Approved GREGG CUMMINGS
BUILDING-Rough-Frame 4/22/2020 Not Ready for Inspection MISAEL ESPARZA
Final 4/22/2020 Not Ready for Inspection MISAEL ESPARZA
Green Building Final 4/22/2020 Not Ready for Inspection MISAEL ESPARZA
Green Building Rough 4/22/2020 Not Ready for Inspection MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 4/22/2020 SGSOV Not Ready MISAEL ESPARZA
Smoke Detectors 4/22/2020 Not Ready for Inspection MISAEL ESPARZA
BUILDING-Rough-Frame 5/4/2020 Not Ready for Inspection TROY SANDERS
Green Building Rough 5/4/2020 Not Ready for Inspection TROY SANDERS
BUILDING-Rough-Frame 5/12/2020 Partial Approval TROY SANDERS
Green Building Rough 5/12/2020 Not Ready for Inspection TROY SANDERS
ELECTRICAL-Rough 6/16/2020 Partial Approval CHARLES POWELL
PLUMBING-Rough 6/24/2020 Corrections Issued DANIEL DREW
Sewer 6/24/2020 Corrections Issued DANIEL DREW
ELECTRICAL-Rough 6/26/2020 Not Ready for Inspection DANIEL DREW
Sewer 6/26/2020 Not Ready for Inspection DANIEL DREW
Sewer 7/1/2020 Approved CHARLES POWELL
ELECTRICAL-Rough 7/14/2020 Corrections Issued CHARLES POWELL
Gas Test 7/14/2020 Corrections Issued CHARLES POWELL
ELECTRICAL-Rough 7/29/2020 Approved MISAEL ESPARZA
HVAC-Rough 7/29/2020 Conditional Approval MISAEL ESPARZA
PLUMBING-Rough 7/29/2020 Approved MISAEL ESPARZA
BUILDING-Rough-Frame 8/17/2020 Partial Approval CHARLES POWELL
Green Building Rough 8/17/2020 Approved CHARLES POWELL
Insulation 8/17/2020 Approved CHARLES POWELL
Floor/Roof Diaphrgm/Shear Wall 8/28/2020 Corrections Issued CHARLES POWELL
Floor/Roof Diaphrgm/Shear Wall 9/2/2020 Approved CHARLES POWELL
Drywall Nailing 9/10/2020 Approved WILLIAM KUEHN
Shower Pan 9/18/2020 Approved BRENDAN LOONEY
Interior/Exterior Lathing 9/25/2020 Approved CHARLES POWELL
BUILDING-Rough-Frame 12/11/2020 Approved ARAM AVEDISIAN
Final 12/11/2020 Corrections Issued ARAM AVEDISIAN
Green Building Final 12/11/2020 Not Ready for Inspection ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 12/11/2020 SGSOV Not Ready ARAM AVEDISIAN
Smoke Detectors 12/11/2020 Not Ready for Inspection ARAM AVEDISIAN
Final 12/15/2020 Not Ready for Inspection DANIEL ORRANTE
Green Building Final 12/15/2020 Not Ready for Inspection DANIEL ORRANTE
SGSOV-Seismic Gas S/O Valve 12/15/2020 SGSOV Not Ready DANIEL ORRANTE
Smoke Detectors 12/15/2020 Not Ready for Inspection DANIEL ORRANTE
Final 12/24/2020 Conditional Approval JOHN HAYES
Green Building Final 12/24/2020 Approved JOHN HAYES
SGSOV-Seismic Gas S/O Valve 12/24/2020 SGSOV Approved JOHN HAYES
Smoke Detectors 12/24/2020 Approved JOHN HAYES