4542 W 17TH ST 90019

Certificate Information: 4542 W 17TH ST 90019

Application / Permit
20016-10000-33357
Plan Check / Job No.
B20LA24052
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY SEISMIC RETROFIT PER LABC CHAPTER 93 AT BUILDING PARKING GARAGE AREAS USING (1) BOX SPECIAL CANTILEVERED COLUMN WITH GRADE BEAM & (1) WOOD SHEAR WALL.
Permit Issued
Issued on 3/10/2021
Issuing Office
Current Status
CofC Issued on 1/6/2023

Permit Application Status History

Submitted 12/28/2020 APPLICANT
Assigned to Plan Check Engineer 1/13/2021 HANS SANTIAGO
Corrections Issued 1/19/2021 HANS SANTIAGO
Quality Review Completed 1/22/2021 DAVID CHANG
Plan Check Approved 3/1/2021 ANDREW SANTIAGO
Issued 3/10/2021 APPLICANT
OK for CofC 5/17/2021 JONATHAN QUACH
CofC Issued 1/6/2023 WINSTON DUNNING

Permit Application Clearance Information

Tenant Habitability Plan Cleared 3/5/2021 ISMAEL HERNANDEZ

Contact Information

Contractor Retrofitting360 Inc; Lic. No.: 1039226-B 19562 VENTURA BLVD# 230      TARZANA, CA 91356
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 743 S SIERRA VISTA AVE C      ALHAMBRA, CA 91801

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/8/2021 Approved DARRYL ARNOLD
Footing/Foundation/Slab 4/23/2021 Approved DARRYL ARNOLD
Deputy Steel/Welding 4/28/2021 Conditional Approval MARK FERRARI
Reinforced Concrete Frame 4/30/2021 Not Ready for Inspection DARRYL ARNOLD
Structural Steel Frame 4/30/2021 Not Ready for Inspection DARRYL ARNOLD
Wood Frame 4/30/2021 Conditional Approval DARRYL ARNOLD
Deputy Wood Construction 5/4/2021 Conditional Approval DARRYL ARNOLD
Footing/Foundation/Slab 5/4/2021 Conditional Approval DARRYL ARNOLD
Reinforced Concrete Frame 5/4/2021 Conditional Approval DARRYL ARNOLD
Structural Steel Frame 5/4/2021 Approved DARRYL ARNOLD
Wood Frame 5/4/2021 Conditional Approval DARRYL ARNOLD
Floor/Roof Diaphrgm/Shear Wall 5/5/2021 Conditional Approval DARRYL ARNOLD
Interior/Exterior Lathing 5/7/2021 Conditional Approval DARRYL ARNOLD
Final 5/17/2021 OK for CofC JONATHAN QUACH
METHANE-Final 5/17/2021 Approved JONATHAN QUACH
SGSOV-Seismic Gas S/O Valve 5/17/2021 SGSOV Approved JONATHAN QUACH
Smoke Detectors 5/17/2021 Approved JONATHAN QUACH