125 1/4-1/2 W 46TH ST 90037

Certificate Information: 125 1/4-1/2 W 46TH ST 90037

Application / Permit
20016-10000-33119
Plan Check / Job No.
B20LA23836
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
CONVERT EXISTING SINGLE FAMILY DWELLING TO A DUPLEX PER ADM-2020-657-UDU; MAKE 2ND STORY OF FRONT DWELLING TO AN UDU UNIT, REMOVE INTERIOR STAIR AND INFILL STAIR OPENING (46 SQFT ADDITION), NEW KITCHEN.
Permit Issued
Issued on 4/6/2022
Issuing Office
Current Status
CofO Issued on 1/27/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/23/2020 APPLICANT
Assigned to Plan Check Engineer 12/30/2020 SAM CHANG
Corrections Issued 1/14/2021 SAM CHANG
Quality Review Completed 1/27/2021 TIEN JEN WANG
Applicant returned to address corrections 4/6/2021 SAM CHANG
Applicant returned to address corrections 2/24/2022 SAM CHANG
Applicant returned to address corrections 2/28/2022 SAM CHANG
Plan Check Approved 3/30/2022 SAM CHANG
Issued 4/6/2022 APPLICANT
Building Plans Picked Up 4/11/2022 APPLICANT
CofO in Progress 12/30/2022 ALIZAH MAYAGOITIA
CofO in Progress 12/30/2022 ALIZAH MAYAGOITIA
Permit Finaled 1/27/2023 DEROLD HAUFF
CofO Issued 1/27/2023 DEROLD HAUFF
Permit Finaled 1/27/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 2/10/2021 THOMAS LANG
Hydrant and Access approval Cleared 3/19/2021 KURT CORRAL
Green Code Cleared 4/6/2021 SAM CHANG
Eng Process Fee Ord 176,300 Cleared 6/2/2021 ROSA SILVA
DCP conditions approval Cleared 1/11/2022 KENNETH LE
Miscellaneous Cleared 2/10/2022 MAIDEL LUEVANO
Sewer availability Cleared 2/24/2022 PAMELA TENEZA
Tenant Habitability Plan Cleared 3/3/2022 PHILLIP MUNGUIA
DCP conditions approval Cleared 3/18/2022 KENNETH LE

Contact Information

Contractor Valley Green Inc; Lic. No.: 844306-A 2648 FAIR OAKS AVENUE      ALTADENA, CA 91001
Engineer Ramirez, Cid, Jose Carlos; Lic. No.: C91046 5164 N RATON CIR      LONG BEACH, CA 90807

Inspector Information

ALEJANDRO DE ARTOLA, (213) 202-3128 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 4/21/2022 Corrections Issued JOAQUIN GREENOUGH
ELECTRICAL-Rough 4/21/2022 Corrections Issued JOAQUIN GREENOUGH
Green Building Rough 4/21/2022 Approved JOAQUIN GREENOUGH
HVAC-Rough 4/21/2022 Corrections Issued JOAQUIN GREENOUGH
PLUMBING-Rough 4/21/2022 Corrections Issued JOAQUIN GREENOUGH
ELECTRICAL-Rough 7/7/2022 Approved JOAQUIN GREENOUGH
Gas Test 7/7/2022 Corrections Issued JOAQUIN GREENOUGH
HVAC-Rough 7/7/2022 Not Ready for Inspection JOAQUIN GREENOUGH
Interior/Exterior Lathing 7/7/2022 Not Ready for Inspection JOAQUIN GREENOUGH
PLUMBING-Rough 7/7/2022 Not Ready for Inspection JOAQUIN GREENOUGH
Pre-Inspection 7/7/2022 Corrections Issued JOAQUIN GREENOUGH
Excavation/Setback/Form/Re-Bar 7/20/2022 Approved STUART CHAPMAN
Gas Test 7/20/2022 Partial Approval STUART CHAPMAN
Interior/Exterior Lathing 7/20/2022 Not Ready for Inspection STUART CHAPMAN
PLUMBING-Rough 7/20/2022 Approved STUART CHAPMAN
Insulation 7/29/2022 Corrections Issued JOAQUIN GREENOUGH
Interior/Exterior Lathing 7/29/2022 Not Ready for Inspection JOAQUIN GREENOUGH
BUILDING-Rough-Frame 8/12/2022 Approved FREDDIE RIVERA
Insulation 8/12/2022 Approved FREDDIE RIVERA
Interior/Exterior Lathing 8/12/2022 Partial Approval FREDDIE RIVERA
Wood Frame 8/12/2022 Approved FREDDIE RIVERA
Drywall Nailing 8/19/2022 Approved JOAQUIN GREENOUGH
Floor/Roof Diaphrgm/Shear Wall 8/19/2022 Approved JOAQUIN GREENOUGH
Interior/Exterior Lathing 9/12/2022 Approved MICHAEL LEWIS
Shower Pan 9/12/2022 Approved MICHAEL LEWIS
ELECTRICAL-Final 10/8/2022 Not Ready for Inspection RICHARD ROBLES
Final 10/8/2022 Not Ready for Inspection RICHARD ROBLES
Footing/Foundation/Slab 10/8/2022 Approved RICHARD ROBLES
Green Building Final 10/8/2022 Not Ready for Inspection RICHARD ROBLES
HVAC-Final 10/8/2022 Not Ready for Inspection RICHARD ROBLES
PLUMBING-Final 10/8/2022 Not Ready for Inspection RICHARD ROBLES
SGSOV-Seismic Gas S/O Valve 10/8/2022 SGSOV Not Ready RICHARD ROBLES
Smoke Detectors 10/8/2022 Approved RICHARD ROBLES
Final 10/26/2022 Corrections Issued ALIZAH MAYAGOITIA
Green Building Final 10/26/2022 Approved ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 10/26/2022 SGSOV Approved ALIZAH MAYAGOITIA
ELECTRICAL-Final 11/1/2022 Approved ALIZAH MAYAGOITIA
Final 11/1/2022 Conditional Approval ALIZAH MAYAGOITIA
HVAC-Final 11/1/2022 Approved ALIZAH MAYAGOITIA
PLUMBING-Final 11/1/2022 Approved ALIZAH MAYAGOITIA
Pre-Inspection 11/1/2022 Approved ALIZAH MAYAGOITIA
Final 11/4/2022 Conditional Approval ALIZAH MAYAGOITIA
Final 11/15/2022 Corrections Issued ALIZAH MAYAGOITIA
Final 12/30/2022 OK to Issue CofO ALIZAH MAYAGOITIA