530 S OLIVE ST 90013

Certificate Information: 530 S OLIVE ST 90013

Application / Permit
20016-10000-31937
Plan Check / Job No.
B20LA22911
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(4) Park or Playground operated by governmental agency
Work Description
**PHASE-1A** PERSHING SQUARE PARK REMODEL PHASE 1A: TO PROVIDE ADDITIONAL VERTICAL TRANSPORTATION ALONG OLIVE ST. FROM GRADE LEVEL TO THE 3 GARAGE LEVELS BELOW. ADDING 2 NEW ELEVATORS AND STAIRWAY ALONG OLIVE ST.;. REMOVING THE ESCALATOR/STRUCTURE AND REPLACING IT WITH A NEW LANDSCAPE AREA/PLAZA. see comments.
Permit Issued
Issued on 6/13/2023
Issuing Office
Metro
Current Status
Permit Finaled on 9/23/2025

Permit Application Status History

Submitted 4/15/2021 APPLICANT
Assigned to Plan Check Engineer 5/20/2021 KESETE HAREGOT
Disabled Access Plans Picked Up 5/25/2021 APPLICANT
Green Plans Picked Up 5/25/2021 APPLICANT
Corrections Issued 6/16/2021 KESETE HAREGOT
Quality Review Completed 6/21/2021 FARUK SEZER
Applicant returned to address corrections 9/3/2021 KESETE HAREGOT
Plan Check Approved 2/4/2022 KESETE HAREGOT
Issued 6/13/2023 APPLICANT
Permit Finaled 9/23/2025 PAUL BAZERKANIAN

Permit Application Clearance Information

Address approval Cleared 8/10/2021 WALLIE JONG
Permit Cleared 8/10/2021 WALLIE JONG
Prkng lot landscape/Water mgmt Cleared 8/11/2021 ANACANY HURTADO
City owned building/parcel Cleared 8/12/2021 KESETE HAREGOT
City Hist. Cultural Monument Cleared 8/31/2021 LAMBERT GIESSINGER
Historic monument Cleared 8/31/2021 LAMBERT GIESSINGER
DAS Clearance Cleared 9/8/2021 SHINE LIN
Green Code Cleared 9/9/2021 AARON COSTA
Miscellaneous Cleared 9/21/2021 JEREMY CHOK
Eng Process Fee Ord 176,300 Cleared 9/22/2021 WALLIE JONG
Metro Rail approval Cleared 9/22/2021 KESETE HAREGOT
Disturb/Remove Protected Trees Cleared 9/29/2021 ADRIAN SANCHEZ
Low Impact Development Cleared 9/29/2021 AMMAR ELTAWIL
Fire Marshal Fire Life Safety Cleared 11/4/2021 ANDREW KO

Contact Information

Architect Gerod,, Debra A; Lic. No.: C23665 GRUEN ASSOCIATES   6330 SAN VICENTE BLVD. STE. 200    LOS ANGELES, CA 90048
Contractor Ford E C Inc; Lic. No.: 396212-B 10850 WILSHIRE BLVD 380      LOS ANGELES, CA 90024
Engineer Forcier,, Easton Rene; Lic. No.: GE2948 233 TULANE ROAD      COSTA MESA, CA 92626
Engineer Hershberg,, Mark Aaron; Lic. No.: S5078 700 S FLOWER ST STE 2100      LOS ANGELES, CA 90017
Engineer Jones,, Christopher Michael; Lic. No.: L8193 17457 LAHEY ST      GRANADA HILLS, CA 91344

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/23/2023 Approved KATY RAMIREZ
Deputy Drilled-In Anchors 10/5/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/11/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/12/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/13/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/16/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/17/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/18/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/19/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/20/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 10/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 10/25/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 10/27/2023 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 10/27/2023 Not Ready for Inspection RAMAZANALI ALMASI
Deputy Reinf. Concrete 10/30/2023 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 10/30/2023 Not Ready for Inspection KATY RAMIREZ
Special/Order Compliance 10/30/2023 Partial Approval RICARDO ROBLES
Deputy Reinf. Concrete 10/31/2023 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 10/31/2023 Partial Inspection KATY RAMIREZ
Deputy Reinf. Concrete 11/1/2023 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/2/2023 Conditional Approval RAMAZANALI ALMASI
Reinforced Concrete Frame 11/2/2023 Partial Approval RICARDO ROBLES
Deputy Reinf. Concrete 11/3/2023 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/8/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 11/9/2023 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 11/13/2023 Not Ready for Inspection JEROME BLACKWOOD
Reinforced Concrete Frame 11/14/2023 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/20/2023 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 11/20/2023 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 12/1/2023 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 12/5/2023 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 12/5/2023 Not Ready for Inspection KATY RAMIREZ
Deputy Reinf. Concrete 12/6/2023 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 12/7/2023 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 12/7/2023 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 12/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/19/2023 No Access for Inspection MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/20/2023 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 12/21/2023 Partial Approval KATY RAMIREZ
Drywall Nailing 1/2/2024 Not Ready for Inspection KATY RAMIREZ
Light Gage Steel Frame 1/2/2024 Not Ready for Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 1/17/2024 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 1/31/2024 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 2/20/2024 Partial Approval JACOB MYERS
Excavation/Setback/Form/Re-Bar 2/27/2024 Partial Approval LUIS CCAMACHO
Reinforced Concrete Frame 2/29/2024 Partial Approval LUIS CCAMACHO
Deputy Drilled-In Anchors 3/20/2024 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 3/26/2024 Partial Approval LUIS CCAMACHO
Footing/Foundation/Slab 3/26/2024 Partial Approval LUIS CCAMACHO
Reinforced Concrete Frame 4/17/2024 Partial Approval LUIS CCAMACHO
Reinforced Concrete Frame 4/25/2024 Partial Approval LUIS CCAMACHO
Insulation 5/9/2024 Partial Approval LUIS CCAMACHO
Drywall Nailing 5/15/2024 Partial Approval LUIS CCAMACHO
Deputy Reinf. Concrete 5/28/2024 Partial Approval LUIS CCAMACHO
Reinforced Concrete Frame 5/28/2024 Partial Approval LUIS CCAMACHO
Reinforced Concrete Frame 6/14/2024 Partial Approval LUIS CCAMACHO
Reinforced Concrete Frame 6/21/2024 Partial Approval LUIS CCAMACHO
Deputy Reinf. Concrete 7/9/2024 Partial Approval JEROME BLACKWOOD
Deputy Steel/Welding 7/9/2024 Partial Approval JEROME BLACKWOOD
Deputy Steel/Welding 7/15/2024 Partial Approval JEROME BLACKWOOD
Deputy Drilled-In Anchors 8/8/2024 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 8/26/2024 Partial Approval LUIS CCAMACHO
Reinforced Concrete Frame 8/28/2024 Partial Approval LUIS CCAMACHO
Light Gage Steel Frame 9/3/2024 Partial Approval JEROME BLACKWOOD
Final 6/24/2025 Partial Approval PAUL BAZERKANIAN
Green Building Final 6/24/2025 Approved PAUL BAZERKANIAN
SGSOV-Seismic Gas S/O Valve 6/24/2025 SGSOV Approved PAUL BAZERKANIAN
Smoke Detectors 6/24/2025 Approved PAUL BAZERKANIAN
Final 7/9/2025 Not Ready for Inspection PAUL BAZERKANIAN
Final 9/23/2025 Permit Finaled PAUL BAZERKANIAN