3705-3707 S ARLINGTON AVE 90018

Certificate Information: 3705-3707 S ARLINGTON AVE 90018

Application / Permit
20016-10000-31899
Plan Check / Job No.
B20LA22888
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
On 3705 we are doing an overlay (re-roof). On 3707 to tear-off comp. roof and 30-yr comp. roof for both units. Replacing less than 10% of roof framing. All re-roof work shall comply with Cool Roof requirements and to match existing roof.
Permit Issued
Issued on 1/22/2021
Issuing Office
Current Status
Permit Finaled on 3/9/2021

Permit Application Status History

Submitted 12/17/2020 APPLICANT
Assigned to Plan Check Engineer 12/23/2020 SAMUEL GONZALEZ
Corrections Issued 12/29/2020 SAMUEL GONZALEZ
Plan Check Approved 1/22/2021 SAMUEL GONZALEZ
Issued 1/22/2021 APPLICANT
Permit Finaled 3/8/2021 THOMAS LOGRASSO

Permit Application Clearance Information

HPOZ Cleared 1/6/2021 MAX LODER

Contact Information

Contractor Barragan Roofing; Lic. No.: 1027337-C39 5 NEWELL CT APT 5107      EAST PALO ALTO, CA 94303

Inspector Information

JUSTIN HAWLEY, (213) 202-3432 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 1/25/2021 Approved THOMAS LOGRASSO
Floor/Roof Diaphrgm/Shear Wall 1/27/2021 Approved SABAS ALONSO
Final 2/4/2021 Corrections Issued SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 2/4/2021 SGSOV Approved SABAS ALONSO
Smoke Detectors 2/4/2021 Approved SABAS ALONSO
Final 2/11/2021 Partial Approval THOMAS LOGRASSO
Final 3/8/2021 Permit Finaled THOMAS LOGRASSO