1050 1/4 W 57TH ST 90037

Certificate Information: 1050 1/4 W 57TH ST 90037

Application / Permit
20016-10000-31428
Plan Check / Job No.
B20LA22538
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT EXISTING RECREATION ROOM OF AN EXISTING RECREATION ROOM OVER GARAGE BUILDING INTO AN ACCESSORY DWELLING UNIT. WORK IS ON SECOND FLOOR ONLY
Permit Issued
Issued on 6/28/2022
Issuing Office
Current Status
CofO Issued on 12/8/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/28/2021 APPLICANT
Assigned to Plan Check Engineer 2/10/2021 MANUEL MONTUFAR
Corrections Issued 2/26/2021 MANUEL MONTUFAR
Quality Review Completed 3/2/2021 EUGENE BARBEAU
Building Plans Picked Up 3/8/2021 APPLICANT
Applicant returned to address corrections 4/5/2021 MANUEL MONTUFAR
Applicant returned to address corrections 3/3/2022 MANUEL MONTUFAR
Applicant returned to address corrections 6/14/2022 MANUEL MONTUFAR
Plan Check Approved 6/28/2022 MANUEL MONTUFAR
Issued 6/28/2022 APPLICANT
CofO in Progress 12/5/2022 HORACE FULTZ
Permit Finaled 12/8/2022 DEROLD HAUFF
CofO Issued 12/8/2022 DEROLD HAUFF
Permit Finaled 12/8/2022 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 4/19/2021 WALLIE JONG
Sewer availability Cleared 4/19/2021 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 4/20/2021 WALLIE JONG

Contact Information

Architect Victor, Fressie; Lic. No.: C36724 1111 S. GRAND AVENUE   SUITE 712    LOS ANGELES, CA 90015
Contractor Tennex Construction; Lic. No.: 1070554-B 1237 ARMACOST AVE #2      LOS ANGELES, CA 90025

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 10/11/2022 Approved RYAN SALAZAR
HVAC-Rough 10/11/2022 Approved RYAN SALAZAR
PLUMBING-Rough 10/11/2022 Approved RYAN SALAZAR
BUILDING-Rough-Frame 10/19/2022 Approved SABAS ALONSO
Green Building Rough 10/19/2022 Approved SABAS ALONSO
Insulation 10/19/2022 Approved SABAS ALONSO
Drywall Nailing 10/27/2022 Approved SABAS ALONSO
Final 11/21/2022 Corrections Issued SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 11/21/2022 SGSOV Not Ready SABAS ALONSO
Smoke Detectors 11/21/2022 Approved SABAS ALONSO
Final 11/23/2022 OK to Issue CofO HORACE FULTZ
Final 11/23/2022 Off-Hour Fees Due
SGSOV-Seismic Gas S/O Valve 11/23/2022 Off-Hour Fees Due
SGSOV-Seismic Gas S/O Valve 11/23/2022 SGSOV Approved HORACE FULTZ