Pre-Inspection
|
10/25/2021
|
Partial Inspection
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
12/1/2021
|
Partial Approval
|
BRUCE CAMPBELL
|
|
Footing/Foundation/Slab
|
12/22/2021
|
Approved
|
BRUCE CAMPBELL
|
|
Deputy Reinf. Masonry
|
1/6/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
1/7/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
1/10/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
1/11/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
1/12/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Masonry Wall/Backfill
|
1/12/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
1/13/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
1/14/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Footing/Foundation/Slab
|
1/18/2022
|
Partial Approval
|
BRUCE CAMPBELL
|
|
Deputy Reinf. Masonry
|
1/19/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
1/19/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Green Building Rough
|
1/19/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
METHANE-Rough
|
1/19/2022
|
Order to Comply Issued
|
DARRYL ARNOLD
|
|
Reinforced Concrete Frame
|
1/19/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Deputy Reinf. Masonry
|
1/20/2022
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Deputy Shotcrete
|
1/20/2022
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Deputy Reinf. Masonry
|
1/24/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Deputy Reinf. Masonry
|
1/25/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
1/26/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
1/27/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
1/28/2022
|
Approved
|
MARK FERRARI
|
|
Masonry Wall/Backfill
|
1/28/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
2/1/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/1/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
2/1/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
2/2/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/2/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
2/2/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
2/3/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/3/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
2/3/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
2/4/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/4/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
2/4/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Green Building Rough
|
2/4/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
METHANE-Rough
|
2/4/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Masonry Wall/Backfill
|
2/4/2022
|
Partial Approval
|
MARK FERRARI
|
|
Reinforced Concrete Frame
|
2/4/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/7/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
2/7/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/8/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
2/8/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/9/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
2/9/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Footing/Foundation/Slab
|
2/11/2022
|
Partial Approval
|
MARK FERRARI
|
|
Masonry Wall/Backfill
|
2/11/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
2/15/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/15/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
2/16/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/16/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
2/17/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/17/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
2/18/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
2/18/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Green Building Rough
|
2/18/2022
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
METHANE-Rough
|
2/18/2022
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Reinforced Masonry Frame
|
2/18/2022
|
Partial Approval
|
JONATHAN QUACH
|
|
Reinforced Concrete Frame
|
2/22/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
2/23/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/23/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
2/24/2022
|
Approved
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/24/2022
|
Approved
|
MARK FERRARI
|
|
Footing/Foundation/Slab
|
2/24/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
2/25/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/25/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
2/28/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
2/28/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
3/1/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
3/1/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Green Building Rough
|
3/1/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
METHANE-Rough
|
3/1/2022
|
Approved
|
MARK FERRARI
|
|
Reinforced Masonry Frame
|
3/1/2022
|
Partial Approval
|
MARK FERRARI
|
|
Reinforced Concrete Frame
|
3/2/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
3/3/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Green Building Rough
|
3/4/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Reinforced Masonry Frame
|
3/4/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
3/9/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
3/10/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Green Building Rough
|
3/10/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Reinforced Masonry Frame
|
3/10/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
3/11/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Deputy Shotcrete
|
3/11/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Deputy Steel/Welding
|
3/11/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Deputy Shotcrete
|
3/14/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
3/15/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Footing/Foundation/Slab
|
3/15/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
3/16/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
3/17/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
3/18/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
3/24/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
3/24/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Reinforced Masonry Frame
|
3/24/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
3/25/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
3/30/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
3/31/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
4/1/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/4/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Green Building Rough
|
4/6/2022
|
Approved
|
MARK FERRARI
|
|
Reinforced Concrete Frame
|
4/6/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Steel/Welding
|
4/7/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
4/8/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
4/8/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
4/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
4/13/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
4/13/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
4/13/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
4/14/2022
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Deputy Reinf. Concrete
|
4/14/2022
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Deputy Shotcrete
|
4/14/2022
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Deputy Drilled-In Anchors
|
4/15/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
4/15/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
4/15/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
4/20/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
4/20/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
4/21/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
4/21/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
4/22/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
4/22/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
4/25/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
4/25/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
4/26/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
4/26/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Reinforced Concrete Frame
|
4/26/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
4/27/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
4/27/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
4/28/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
4/28/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
4/29/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
4/29/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/9/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/10/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Drywall Nailing
|
5/10/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/11/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/12/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/13/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/17/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/18/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/19/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Footing/Foundation/Slab
|
5/19/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/20/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Footing/Foundation/Slab
|
5/20/2022
|
Order to Comply Issued
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/23/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
5/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/25/2022
|
Conditional Approval
|
TERRY HERR
|
|
Deputy Shotcrete
|
5/25/2022
|
Conditional Approval
|
TERRY HERR
|
|
Deputy Shotcrete
|
5/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
5/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
5/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
5/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Reinforced Concrete Frame
|
5/31/2022
|
Partial Approval
|
MARK FERRARI
|
|
Light Gage Steel Frame
|
6/2/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
6/7/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Shotcrete
|
6/7/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Reinforced Concrete Frame
|
6/7/2022
|
Approved
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
6/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
6/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
6/10/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/14/2022
|
Approved
|
MARK FERRARI
|
|
Light Gage Steel Frame
|
6/23/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Deputy Steel/Welding
|
6/27/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
6/28/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
6/28/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/30/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Masonry
|
6/30/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Reinforced Masonry Frame
|
6/30/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
7/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
7/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
7/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Drywall Nailing
|
7/18/2022
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Light Gage Steel Frame
|
7/18/2022
|
Partial Approval
|
BRUCE CAMPBELL
|
|
Drywall Nailing
|
7/21/2022
|
Partial Approval
|
MARK FERRARI
|
|
Light Gage Steel Frame
|
7/21/2022
|
Partial Approval
|
MARK FERRARI
|
|
Drywall Nailing
|
7/27/2022
|
Partial Approval
|
MARK FERRARI
|
|
Drywall Nailing
|
8/5/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Drywall Nailing
|
8/11/2022
|
Approved
|
MARK FERRARI
|
|
Interior/Exterior Lathing
|
8/11/2022
|
Approved
|
MARK FERRARI
|
|
Final
|
9/13/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Green Building Final
|
9/13/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Reinforced Masonry Frame
|
9/13/2022
|
Approved
|
MARK FERRARI
|
|
SGSOV-Seismic Gas S/O Valve
|
9/13/2022
|
SGSOV Not Ready
|
MARK FERRARI
|
|
Smoke Detectors
|
9/13/2022
|
Approved
|
MARK FERRARI
|
|
Final
|
4/5/2023
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Green Building Final
|
4/5/2023
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
SGSOV-Seismic Gas S/O Valve
|
4/5/2023
|
SGSOV No Gas
|
RAFAEL CORTES
|
|
Final
|
8/4/2023
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Green Building Final
|
8/4/2023
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Final
|
8/8/2023
|
Partial Approval
|
RAFAEL CORTES
|
|
Green Building Final
|
8/8/2023
|
Approved
|
RAFAEL CORTES
|