635 S MATEO ST 90021

Certificate Information: 635 S MATEO ST 90021

Application / Permit
20016-10000-31239
Plan Check / Job No.
B20LA22251
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
(NDC-1084), retrofit existing building per the NDC Ordinance. 1st Floor change of use from warhouse to office (2nd floor office to remain). . New occupiable roof above 1st floor. New exterior elevator and stair to 2nd floor. Enclose covered loading dock.
Permit Issued
Issued on 10/22/2021
Issuing Office
Current Status
CofO Issued on 8/14/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/5/2021 APPLICANT
Assigned to Plan Check Engineer 1/28/2021 LARRY LEE
Corrections Issued 2/4/2021 LARRY LEE
Quality Review Completed 2/8/2021 CHARLES CHANG
Building Plans Picked Up 2/16/2021 APPLICANT
Green Plans Picked Up 2/19/2021 APPLICANT
Disabled Access Plans Picked Up 3/2/2021 APPLICANT
Applicant returned to address corrections 8/30/2021 LARRY LEE
Applicant returned to address corrections 9/1/2021 LARRY LEE
Applicant returned to address corrections 9/8/2021 LARRY LEE
Applicant returned to address corrections 9/10/2021 LARRY LEE
Applicant returned to address corrections 9/14/2021 LARRY LEE
Applicant returned to address corrections 9/17/2021 LARRY LEE
Applicant returned to address corrections 9/21/2021 LARRY LEE
Applicant returned to address corrections 10/6/2021 LARRY LEE
Plan Check Approved 10/21/2021 LARRY LEE
Issued 10/22/2021 APPLICANT
CofO in Progress 8/14/2023 ERNESTO CORRAL
Permit Finaled 8/14/2023 ERNESTO CORRAL
CofO Issued 8/14/2023 ERNESTO CORRAL
Permit Finaled 8/14/2023 ERNESTO CORRAL

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 4/30/2021 JEANIE LAM
Highway dedication Cleared 4/30/2021 JEANIE LAM
Sewer availability Cleared 4/30/2021 JEANIE LAM
"D" conditions Cleared 5/17/2021 ANNA VIDAL
ZI Cleared 5/17/2021 ANNA VIDAL
Redevelopment Project Area Cleared 6/4/2021 DAVID URITA
Green Code Cleared 6/16/2021 LARRY LEE
Hydrant and Access approval Cleared 6/16/2021 JOHN CONNEALLY
Roof/Waste drainage to street Cleared 9/7/2021 JEANIE LAM
Fire Marshal Fire Life Safety Cleared 9/10/2021 VIDAL GARCIA
DAS Clearance Cleared 10/15/2021 LARRY LEE

Contact Information

Contractor Hopkins George C Construction Co Inc; Lic. No.: 397266-B 919 W GLENOAKS BLVD      GLENDALE, CA 91202

Inspector Information

SEAN POMISH, (213) 202-2643 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL CORTES, (213) 202-2643 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/25/2021 Partial Inspection DANIEL COLLINS
Footing/Foundation/Slab 12/1/2021 Partial Approval BRUCE CAMPBELL
Footing/Foundation/Slab 12/22/2021 Approved BRUCE CAMPBELL
Deputy Reinf. Masonry 1/6/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 1/7/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 1/10/2022 Partial Approval MARK FERRARI
Deputy Reinf. Masonry 1/11/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 1/12/2022 Conditional Approval MARK FERRARI
Masonry Wall/Backfill 1/12/2022 Partial Approval MARK FERRARI
Deputy Reinf. Masonry 1/13/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 1/14/2022 Conditional Approval MARK FERRARI
Footing/Foundation/Slab 1/18/2022 Partial Approval BRUCE CAMPBELL
Deputy Reinf. Masonry 1/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 1/19/2022 Conditional Approval ERNESTO CORRAL
Green Building Rough 1/19/2022 Conditional Approval DARRYL ARNOLD
METHANE-Rough 1/19/2022 Order to Comply Issued DARRYL ARNOLD
Reinforced Concrete Frame 1/19/2022 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Masonry 1/20/2022 Conditional Approval BRUCE CAMPBELL
Deputy Shotcrete 1/20/2022 Conditional Approval BRUCE CAMPBELL
Deputy Reinf. Masonry 1/24/2022 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Masonry 1/25/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 1/26/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 1/27/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 1/28/2022 Approved MARK FERRARI
Masonry Wall/Backfill 1/28/2022 Partial Approval MARK FERRARI
Deputy Drilled-In Anchors 2/1/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/1/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 2/1/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 2/2/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/2/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 2/2/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 2/3/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/3/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 2/3/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 2/4/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/4/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 2/4/2022 Conditional Approval MARK FERRARI
Green Building Rough 2/4/2022 Not Ready for Inspection MARK FERRARI
METHANE-Rough 2/4/2022 Not Ready for Inspection MARK FERRARI
Masonry Wall/Backfill 2/4/2022 Partial Approval MARK FERRARI
Reinforced Concrete Frame 2/4/2022 Partial Approval MARK FERRARI
Deputy Reinf. Masonry 2/7/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 2/7/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/8/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 2/8/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/9/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 2/9/2022 Conditional Approval MARK FERRARI
Footing/Foundation/Slab 2/11/2022 Partial Approval MARK FERRARI
Masonry Wall/Backfill 2/11/2022 Partial Approval MARK FERRARI
Deputy Drilled-In Anchors 2/15/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/15/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 2/16/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/16/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 2/17/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/17/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 2/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/18/2022 Conditional Approval ERNESTO CORRAL
Green Building Rough 2/18/2022 Not Ready for Inspection JONATHAN QUACH
METHANE-Rough 2/18/2022 Not Ready for Inspection JONATHAN QUACH
Reinforced Masonry Frame 2/18/2022 Partial Approval JONATHAN QUACH
Reinforced Concrete Frame 2/22/2022 Not Ready for Inspection MARK FERRARI
Deputy Reinf. Concrete 2/23/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/23/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Concrete 2/24/2022 Approved MARK FERRARI
Deputy Reinf. Masonry 2/24/2022 Approved MARK FERRARI
Footing/Foundation/Slab 2/24/2022 Partial Approval MARK FERRARI
Deputy Reinf. Concrete 2/25/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/25/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Concrete 2/28/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 2/28/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Concrete 3/1/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 3/1/2022 Conditional Approval MARK FERRARI
Green Building Rough 3/1/2022 Not Ready for Inspection MARK FERRARI
METHANE-Rough 3/1/2022 Approved MARK FERRARI
Reinforced Masonry Frame 3/1/2022 Partial Approval MARK FERRARI
Reinforced Concrete Frame 3/2/2022 Partial Approval MARK FERRARI
Deputy Shotcrete 3/3/2022 Conditional Approval MARK FERRARI
Green Building Rough 3/4/2022 Not Ready for Inspection MARK FERRARI
Reinforced Masonry Frame 3/4/2022 Partial Approval MARK FERRARI
Deputy Shotcrete 3/9/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 3/10/2022 Conditional Approval MARK FERRARI
Green Building Rough 3/10/2022 Not Ready for Inspection MARK FERRARI
Reinforced Masonry Frame 3/10/2022 Partial Approval MARK FERRARI
Deputy Reinf. Concrete 3/11/2022 Conditional Approval DARRYL ARNOLD
Deputy Shotcrete 3/11/2022 Conditional Approval DARRYL ARNOLD
Deputy Steel/Welding 3/11/2022 Conditional Approval DARRYL ARNOLD
Deputy Shotcrete 3/14/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 3/15/2022 Conditional Approval MARK FERRARI
Footing/Foundation/Slab 3/15/2022 Partial Approval MARK FERRARI
Deputy Shotcrete 3/16/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 3/17/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 3/18/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 3/24/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 3/24/2022 Conditional Approval MARK FERRARI
Reinforced Masonry Frame 3/24/2022 Partial Approval MARK FERRARI
Deputy Reinf. Concrete 3/25/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 3/30/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 3/31/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 4/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/4/2022 Conditional Approval MARK FERRARI
Green Building Rough 4/6/2022 Approved MARK FERRARI
Reinforced Concrete Frame 4/6/2022 Partial Approval MARK FERRARI
Deputy Steel/Welding 4/7/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Concrete 4/8/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 4/8/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 4/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/13/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Concrete 4/13/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 4/13/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 4/14/2022 Conditional Approval BRUCE CAMPBELL
Deputy Reinf. Concrete 4/14/2022 Conditional Approval BRUCE CAMPBELL
Deputy Shotcrete 4/14/2022 Conditional Approval BRUCE CAMPBELL
Deputy Drilled-In Anchors 4/15/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Concrete 4/15/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 4/15/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 4/20/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 4/20/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 4/21/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 4/21/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 4/22/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 4/22/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 4/25/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 4/25/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 4/26/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 4/26/2022 Conditional Approval MARK FERRARI
Reinforced Concrete Frame 4/26/2022 Partial Approval MARK FERRARI
Deputy Drilled-In Anchors 4/27/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 4/27/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 4/28/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 4/28/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 4/29/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 4/29/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 5/9/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 5/10/2022 Conditional Approval MARK FERRARI
Drywall Nailing 5/10/2022 Partial Approval MARK FERRARI
Deputy Shotcrete 5/11/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 5/12/2022 Partial Approval MARK FERRARI
Deputy Shotcrete 5/13/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 5/17/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 5/18/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 5/19/2022 Conditional Approval MARK FERRARI
Footing/Foundation/Slab 5/19/2022 Partial Approval MARK FERRARI
Deputy Shotcrete 5/20/2022 Conditional Approval MARK FERRARI
Footing/Foundation/Slab 5/20/2022 Order to Comply Issued MARK FERRARI
Deputy Shotcrete 5/23/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/25/2022 Conditional Approval TERRY HERR
Deputy Shotcrete 5/25/2022 Conditional Approval TERRY HERR
Deputy Shotcrete 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/27/2022 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 5/31/2022 Partial Approval MARK FERRARI
Light Gage Steel Frame 6/2/2022 Partial Approval MARK FERRARI
Deputy Reinf. Concrete 6/7/2022 Conditional Approval MARK FERRARI
Deputy Shotcrete 6/7/2022 Conditional Approval MARK FERRARI
Reinforced Concrete Frame 6/7/2022 Approved MARK FERRARI
Deputy Reinf. Concrete 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/10/2022 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 6/10/2022 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 6/14/2022 Approved MARK FERRARI
Light Gage Steel Frame 6/23/2022 Conditional Approval DARRYL ARNOLD
Deputy Steel/Welding 6/27/2022 Conditional Approval MARK FERRARI
Deputy Drilled-In Anchors 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/30/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Masonry 6/30/2022 Conditional Approval MARK FERRARI
Reinforced Masonry Frame 6/30/2022 Partial Approval MARK FERRARI
Deputy Drilled-In Anchors 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/6/2022 Conditional Approval ERNESTO CORRAL
Drywall Nailing 7/18/2022 Conditional Approval BRUCE CAMPBELL
Light Gage Steel Frame 7/18/2022 Partial Approval BRUCE CAMPBELL
Drywall Nailing 7/21/2022 Partial Approval MARK FERRARI
Light Gage Steel Frame 7/21/2022 Partial Approval MARK FERRARI
Drywall Nailing 7/27/2022 Partial Approval MARK FERRARI
Drywall Nailing 8/5/2022 Conditional Approval DARRYL ARNOLD
Drywall Nailing 8/11/2022 Approved MARK FERRARI
Interior/Exterior Lathing 8/11/2022 Approved MARK FERRARI
Final 9/13/2022 Not Ready for Inspection MARK FERRARI
Green Building Final 9/13/2022 Not Ready for Inspection MARK FERRARI
Reinforced Masonry Frame 9/13/2022 Approved MARK FERRARI
SGSOV-Seismic Gas S/O Valve 9/13/2022 SGSOV Not Ready MARK FERRARI
Smoke Detectors 9/13/2022 Approved MARK FERRARI
Final 4/5/2023 Not Ready for Inspection RAFAEL CORTES
Green Building Final 4/5/2023 Not Ready for Inspection RAFAEL CORTES
SGSOV-Seismic Gas S/O Valve 4/5/2023 SGSOV No Gas RAFAEL CORTES
Final 8/4/2023 Not Ready for Inspection RAFAEL CORTES
Green Building Final 8/4/2023 Not Ready for Inspection RAFAEL CORTES
Final 8/8/2023 Partial Approval RAFAEL CORTES
Green Building Final 8/8/2023 Approved RAFAEL CORTES