545 S FIGUEROA ST 90071

Certificate Information: 545 S FIGUEROA ST 90071

Application / Permit
20016-10000-31140
Plan Check / Job No.
B20LA22176
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
13TH FLOOR TENANT IMPROVEMENTS: 1. INTERIOR IMPROVEMENTS TO DINING ROOM. 2. EQUIPMENT UPGRADES TO EXISTING DISPLAY KITCHEN. 3. DEMO EXISTING WINDOWS 5. NEW DISH ROOM AT TANK & FAN ROOM (117 SQFT) NO NEW FLOOR ARE ADDED.
Permit Issued
Issued on 7/28/2023
Issuing Office
Metro
Current Status
Permit Finaled on 11/13/2025

Permit Application Status History

Submitted 12/2/2020 APPLICANT
Green Plans Picked Up 12/21/2020 APPLICANT
Assigned to Plan Check Engineer 12/30/2020 HERNAN ARREOLA
Corrections Issued 1/7/2021 HERNAN ARREOLA
Quality Review Completed 1/14/2021 ALLEN MANALANSAN
Building Plans Picked Up 2/2/2021 APPLICANT
Applicant returned to address corrections 9/2/2021 HERNAN ARREOLA
Applicant returned to address corrections 10/21/2022 HERNAN ARREOLA
Plan Check Approved 7/27/2023 HERNAN ARREOLA
Issued 7/28/2023 APPLICANT
Permit Finaled 11/13/2025 PAUL BAZERKANIAN

Permit Application Clearance Information

Green Code Cleared 10/13/2022 AARON COSTA
DAS Clearance Cleared 10/21/2022 ALLEN MANALANSAN
"D" conditions Cleared 10/25/2022 LOUIS ORTEGA
ZI Cleared 10/25/2022 LOUIS ORTEGA
Metro Rail approval Cleared 11/14/2022 ALLEN MANALANSAN
City Hist. Cultural Monument Cleared 11/29/2022 MELISSA JONES
Historic monument Cleared 11/29/2022 MELISSA JONES
Food Service Establishment Cleared 2/28/2023 PAWAN VERMA
Fire Marshal Fire Life Safety Cleared 7/26/2023 VIDAL GARCIA
Food establishment approval Cleared 7/27/2023 LACDHS APPROVED

Contact Information

Architect Melzer,, Mark Henry; Lic. No.: C17918 9511 IRVINE CENTER DRIVE      IRVINE, CA 92618
Contractor Phoenix Construction And Management Inc; Lic. No.: 815136-B 515 S FLOWER STREET, STE 1270      LOS ANGELES, CA 90071
Engineer Youssef,, Nabih Fouad; Lic. No.: S2026 550 S HOPE ST STE 1700      LOS ANGELES, CA 90071

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Drywall Nailing 8/2/2023 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 8/2/2023 Partial Inspection KATY RAMIREZ
Insulation 8/8/2023 Approved KATY RAMIREZ
Deputy Steel/Welding 8/9/2023 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 8/11/2023 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 8/18/2023 Conditional Approval KATY RAMIREZ
Drywall Nailing 8/18/2023 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 8/30/2023 Partial Approval KATY RAMIREZ
Deputy Steel/Welding 8/31/2023 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 8/31/2023 Corrections Issued KATY RAMIREZ
Drywall Nailing 9/9/2023 Not Ready for Inspection ALFREDO LOPEZ
Drywall Nailing 9/9/2023 Off-Hour Fees Due
Light Gage Steel Frame 9/9/2023 Not Ready for Inspection ALFREDO LOPEZ
Light Gage Steel Frame 9/9/2023 Off-Hour Fees Due
Drywall Nailing 9/12/2023 Partial Approval KATY RAMIREZ
Drywall Nailing 9/15/2023 Partial Approval ALFREDO LOPEZ
T-Bar Ceiling 9/20/2023 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 10/6/2023 Partial Approval KATY RAMIREZ
T-Bar Ceiling 10/6/2023 Partial Approval KATY RAMIREZ
Interior/Exterior Lathing 10/20/2023 Approved KATY RAMIREZ
Structural Steel Frame 1/12/2024 No Access for Inspection KATY RAMIREZ
Structural Steel Frame 1/16/2024 Not Ready for Inspection JEROME BLACKWOOD
Structural Steel Frame 1/17/2024 Partial Approval JEROME BLACKWOOD
Deputy Steel/Welding 3/8/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/12/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/13/2024 Conditional Approval MICHAEL ROSENBERG
T-Bar Ceiling 3/19/2024 Partial Approval LUIS CCAMACHO
Pre-Inspection 4/23/2024 Not Ready for Inspection LUIS CCAMACHO
Structural Steel Frame 4/23/2024 Not Ready for Inspection LUIS CCAMACHO
Structural Steel Frame 5/1/2024 Partial Approval LUIS CCAMACHO
Final 5/16/2024 Not Ready for Inspection LUIS CCAMACHO
Green Building Final 5/16/2024 Not Ready for Inspection LUIS CCAMACHO
SGSOV-Seismic Gas S/O Valve 5/16/2024 SGSOV Not Ready LUIS CCAMACHO
Smoke Detectors 5/16/2024 Not Ready for Inspection LUIS CCAMACHO
Structural Steel Frame 5/16/2024 Not Ready for Inspection LUIS CCAMACHO
Light Gage Steel Frame 8/30/2024 Partial Approval LUIS CCAMACHO
Final 11/13/2025 Permit Finaled PAUL BAZERKANIAN
Green Building Final 11/13/2025 Approved PAUL BAZERKANIAN
SGSOV-Seismic Gas S/O Valve 11/13/2025 SGSOV Approved PAUL BAZERKANIAN
Smoke Detectors 11/13/2025 Approved PAUL BAZERKANIAN