947 S BRONSON AVE 90019

Certificate Information: 947 S BRONSON AVE 90019

Application / Permit
20016-10000-28907
Plan Check / Job No.
B20LA20827
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL ENTIRE AT EXISTING S.F.D. (NO EXTERIOR WORK) RELOCATED (E) KITCHEN TO EXPAND SPACE AND (E) DEN TO CONVERT INTO NEW 1 BEDROOM, ADD NEW 2 BATHS. PROPOSED TOTAL 4 BED ROOM AND 4 BATH ROOM.
Permit Issued
Issued on 12/30/2020
Issuing Office
Metro
Current Status
Permit Finaled on 7/16/2021

Permit Application Status History

Submitted 11/9/2020 APPLICANT
Assigned to Plan Check Engineer 11/19/2020 GEORGE ALVAREZ
Corrections Issued 11/23/2020 GEORGE ALVAREZ
Plan Check Approved 12/15/2020 GEORGE ALVAREZ
Building Plans Picked Up 12/17/2020 APPLICANT
Issued 12/30/2020 APPLICANT
Permit Finaled 7/15/2021 CHRIS CHRISTENSEN

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 12/1/2020 RENZ SORIANO
Sewer availability Cleared 12/1/2020 RENZ SORIANO
HPOZ Cleared 12/2/2020 AMANDA KAINER

Contact Information

Architect Baek,, Sunpil; Lic. No.: C35323 3923 W 6TH ST SUITE 410      LOS ANGELES, CA 90020
Contractor Namu Construction; Lic. No.: 997839-B 2333 BEVERLY BLVD #202-A      LOS ANGELES, CA 90057
Engineer Hwang,, Junho; Lic. No.: S5592 815 FAIRVIEW AVE #205      SOUTH PASADENA, CA 91030

Inspector Information

JEFFREY MEAD, (213) 202-3240 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/5/2021 Approved CHRIS CHRISTENSEN
Footing/Foundation/Slab 1/19/2021 Approved JOSEPH MCGARRY
Rough-Elec/Plmb/HVAC 2/8/2021 Corrections Issued CHRIS CHRISTENSEN
PLUMBING-Rough 2/18/2021 Approved CHRIS CHRISTENSEN
BUILDING-Rough-Frame 2/23/2021 Approved CHRIS CHRISTENSEN
Insulation 3/3/2021 Approved JOSEPH MCGARRY
Interior/Exterior Lathing 3/3/2021 Conditional Approval JOSEPH MCGARRY
Shower Pan 3/9/2021 Approved STUART CHAPMAN
Drywall Nailing 4/29/2021 Approved CHRIS CHRISTENSEN
PLUMBING-Final 6/9/2021 Approved CHRIS CHRISTENSEN
Service/Power Release 6/9/2021 Not Required CHRIS CHRISTENSEN
Final 7/15/2021 Permit Finaled CHRIS CHRISTENSEN
SGSOV-Seismic Gas S/O Valve 7/15/2021 SGSOV Approved CHRIS CHRISTENSEN