3667 S VETERAN AVE 90034

Certificate Information: 3667 S VETERAN AVE 90034

Application / Permit
20016-10000-26864
Plan Check / Job No.
B20LA19466
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Soft-Story seismic retrofit per LABC Chapter 93: Install New Special Steel Cantilever Columns
Permit Issued
Issued on 8/10/2022
Issuing Office
Metro
Current Status
CofC Issued on 12/27/2023

Permit Application Status History

Submitted 11/9/2020 APPLICANT
Assigned to Plan Check Engineer 11/18/2020 HANS SANTIAGO
Corrections Issued 11/23/2020 HANS SANTIAGO
Quality Review Completed 11/24/2020 DAVID CHANG
Plan Check Approved 12/14/2020 ANDREW SANTIAGO
Issued 8/10/2022 APPLICANT
OK for CofC 12/18/2023 GRANT WOODS
CofC Issued 12/27/2023 DAVID TSAU

Permit Application Clearance Information

Tenant Habitability Plan Cleared 8/9/2022 RICARDO BOHORQUEZ

Contact Information

Contractor Muller Ariel; Lic. No.: 1026822-B 525 N FULLER AVE      LOS ANGELES, CA 90036
Engineer Puliyadi,, Senthilnath Surendran; Lic. No.: NA71630       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/6/2022 Not Ready for Inspection GRANT WOODS
Deputy Reinf. Concrete 12/6/2022 Conditional Approval GRANT WOODS
Excavation/Setback/Form/Re-Bar 12/15/2022 Not Ready for Inspection SHAVONNE ESPINOZA
Wood Frame 12/15/2022 Not Ready for Inspection SHAVONNE ESPINOZA
Excavation/Setback/Form/Re-Bar 12/19/2022 Conditional Approval SHAVONNE ESPINOZA
Wood Frame 12/19/2022 Partial Inspection SHAVONNE ESPINOZA
Insulation 12/29/2022 Approved AMANUEL BERHE
Floor/Roof Diaphrgm/Shear Wall 1/3/2023 Not Ready for Inspection GRANT WOODS
Deputy Wood Construction 1/4/2023 Conditional Approval MICHAEL PETRUSKO
Floor/Roof Diaphrgm/Shear Wall 1/11/2023 Not Ready for Inspection GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 1/12/2023 Partial Inspection SHAVONNE ESPINOZA
Interior/Exterior Lathing 1/17/2023 Approved GRANT WOODS
Final 1/26/2023 Partial Inspection SHAVONNE ESPINOZA
SGSOV-Seismic Gas S/O Valve 1/26/2023 SGSOV Not Ready SHAVONNE ESPINOZA
Smoke Detectors 1/26/2023 Partial Inspection SHAVONNE ESPINOZA
SGSOV-Seismic Gas S/O Valve 2/1/2023 SGSOV Not Ready SHAVONNE ESPINOZA
Final 3/31/2023 No Access for Inspection PAUL DAVIDSON
SGSOV-Seismic Gas S/O Valve 3/31/2023 SGSOV Not Ready PAUL DAVIDSON
Smoke Detectors 3/31/2023 No Access for Inspection PAUL DAVIDSON
Final 4/4/2023 Conditional Approval GRANT WOODS
SGSOV-Seismic Gas S/O Valve 4/4/2023 SGSOV Approved GRANT WOODS
Smoke Detectors 4/4/2023 Approved GRANT WOODS
Final 12/18/2023 OK for CofC GRANT WOODS