3739 S BARRY AVE 90066

Certificate Information: 3739 S BARRY AVE 90066

Application / Permit
20016-10000-24945
Plan Check / Job No.
B20LA18234
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REPLACE EXISTING TWO SETS OF PAIR-DOORS WITH ONE LARGER POCKET DOOR AND ALSO WITH ONE WINDOW, ALONG THE REAR WALL ONLY ON THE GROUND FLOOR. NEW 18' X 8' 10" GROUND FLOOR ADDITION AND 23' 2" X5' 2" AT 2ND FLOOR BALCONY ADDITION.
Permit Issued
Issued on 1/7/2021
Issuing Office
Current Status
Permit Finaled on 10/2/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/6/2020 APPLICANT
Assigned to Plan Check Engineer 10/9/2020 FERNANDO FLORES
Corrections Issued 10/13/2020 FERNANDO FLORES
Applicant returned to address corrections 12/11/2020 GEORGE ALVAREZ
Applicant returned to address corrections 1/6/2021 RAHEL BEYENE
Plan Check Approved 1/6/2021 RAHEL BEYENE
Issued 1/7/2021 APPLICANT
Building Plans Picked Up 1/11/2021 APPLICANT
Permit Finaled 9/29/2023 BEN MOLSTAD

Permit Application Clearance Information

Grading Pre-Inspection Cleared 11/20/2020 PATRICK MISCHLICH

Contact Information

Contractor Saldivar Construction Inc; Lic. No.: 1009987-B 937 EAST 24TH STREET      LOS ANGELES, CA 90011
Engineer Chiu,, Frankie Wai-King; Lic. No.: C43852 2106 TONDOLEA LN      LA CANADA, CA 91011

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 1/13/2021 Partial Approval EVAN COOPER
Deputy Reinf. Concrete 2/2/2021 Conditional Approval EVAN COOPER
Footing/Foundation/Slab 2/4/2021 Approved RICHARD ROBLES
Deputy Reinf. Concrete 2/8/2021 Conditional Approval EVAN COOPER
Structural Steel Frame 3/1/2021 Approved RICHARD ROBLES
Wood Frame 3/18/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Rough 3/25/2021 Approved OGANES TARAKHCHYAN
Wood Frame 3/25/2021 Partial Approval OGANES TARAKHCHYAN
Interior/Exterior Lathing 4/12/2021 Partial Approval OGANES TARAKHCHYAN
Deck 4/23/2021 Approved EVAN COOPER
Drywall Nailing 4/23/2021 Partial Approval EVAN COOPER
ELECTRICAL-Final 10/7/2021 Approved STEPHANIE SWANSON
Final 10/7/2021 Corrections Issued STEPHANIE SWANSON
SGSOV-Seismic Gas S/O Valve 10/7/2021 SGSOV Approved STEPHANIE SWANSON
Smoke Detectors 10/7/2021 Corrections Issued STEPHANIE SWANSON
Special/Order Compliance 10/7/2021 Partial Inspection RICHARD STEINBACH
Final 8/2/2023 Not Ready for Inspection JESUS PINEDA
Smoke Detectors 8/2/2023 Approved JESUS PINEDA
Final 9/29/2023 Permit Finaled BEN MOLSTAD