1005 N LILLIAN WAY 90038

Certificate Information: 1005 N LILLIAN WAY 90038

Application / Permit
20016-10000-24650
Plan Check / Job No.
B20LA18010
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(22) Warehouse
Work Description
Built up steel beam (New) for (e) warehouse building. (Not a change of use or no new floor area).
Permit Issued
Issued on 11/17/2020
Issuing Office
Current Status
Permit Finaled on 11/4/2021

Permit Application Status History

Submitted 9/30/2020 APPLICANT
Assigned to Plan Check Engineer 10/2/2020 LUKE GONZALES
Corrections Issued 10/6/2020 LUKE GONZALES
Applicant returned to address corrections 11/2/2020 GEORGE ALVAREZ
Building Plans Picked Up 11/9/2020 APPLICANT
Plan Check Approved 11/17/2020 CRISTINA SALAZAR
Issued 11/17/2020 APPLICANT
Permit Finaled 11/4/2021 SORIN CIRSTOIU

Permit Application Clearance Information

ZA Case Cleared 11/9/2020 MAXFIELD VERMY
ZI Cleared 11/9/2020 MAXFIELD VERMY

Contact Information

Architect Gibbs,, Kurt Robert; Lic. No.: C22275 3575 LONG BEACH BLVD      LONG BEACH, CA 90807
Contractor A M G 1983 Construction Corp; Lic. No.: 971487-B 9223 CHAPARRAL ROAD      CANOGA PARK, CA 91384
Engineer Kim,, Hong Kook; Lic. No.: C64529 3600 WILSHIRE BLVD STE 1903      LOS ANGELES, CA 90010

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Drywall Nailing 12/2/2020 Partial Approval RUSSELL BONVOULOIR
Footing/Foundation/Slab 12/2/2020 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 12/2/2020 Not Ready for Inspection RUSSELL BONVOULOIR
Drywall Nailing 1/19/2021 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 1/19/2021 Conditional Approval RUSSELL BONVOULOIR
Structural Steel Frame 1/19/2021 Approved RUSSELL BONVOULOIR
Wood Frame 1/19/2021 Partial Approval RUSSELL BONVOULOIR
Drywall Nailing 3/1/2021 Not Ready for Inspection RUSSELL BONVOULOIR
Footing/Foundation/Slab 3/1/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 3/1/2021 Approved RUSSELL BONVOULOIR
T-Bar Ceiling 3/1/2021 Conditional Approval RUSSELL BONVOULOIR
Drywall Nailing 3/8/2021 Approved RUSSELL BONVOULOIR
Insulation 3/8/2021 Approved RUSSELL BONVOULOIR
Smoke Detectors 4/28/2021 Approved TIMOTHY BUXTON
T-Bar Ceiling 4/28/2021 Approved TIMOTHY BUXTON
Drywall Nailing 5/3/2021 Partial Approval DAVID BURKHEAD
Structural Steel Frame 5/3/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 5/4/2021 Not Ready for Inspection JONATHAN QUACH
Final 6/30/2021 Not Ready for Inspection JONATHAN QUACH
SGSOV-Seismic Gas S/O Valve 6/30/2021 SGSOV Not Ready JONATHAN QUACH
Final 7/15/2021 Corrections Issued JONATHAN QUACH
SGSOV-Seismic Gas S/O Valve 7/15/2021 SGSOV Approved JONATHAN QUACH
Final 10/28/2021 Conditional Approval SORIN CIRSTOIU
Final 11/4/2021 Permit Finaled SORIN CIRSTOIU