354 N ALTA VISTA BLVD 90036

Certificate Information: 354 N ALTA VISTA BLVD 90036

Application / Permit
20016-10000-22358
Plan Check / Job No.
B20LA16416
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
REDUCE THE SIZE OF THE EXISTING DETACHED GARAGE AND CONVERT IT INTO AN ACCESSORY DWELLING UNIT PER 12.22.A.33(c) AND (d). BUILDING SHALL BE EQUIPPED WITH NFPA-13D FIRE SPRINKLER THRU-OUT. 2 OF 2
Permit Issued
Issued on 4/7/2021
Issuing Office
Current Status
CofO Issued on 10/15/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/10/2020 APPLICANT
Assigned to Plan Check Engineer 10/1/2020 JOHNNY WU
Corrections Issued 10/9/2020 JOHNNY WU
Quality Review Completed 10/15/2020 TIEN JEN WANG
Building Plans Picked Up 10/19/2020 APPLICANT
Applicant returned to address corrections 1/20/2021 JOHNNY WU
Applicant returned to address corrections 3/4/2021 JOHNNY WU
Applicant returned to address corrections 3/12/2021 JOHNNY WU
Plan Check Approved 4/7/2021 JOHNNY WU
Issued 4/7/2021 APPLICANT
CofO in Progress 10/7/2022 MICHAEL LEWIS
Permit Finaled 10/15/2022 DEROLD HAUFF
CofO Issued 10/15/2022 DEROLD HAUFF
Permit Finaled 10/15/2022 DEROLD HAUFF

Permit Application Clearance Information

Construction near power lines Cleared 11/3/2020 WALTER RAMIREZ
Address approval Cleared 2/5/2021 RENZ SORIANO
Roof/Waste drainage to street Cleared 2/5/2021 RENZ SORIANO
Sewer availability Cleared 2/5/2021 RENZ SORIANO
Eng Process Fee Ord 176,300 Cleared 2/8/2021 RENZ SORIANO
Hydrant and Access approval Cleared 3/5/2021 MATTHEW CRAIG

Contact Information

Contractor Owner-Builder       ,
Engineer De, Leon, Cynthia Aguilar; Lic. No.: C31604 8061 SAN MATEO CIR      BUENA PARK, CA 90620
Engineer Yuzon,, Benigno S; Lic. No.: S3454 2511 PEACHWOOD PLACE      WESTLAKE VILLAGE, CA 91361

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/16/2021 Approved CHRIS CHRISTENSEN
Floor/Roof Diaphrgm/Shear Wall 8/16/2021 Partial Approval CHRIS CHRISTENSEN
Footing/Foundation/Slab 8/16/2021 Approved CHRIS CHRISTENSEN
METHANE-Rough 8/16/2021 Approved CHRIS CHRISTENSEN
Underground Mechanical 8/16/2021 Approved CHRIS CHRISTENSEN
ELECTRICAL-Rough 10/8/2021 Approved CHRIS CHRISTENSEN
Excavation/Setback/Form/Re-Bar 10/8/2021 Approved CHRIS CHRISTENSEN
Footing/Foundation/Slab 10/8/2021 Approved CHRIS CHRISTENSEN
HVAC-Rough 10/8/2021 Approved CHRIS CHRISTENSEN
PLUMBING-Rough 10/8/2021 Approved CHRIS CHRISTENSEN
Pre-Inspection 10/8/2021 Approved CHRIS CHRISTENSEN
Underground Mechanical 10/8/2021 Approved CHRIS CHRISTENSEN
BUILDING-Rough-Frame 10/28/2021 Approved CHRIS CHRISTENSEN
ELECTRICAL-Rough 10/28/2021 Approved CHRIS CHRISTENSEN
HVAC-Rough 10/28/2021 Approved CHRIS CHRISTENSEN
PLUMBING-Rough 10/28/2021 Approved CHRIS CHRISTENSEN
Verify Sprinkler Sign Off 10/28/2021 Approved CHRIS CHRISTENSEN
Wood Frame 10/28/2021 Approved CHRIS CHRISTENSEN
Insulation 1/6/2022 Approved CHRIS CHRISTENSEN
Shower Pan 1/6/2022 Approved CHRIS CHRISTENSEN
Drywall Nailing 2/1/2022 Approved CHRIS CHRISTENSEN
Interior/Exterior Lathing 2/1/2022 Partial Approval CHRIS CHRISTENSEN
Drywall Nailing 2/11/2022 Approved CHRIS CHRISTENSEN
Interior/Exterior Lathing 2/11/2022 Not Ready for Inspection CHRIS CHRISTENSEN
Interior/Exterior Lathing 2/16/2022 Approved CHRIS CHRISTENSEN
ELECTRICAL-Final 10/3/2022 Approved MICHAEL LEWIS
Final 10/3/2022 Corrections Issued MICHAEL LEWIS
HVAC-Final 10/3/2022 Approved MICHAEL LEWIS
PLUMBING-Final 10/3/2022 Approved MICHAEL LEWIS
SGSOV-Seismic Gas S/O Valve 10/3/2022 SGSOV Approved MICHAEL LEWIS
Service/Power Release 10/3/2022 Approved MICHAEL LEWIS
Smoke Detectors 10/3/2022 Approved MICHAEL LEWIS
Final 10/6/2022 OK to Issue CofO MICHAEL LEWIS