6645 N SYLMAR AVE 91405

Certificate Information: 6645 N SYLMAR AVE 91405

Application / Permit
20016-10000-21853
Plan Check / Job No.
B20LA16024
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH. 93. (4) STEEL SPECIAL CANTILEVER COLUMNS.
Permit Issued
Issued on 4/8/2021
Issuing Office
Current Status
CofC Issued on 12/16/2021

Permit Application Status History

Submitted 9/3/2020 APPLICANT
Assigned to Plan Check Engineer 9/23/2020 DANIEL SANJUAN
Corrections Issued 10/2/2020 DANIEL SANJUAN
Quality Review Completed 10/6/2020 HANS SANTIAGO
Building Plans Picked Up 10/8/2020 APPLICANT
Plan Check Approved 12/15/2020 DANIEL SANJUAN
Issued 4/8/2021 APPLICANT
OK for CofC 12/7/2021 KENNETH ROBERTS
CofC Issued 12/16/2021 KENNETH ROBERTS

Permit Application Clearance Information

Tenant Habitability Plan Cleared 3/25/2021 ISMAEL HERNANDEZ

Contact Information

Contractor Omega Structural Inc; Lic. No.: 998075-B 4269 S HARVARD BOULEVARD      LOS ANGELES, CA 90062
Engineer Tajvidi,, Seyed Mohammad; Lic. No.: C84559 9163 LEROY STREET      SAN GABRIEL, CA 91775

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/20/2021 Not Ready for Inspection JOE VELASQUEZ
Deputy Drilled-In Anchors 5/24/2021 No Access for Inspection JOE VELASQUEZ
Deputy Steel/Welding 5/24/2021 No Access for Inspection JOE VELASQUEZ
Excavation/Setback/Form/Re-Bar 5/24/2021 Corrections Issued JOE VELASQUEZ
Wood Frame 5/24/2021 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 5/25/2021 Not Ready for Inspection JOE VELASQUEZ
Deputy Steel/Welding 5/26/2021 No Access for Inspection JOE VELASQUEZ
Excavation/Setback/Form/Re-Bar 5/26/2021 Approved JOE VELASQUEZ
Wood Frame 5/26/2021 Corrections Issued JOE VELASQUEZ
Deputy Reinf. Concrete 5/27/2021 No Access for Inspection JOE VELASQUEZ
Wood Frame 6/3/2021 Approved JOE VELASQUEZ
Insulation 6/7/2021 Approved SORIN CIRSTOIU
Insulation 6/9/2021 Not Ready for Inspection JOE VELASQUEZ
Deputy Wood Construction 6/10/2021 No Access for Inspection JOE VELASQUEZ
Wood Frame 6/10/2021 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 6/14/2021 Approved JOE VELASQUEZ
Interior/Exterior Lathing 6/17/2021 Not Ready for Inspection JOE VELASQUEZ
Interior/Exterior Lathing 6/21/2021 Approved JOE VELASQUEZ
Final 7/2/2021 Not Ready for Inspection JOE VELASQUEZ
SGSOV-Seismic Gas S/O Valve 7/2/2021 SGSOV Not Ready JOE VELASQUEZ
Smoke Detectors 7/2/2021 Not Ready for Inspection JOE VELASQUEZ
Final 7/8/2021 Not Ready for Inspection KENNETH ROBERTS
SGSOV-Seismic Gas S/O Valve 7/8/2021 SGSOV Not Ready KENNETH ROBERTS
Smoke Detectors 7/8/2021 Approved KENNETH ROBERTS
Final 12/7/2021 OK for CofC KENNETH ROBERTS
SGSOV-Seismic Gas S/O Valve 12/7/2021 SGSOV Approved KENNETH ROBERTS