Deputy Reinf. Concrete
|
1/15/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/19/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/20/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/21/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/22/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
1/25/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/25/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
1/26/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/26/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
1/27/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/27/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
1/28/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/28/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
1/29/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/29/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
2/1/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
2/16/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
2/17/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Light Gage Steel Frame
|
2/17/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
2/18/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
2/19/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
2/22/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
2/23/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
2/23/2021
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
2/23/2021
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Deputy Drilled-In Anchors
|
2/24/2021
|
Conditional Approval
|
TIMOTHY BUXTON
|
|
Deputy Drilled-In Anchors
|
2/25/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
2/26/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/1/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
3/1/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/2/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
3/2/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/3/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/4/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/5/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/8/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/9/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/10/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/11/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/12/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
3/15/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
3/16/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/17/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/18/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
3/18/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/19/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
3/19/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
3/22/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
3/23/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/30/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
3/31/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Reinforced Concrete Frame
|
3/31/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
4/1/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
4/5/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
4/6/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Structural Steel Frame
|
4/16/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
4/21/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
4/22/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
4/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
5/5/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/5/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/6/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/6/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/7/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/7/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Green Building Rough
|
5/10/2021
|
Approved
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/11/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/11/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/12/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/12/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/13/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/13/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/14/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/14/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/17/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/17/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/18/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/18/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/19/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/19/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/20/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/20/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Steel/Welding
|
5/20/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/21/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
5/21/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Steel/Welding
|
5/21/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/24/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Steel/Welding
|
5/24/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/25/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Steel/Welding
|
5/25/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/26/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Steel/Welding
|
5/26/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/27/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
5/28/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
6/9/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
6/11/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
6/14/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
6/15/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
6/16/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
6/17/2021
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Fireproofing
|
6/17/2021
|
Conditional Approval
|
MARK FERRARI
|
|
Drywall Nailing
|
6/17/2021
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Drilled-In Anchors
|
6/18/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Fireproofing
|
6/18/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
6/21/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
6/22/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
6/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
6/24/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
6/25/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Insulation
|
6/25/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
6/28/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
6/29/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
6/29/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
6/30/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/1/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/2/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/7/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/8/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Light Gage Steel Frame
|
7/8/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/9/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/12/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/13/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
7/14/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/15/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/16/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
7/19/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
T-Bar Ceiling
|
7/19/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/20/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/21/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/22/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Light Gage Steel Frame
|
7/22/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/23/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
7/26/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/27/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/28/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/29/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
7/30/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/2/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/3/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
T-Bar Ceiling
|
8/3/2021
|
Not Ready for Inspection
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/4/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
8/5/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
8/5/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/6/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/9/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
8/9/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/10/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/11/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/12/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/13/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Light Gage Steel Frame
|
8/19/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
8/20/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Light Gage Steel Frame
|
8/20/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
8/21/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
8/23/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
8/24/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/25/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/26/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/27/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/30/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
8/31/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
9/1/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
T-Bar Ceiling
|
9/1/2021
|
Approved
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
9/2/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
9/3/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Final
|
9/9/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Green Building Final
|
9/9/2021
|
Approved
|
RUSSELL BONVOULOIR
|
|
SGSOV-Seismic Gas S/O Valve
|
9/9/2021
|
SGSOV Approved
|
RUSSELL BONVOULOIR
|
|
Smoke Detectors
|
9/9/2021
|
Approved
|
RUSSELL BONVOULOIR
|
|
Light Gage Steel Frame
|
9/11/2021
|
Approved
|
BRUCE CAMPBELL
|
|
Final
|
9/21/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Light Gage Steel Frame
|
10/8/2021
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Final
|
10/21/2021
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Final
|
10/27/2021
|
Permit Finaled
|
SORIN CIRSTOIU
|