4950 W SUNSET BLVD LEVEL 5,6 90027

Certificate Information: 4950 W SUNSET BLVD LEVEL 5,6 90027

Application / Permit
20016-10000-19748
Plan Check / Job No.
B20LA14589
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Medical Office
Work Description
TENANT IMPROVEMENT FOR MEDICAL OFFICE BUILDING ON THE 5TH AND 6TH FLOORS. NEW NON LOAD-BEARING PARTITIONS, CEILINGS, FINISHES, AND INTERIOR DOORS. TOTAL THE AREA OF WORK IS 26,000 SF. (NO CHANGE OF USE) PLUMBING, ELECTRICAL, AND HVAC UNDER SEPERATE PERMIT.
Permit Issued
Issued on 12/16/2020
Issuing Office
Metro
Current Status
Permit Finaled on 10/27/2021

Permit Application Status History

Submitted 8/18/2020 APPLICANT
Assigned to Plan Check Engineer 9/10/2020 AUNG SOE
Corrections Issued 9/25/2020 AUNG SOE
Disabled Access Plans Picked Up 10/5/2020 APPLICANT
Quality Review Completed 10/9/2020 HERNAN ARREOLA
Applicant returned to address corrections 11/6/2020 AUNG SOE
Applicant returned to address corrections 11/9/2020 AUNG SOE
Green Plans Picked Up 11/10/2020 APPLICANT
Plan Check Approved 12/2/2020 AUNG SOE
Issued 12/16/2020 APPLICANT
Building Plans Picked Up 12/17/2020 APPLICANT
Permit Finaled 10/27/2021 SORIN CIRSTOIU

Permit Application Clearance Information

Green Code Cleared 11/9/2020 VIVIAN LAO
DAS Clearance Cleared 11/24/2020 AUNG SOE

Contact Information

Architect Lee,, Loretta J; Lic. No.: C33899 5955 W 8TH STREET UNIT 107      LOS ANGELES, CA 90036
Contractor Mccarthy Building Companies Inc; Lic. No.: 411173-B 20401 SW BIRCH STREET STE 300      NEWPORT BEACH, CA 92660
Engineer Barnard,, Matthew Patrick; Lic. No.: S5087 717 NORTH RICHMAN AVE      FULLERTON, CA 92832

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 1/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/16/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 2/17/2021 Conditional Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 2/17/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 2/18/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 2/19/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 2/22/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 2/23/2021 Conditional Approval DANIEL COLLINS
Drywall Nailing 2/23/2021 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 2/23/2021 Partial Approval TIMOTHY BUXTON
Deputy Drilled-In Anchors 2/24/2021 Conditional Approval TIMOTHY BUXTON
Deputy Drilled-In Anchors 2/25/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 2/26/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 3/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/2/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 3/2/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/3/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/4/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/5/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/8/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/9/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/10/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/11/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/16/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/18/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 3/18/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/19/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 3/19/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 3/22/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 3/23/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/30/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/31/2021 Conditional Approval RUSSELL BONVOULOIR
Reinforced Concrete Frame 3/31/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 4/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 4/5/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 4/6/2021 Conditional Approval RUSSELL BONVOULOIR
Structural Steel Frame 4/16/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 4/21/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 4/22/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 4/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/5/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/5/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/6/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/6/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/7/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/7/2021 Conditional Approval RUSSELL BONVOULOIR
Green Building Rough 5/10/2021 Approved RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/11/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/11/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/12/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/12/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/13/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/13/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/14/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/14/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/18/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/18/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/19/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/19/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/20/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/20/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 5/20/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/21/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 5/21/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 5/21/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/24/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 5/24/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/25/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 5/25/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/26/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 5/26/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/27/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 5/28/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 6/9/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 6/11/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 6/14/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 6/15/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 6/16/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 6/17/2021 Conditional Approval MARK FERRARI
Deputy Fireproofing 6/17/2021 Conditional Approval MARK FERRARI
Drywall Nailing 6/17/2021 Partial Approval MARK FERRARI
Deputy Drilled-In Anchors 6/18/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 6/18/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 6/21/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 6/22/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 6/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/24/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 6/25/2021 Conditional Approval RUSSELL BONVOULOIR
Insulation 6/25/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 6/28/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 6/29/2021 Conditional Approval RUSSELL BONVOULOIR
Drywall Nailing 6/29/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 6/30/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/2/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/7/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/8/2021 Conditional Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 7/8/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/9/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/12/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/13/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/14/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/15/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/16/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/19/2021 Conditional Approval RUSSELL BONVOULOIR
T-Bar Ceiling 7/19/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/20/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/21/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/22/2021 Conditional Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 7/22/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 7/26/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/27/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/28/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/29/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 7/30/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/2/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/3/2021 Conditional Approval RUSSELL BONVOULOIR
T-Bar Ceiling 8/3/2021 Not Ready for Inspection RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/4/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 8/5/2021 Conditional Approval RUSSELL BONVOULOIR
Drywall Nailing 8/5/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/6/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/9/2021 Conditional Approval RUSSELL BONVOULOIR
Drywall Nailing 8/9/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/10/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/11/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/12/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/13/2021 Conditional Approval JONATHAN QUACH
Light Gage Steel Frame 8/19/2021 Partial Approval RUSSELL BONVOULOIR
Drywall Nailing 8/20/2021 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 8/20/2021 Partial Approval RUSSELL BONVOULOIR
Drywall Nailing 8/21/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/23/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 8/24/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/25/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/26/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/27/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/30/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 8/31/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 9/1/2021 Conditional Approval RUSSELL BONVOULOIR
T-Bar Ceiling 9/1/2021 Approved RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 9/2/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 9/3/2021 Conditional Approval RUSSELL BONVOULOIR
Final 9/9/2021 Conditional Approval RUSSELL BONVOULOIR
Green Building Final 9/9/2021 Approved RUSSELL BONVOULOIR
SGSOV-Seismic Gas S/O Valve 9/9/2021 SGSOV Approved RUSSELL BONVOULOIR
Smoke Detectors 9/9/2021 Approved RUSSELL BONVOULOIR
Light Gage Steel Frame 9/11/2021 Approved BRUCE CAMPBELL
Final 9/21/2021 Conditional Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 10/8/2021 Partial Inspection SORIN CIRSTOIU
Final 10/21/2021 Partial Inspection SORIN CIRSTOIU
Final 10/27/2021 Permit Finaled SORIN CIRSTOIU