Deputy Grading
|
3/1/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Pre-Inspection
|
3/7/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Pre-Inspection
|
3/8/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/9/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/9/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/10/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/10/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/11/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Grading
|
3/11/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
3/11/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/14/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/14/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/15/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/15/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Green Building Rough
|
3/16/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
3/16/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Structural Steel Frame
|
3/16/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/17/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/17/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/22/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/25/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
3/29/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
3/29/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
3/31/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Footing/Foundation/Slab
|
3/31/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/4/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
4/5/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Green Building Rough
|
4/5/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
4/5/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Structural Steel Frame
|
4/5/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/6/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
4/6/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Pre-Inspection
|
4/19/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/29/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Other (see comments)
|
4/29/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
4/29/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
5/2/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
5/2/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
5/3/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
5/3/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Steel/Welding
|
5/3/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
5/4/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
5/4/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
5/5/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Steel/Welding
|
5/5/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
5/16/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
5/16/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
5/16/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
5/17/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
5/17/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
5/17/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
5/18/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
5/18/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
5/18/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
5/19/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
5/19/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
5/19/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
5/20/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/20/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
5/20/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
5/24/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Shotcrete
|
5/24/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Green Building Rough
|
5/24/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
5/24/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
5/25/2022
|
Conditional Approval
|
TERRY HERR
|
|
Deputy Shotcrete
|
5/25/2022
|
Conditional Approval
|
TERRY HERR
|
|
Deputy Drilled-In Anchors
|
5/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
5/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
5/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
5/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
5/31/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
5/31/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/2/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
6/2/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Green Building Rough
|
6/2/2022
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Reinforced Concrete Frame
|
6/2/2022
|
Partial Approval
|
JONATHAN QUACH
|
|
Structural Steel Frame
|
6/2/2022
|
Partial Approval
|
JONATHAN QUACH
|
|
Structural Steel Frame
|
6/2/2022
|
Partial Inspection
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
6/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/21/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/28/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/28/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/13/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/15/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
7/15/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Shotcrete
|
7/15/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
7/18/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/18/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
7/18/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
7/19/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/19/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
7/19/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
7/20/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/20/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
7/20/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
7/21/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/21/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
7/21/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Pre-Inspection
|
7/21/2022
|
Approved
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/21/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
7/22/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/22/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
7/22/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
7/25/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/25/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/25/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/27/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/27/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
7/27/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
7/29/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
7/29/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
7/29/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
8/1/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Excavation/Setback/Form/Re-Bar
|
8/1/2022
|
Partial Approval
|
JONATHAN QUACH
|
|
Green Building Rough
|
8/1/2022
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Reinforced Concrete Frame
|
8/1/2022
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
8/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
8/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
8/4/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/4/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/4/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
8/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
8/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
8/9/2022
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/9/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/9/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
8/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
8/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
8/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Pre-Inspection
|
8/12/2022
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
8/15/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
8/17/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
8/22/2022
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Deputy Reinf. Concrete
|
8/22/2022
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Deputy Shotcrete
|
8/22/2022
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Excavation/Setback/Form/Re-Bar
|
8/22/2022
|
Partial Approval
|
BRUCE CAMPBELL
|
|
Green Building Rough
|
8/22/2022
|
Not Ready for Inspection
|
BRUCE CAMPBELL
|
|
Reinforced Concrete Frame
|
8/22/2022
|
Partial Approval
|
BRUCE CAMPBELL
|
|
Deputy Drilled-In Anchors
|
8/23/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/23/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/23/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
8/24/2022
|
Approved
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/24/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/24/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
8/25/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/25/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/25/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
8/26/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/26/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Steel/Welding
|
8/30/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Steel/Welding
|
8/31/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Steel/Welding
|
9/1/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Steel/Welding
|
9/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
9/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
9/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
9/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
9/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
9/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
9/12/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/12/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
9/12/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
9/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
9/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
9/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
9/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
9/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
9/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
9/19/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
9/20/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/20/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
9/20/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
9/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
9/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
9/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
9/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
10/7/2022
|
Partial Inspection
|
JONATHAN QUACH
|
|
Green Building Rough
|
10/7/2022
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Reinforced Concrete Frame
|
10/7/2022
|
Partial Inspection
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
10/13/2022
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
10/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
10/27/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/27/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
10/27/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
11/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/10/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
11/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
11/17/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/17/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/17/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
11/18/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/18/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/18/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
11/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
11/22/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/22/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/22/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
11/22/2022
|
Partial Approval
|
TED RIES
|
|
Footing/Foundation/Slab
|
11/22/2022
|
Partial Approval
|
TED RIES
|
|
Structural Steel Frame
|
11/22/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/6/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/6/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/8/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/8/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/12/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/12/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/19/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/19/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
12/19/2022
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Deputy Drilled-In Anchors
|
12/20/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/20/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Reinforced Concrete Frame
|
12/20/2022
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Deputy Drilled-In Anchors
|
12/21/2022
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Deputy Shotcrete
|
12/21/2022
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Excavation/Setback/Form/Re-Bar
|
12/21/2022
|
Partial Approval
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
12/21/2022
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Deputy Drilled-In Anchors
|
12/22/2022
|
Approved
|
TIMOTHY POWELL
|
|
Deputy Shotcrete
|
12/22/2022
|
Approved
|
TIMOTHY POWELL
|
|
Excavation/Setback/Form/Re-Bar
|
12/22/2022
|
Partial Approval
|
TIMOTHY POWELL
|
|
Deputy Drilled-In Anchors
|
12/23/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/23/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/27/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/27/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/29/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/29/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/3/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Deputy Drilled-In Anchors
|
1/3/2023
|
No Access for Inspection
|
TIMOTHY POWELL
|
|
Deputy Reinf. Concrete
|
1/3/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Deputy Shotcrete
|
1/3/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Deputy Shotcrete
|
1/3/2023
|
No Access for Inspection
|
TIMOTHY POWELL
|
|
Deputy Drilled-In Anchors
|
1/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/6/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/6/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/6/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/10/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
1/10/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
1/10/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
1/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/17/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
1/17/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
1/17/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Footing/Foundation/Slab
|
1/17/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
1/17/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Piling/Pier/Caisson
|
1/17/2023
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
1/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
1/19/2023
|
Partial Approval
|
BRUCE CAMPBELL
|
|
Deputy Drilled-In Anchors
|
1/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/25/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
1/25/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
1/25/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
1/26/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
1/26/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
1/26/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Excavation/Setback/Form/Re-Bar
|
1/26/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
1/27/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
1/27/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
1/27/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
1/30/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
1/30/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Deputy Shotcrete
|
1/30/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
1/31/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
1/31/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
1/31/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
2/1/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Deputy Reinf. Concrete
|
2/1/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Deputy Shotcrete
|
2/1/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Deputy Drilled-In Anchors
|
2/3/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
2/3/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
2/3/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
2/6/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
2/6/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
2/6/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Pre-Inspection
|
2/8/2023
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
2/9/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
2/9/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
2/9/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Footing/Foundation/Slab
|
2/9/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
2/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
2/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
2/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
2/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
2/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
2/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/15/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
2/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
2/21/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Deputy Reinf. Concrete
|
2/21/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Deputy Drilled-In Anchors
|
2/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
2/23/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
2/23/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Pre-Inspection
|
2/23/2023
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
2/24/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
2/24/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
2/27/2023
|
Approved
|
TIMOTHY POWELL
|
|
Deputy Reinf. Concrete
|
2/27/2023
|
Approved
|
TIMOTHY POWELL
|
|
Deputy Drilled-In Anchors
|
2/28/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
2/28/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Special/Order Compliance
|
2/28/2023
|
Approved
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
3/1/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
3/1/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
3/3/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
3/3/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Structural Steel Frame
|
3/3/2023
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
3/6/2023
|
Partial Approval
|
TIMOTHY POWELL
|
|
Excavation/Setback/Form/Re-Bar
|
3/6/2023
|
Partial Approval
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
3/6/2023
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Deputy Shotcrete
|
3/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
3/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
3/10/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
3/15/2023
|
Corrections Issued
|
RONALD JIMENEZ
|
|
Pre-Inspection
|
3/15/2023
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
3/22/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Pre-Inspection
|
3/22/2023
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Structural Steel Frame
|
3/22/2023
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
3/29/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Structural Steel Frame
|
3/29/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
3/30/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
4/3/2023
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Excavation/Setback/Form/Re-Bar
|
4/3/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
4/6/2023
|
Partial Approval
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
4/6/2023
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Deputy Reinf. Concrete
|
4/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Drywall Nailing
|
4/18/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
4/18/2023
|
Corrections Issued
|
RONALD JIMENEZ
|
|
Footing/Foundation/Slab
|
5/2/2023
|
Corrections Issued
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
5/2/2023
|
Corrections Issued
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
5/12/2023
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Final
|
5/15/2023
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Green Building Final
|
5/15/2023
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Green Building Rough
|
5/15/2023
|
Approved
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
5/15/2023
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
SGSOV-Seismic Gas S/O Valve
|
5/15/2023
|
SGSOV Not Ready
|
RONALD JIMENEZ
|
|
Smoke Detectors
|
5/15/2023
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
5/17/2023
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
6/22/2023
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
6/26/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Special/Order Compliance
|
8/22/2023
|
Partial Inspection
|
MARTIN TAVITIAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/18/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
12/18/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
12/22/2023
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Reinforced Concrete Frame
|
1/17/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
1/24/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Masonry Wall/Backfill
|
1/24/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Masonry Wall/Backfill
|
2/9/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Masonry Wall/Backfill
|
2/23/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Deputy Drilled-In Anchors
|
3/12/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Masonry Wall/Backfill
|
3/13/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
3/15/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Pre-Inspection
|
3/20/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Structural Steel Frame
|
3/20/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Insulation
|
4/12/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
4/12/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Pre-Inspection
|
4/12/2024
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
4/15/2024
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
4/19/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
5/7/2024
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Insulation
|
5/7/2024
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
6/6/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
7/1/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Insulation
|
7/1/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
7/8/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Insulation
|
7/10/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
7/19/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
7/24/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Masonry Wall/Backfill
|
7/24/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Reinforced Masonry Frame
|
7/24/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
7/29/2024
|
Approved
|
TIMOTHY POWELL
|
|
Deputy Reinf. Masonry
|
7/29/2024
|
Approved
|
TIMOTHY POWELL
|
|
Masonry Wall/Backfill
|
7/29/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
7/30/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Reinforced Masonry Frame
|
7/30/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
8/8/2024
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
8/12/2024
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Pre-Inspection
|
8/15/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Masonry Wall/Backfill
|
8/19/2024
|
Partial Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
8/20/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Masonry Wall/Backfill
|
8/20/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Drilled-In Anchors
|
8/21/2024
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Masonry
|
8/21/2024
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Masonry Wall/Backfill
|
8/21/2024
|
Approved
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
8/27/2024
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Structural Steel Frame
|
8/29/2024
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
9/9/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
9/18/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
10/17/2024
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Reinforced Concrete Frame
|
12/19/2024
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Light Gage Steel Frame
|
1/24/2025
|
Partial Approval
|
TIMOTHY POWELL
|
|
Light Gage Steel Frame
|
6/4/2025
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Pre-Inspection
|
8/14/2025
|
Approved
|
TIMOTHY POWELL
|
|
Pre-Inspection
|
1/15/2026
|
Approved
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
1/27/2026
|
Approved
|
MARTIN TAVITIAN
|
|
Pre-Inspection
|
2/25/2026
|
Approved
|
MARTIN TAVITIAN
|