6381 W HOLLYWOOD BLVD 90028

Certificate Information: 6381 W HOLLYWOOD BLVD 90028

Application / Permit
20016-10000-16538
Plan Check / Job No.
B20LA12212
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
Seismic Upgrade to comply with NDC ordinance (NDC-572), Interiorr bathroom renovations, exterior facade renovation to existing 1922 (7 levels + 1 basement) Historic Security Pacific Bank Building - Core and Shell Only; TI Under separate permits
Permit Issued
Issued on 8/18/2021
Issuing Office
Metro
Current Status
Issued on 8/18/2021

Permit Application Status History

Submitted 8/12/2020 APPLICANT
Assigned to Plan Check Engineer 8/27/2020 SUEN LIEU
Corrections Issued 9/11/2020 SUEN LIEU
Green Plans Picked Up 9/14/2020 APPLICANT
Quality Review Completed 9/23/2020 CHARLES CHANG
Applicant returned to address corrections 10/15/2020 SUEN LIEU
Applicant returned to address corrections 10/29/2020 SUEN LIEU
Applicant returned to address corrections 11/19/2020 SUEN LIEU
Applicant returned to address corrections 1/22/2021 SUEN LIEU
Applicant returned to address corrections 3/8/2021 SUEN LIEU
Applicant returned to address corrections 3/10/2021 SUEN LIEU
Plan Check Approved 3/16/2021 SUEN LIEU
Issued 8/18/2021 APPLICANT
Building Plans Picked Up 8/19/2021 APPLICANT

Permit Application Clearance Information

CPC Cleared 11/9/2020 JASON CHAN
CPC Cleared 11/9/2020 JASON CHAN
Eng Process Fee Ord 176,300 Cleared 11/18/2020 ELAINE LEI
Metro Rail approval Cleared 11/20/2020 SUEN LIEU
Encroachment in public way Cleared 12/4/2020 ELAINE LEI
Hist. Property Cntrct Mgr Appr Cleared 1/20/2021 LAMBERT GIESSINGER
Historic monument Cleared 1/20/2021 LAMBERT GIESSINGER
Redevelopment Project Area Cleared 1/29/2021 GRACIELA ACOSTA
Redevelopment Project Area Cleared 1/29/2021 GRACIELA ACOSTA
Green Code Cleared 2/5/2021 KHEDER ALRAZAA
DAS Clearance Cleared 2/8/2021 SUEN LIEU
Fire Marshall Fire Life Safety Cleared 2/18/2021 OSCAR SALGADO JR
Work Adjacent to Public Way Cleared 2/23/2021 ARMEN SARKISIAN

Contact Information

Architect Rockefeller,, Darrell S; Lic. No.: C14927 620 24TH PLACE      HERMOSA BEACH, CA 90254
Contractor Onni Contracting (California) Inc; Lic. No.: 976929-B 1031 S BROADWAY #400      LOS ANGELES, CA 90015
Engineer Adams,, Jelisa Thomas; Lic. No.: GE3092 26632 EL TOBOSO      MISSION VIEJO, CA 92691
Engineer O'Keeffe,, Michael John; Lic. No.: S4879 1661 W 5TH AVE      VANCOUVER, BC, V6J1N5

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 3/1/2022 Conditional Approval JONATHAN QUACH
Pre-Inspection 3/7/2022 Partial Inspection SORIN CIRSTOIU
Pre-Inspection 3/8/2022 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/9/2022 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/9/2022 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/10/2022 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/10/2022 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/11/2022 Approved SORIN CIRSTOIU
Deputy Grading 3/11/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 3/11/2022 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/14/2022 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/14/2022 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/15/2022 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/15/2022 Partial Approval SORIN CIRSTOIU
Green Building Rough 3/16/2022 Partial Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 3/16/2022 Partial Approval SORIN CIRSTOIU
Structural Steel Frame 3/16/2022 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/17/2022 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/17/2022 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/22/2022 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/25/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 3/29/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 3/29/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 3/31/2022 Conditional Approval JONATHAN QUACH
Footing/Foundation/Slab 3/31/2022 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/4/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 4/5/2022 Approved SORIN CIRSTOIU
Green Building Rough 4/5/2022 Partial Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 4/5/2022 Partial Inspection SORIN CIRSTOIU
Structural Steel Frame 4/5/2022 Partial Inspection SORIN CIRSTOIU
Deputy Reinf. Concrete 4/6/2022 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 4/6/2022 Partial Approval SORIN CIRSTOIU
Pre-Inspection 4/19/2022 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/29/2022 Conditional Approval TED RIES
Deputy Other (see comments) 4/29/2022 Conditional Approval TED RIES
Deputy Steel/Welding 4/29/2022 Conditional Approval TED RIES
Deputy Drilled-In Anchors 5/2/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 5/2/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 5/3/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 5/3/2022 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 5/3/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 5/4/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 5/4/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 5/5/2022 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 5/5/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 5/16/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/16/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 5/16/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 5/17/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/17/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 5/17/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 5/18/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/18/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 5/18/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 5/19/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/19/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 5/19/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/24/2022 Approved SORIN CIRSTOIU
Deputy Shotcrete 5/24/2022 Approved SORIN CIRSTOIU
Green Building Rough 5/24/2022 Partial Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 5/24/2022 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/25/2022 Conditional Approval TERRY HERR
Deputy Shotcrete 5/25/2022 Conditional Approval TERRY HERR
Deputy Drilled-In Anchors 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/2/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 6/2/2022 Conditional Approval JONATHAN QUACH
Green Building Rough 6/2/2022 Not Ready for Inspection JONATHAN QUACH
Reinforced Concrete Frame 6/2/2022 Partial Approval JONATHAN QUACH
Structural Steel Frame 6/2/2022 Partial Approval JONATHAN QUACH
Structural Steel Frame 6/2/2022 Partial Inspection JONATHAN QUACH
Deputy Drilled-In Anchors 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/21/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/15/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/15/2022 Conditional Approval TED RIES
Deputy Shotcrete 7/15/2022 Conditional Approval TED RIES
Deputy Drilled-In Anchors 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/20/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/20/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/20/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/21/2022 Conditional Approval WINSTON DUNNING
Pre-Inspection 7/21/2022 Approved DAVID BURKHEAD
Wood Frame 7/21/2022 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/25/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/25/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/25/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/29/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/29/2022 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 7/29/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 8/1/2022 Conditional Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 8/1/2022 Partial Approval JONATHAN QUACH
Green Building Rough 8/1/2022 Not Ready for Inspection JONATHAN QUACH
Reinforced Concrete Frame 8/1/2022 Partial Approval JONATHAN QUACH
Deputy Drilled-In Anchors 8/2/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/2/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/2/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/4/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/4/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/4/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/9/2022 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/12/2022 Conditional Approval ERNESTO CORRAL
Pre-Inspection 8/12/2022 Approved DAVID BURKHEAD
Deputy Drilled-In Anchors 8/15/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 8/17/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/22/2022 Conditional Approval BRUCE CAMPBELL
Deputy Reinf. Concrete 8/22/2022 Conditional Approval BRUCE CAMPBELL
Deputy Shotcrete 8/22/2022 Conditional Approval BRUCE CAMPBELL
Excavation/Setback/Form/Re-Bar 8/22/2022 Partial Approval BRUCE CAMPBELL
Green Building Rough 8/22/2022 Not Ready for Inspection BRUCE CAMPBELL
Reinforced Concrete Frame 8/22/2022 Partial Approval BRUCE CAMPBELL
Deputy Drilled-In Anchors 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/24/2022 Approved WINSTON DUNNING
Deputy Reinf. Concrete 8/24/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/24/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/25/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/25/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/25/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/26/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/26/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/30/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/31/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 9/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/19/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/28/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 10/7/2022 Partial Inspection JONATHAN QUACH
Green Building Rough 10/7/2022 Not Ready for Inspection JONATHAN QUACH
Reinforced Concrete Frame 10/7/2022 Partial Inspection JONATHAN QUACH
Deputy Drilled-In Anchors 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 10/13/2022 Partial Approval JONATHAN QUACH
Deputy Shotcrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 10/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/10/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/18/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/18/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/18/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 11/22/2022 Partial Approval TED RIES
Footing/Foundation/Slab 11/22/2022 Partial Approval TED RIES
Structural Steel Frame 11/22/2022 Partial Approval TED RIES
Deputy Drilled-In Anchors 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/6/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/6/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/19/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/19/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 12/19/2022 Partial Inspection TIMOTHY POWELL
Deputy Drilled-In Anchors 12/20/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/20/2022 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 12/20/2022 Partial Inspection TIMOTHY POWELL
Deputy Drilled-In Anchors 12/21/2022 Conditional Approval TIMOTHY POWELL
Deputy Shotcrete 12/21/2022 Conditional Approval TIMOTHY POWELL
Excavation/Setback/Form/Re-Bar 12/21/2022 Partial Approval RONALD JIMENEZ
Reinforced Concrete Frame 12/21/2022 Not Ready for Inspection TIMOTHY POWELL
Deputy Drilled-In Anchors 12/22/2022 Approved TIMOTHY POWELL
Deputy Shotcrete 12/22/2022 Approved TIMOTHY POWELL
Excavation/Setback/Form/Re-Bar 12/22/2022 Partial Approval TIMOTHY POWELL
Deputy Drilled-In Anchors 12/23/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/23/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/29/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/29/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/3/2023 Conditional Approval TIMOTHY POWELL
Deputy Drilled-In Anchors 1/3/2023 No Access for Inspection TIMOTHY POWELL
Deputy Reinf. Concrete 1/3/2023 Conditional Approval TIMOTHY POWELL
Deputy Shotcrete 1/3/2023 Conditional Approval TIMOTHY POWELL
Deputy Shotcrete 1/3/2023 No Access for Inspection TIMOTHY POWELL
Deputy Drilled-In Anchors 1/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/10/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 1/10/2023 Conditional Approval RONALD JIMENEZ
Deputy Shotcrete 1/10/2023 Conditional Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 1/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/17/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 1/17/2023 Conditional Approval RONALD JIMENEZ
Deputy Shotcrete 1/17/2023 Conditional Approval RONALD JIMENEZ
Footing/Foundation/Slab 1/17/2023 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 1/17/2023 Partial Approval RONALD JIMENEZ
Piling/Pier/Caisson 1/17/2023 Partial Inspection RONALD JIMENEZ
Deputy Drilled-In Anchors 1/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 1/19/2023 Partial Approval BRUCE CAMPBELL
Deputy Drilled-In Anchors 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/25/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 1/25/2023 Conditional Approval RONALD JIMENEZ
Deputy Shotcrete 1/25/2023 Conditional Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 1/26/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 1/26/2023 Conditional Approval RONALD JIMENEZ
Deputy Shotcrete 1/26/2023 Conditional Approval RONALD JIMENEZ
Excavation/Setback/Form/Re-Bar 1/26/2023 Partial Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 1/27/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 1/27/2023 Conditional Approval RONALD JIMENEZ
Deputy Shotcrete 1/27/2023 Conditional Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 1/30/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 1/30/2023 Conditional Approval TIMOTHY POWELL
Deputy Shotcrete 1/30/2023 Conditional Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 1/31/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 1/31/2023 Conditional Approval RONALD JIMENEZ
Deputy Shotcrete 1/31/2023 Conditional Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 2/1/2023 Conditional Approval TIMOTHY POWELL
Deputy Reinf. Concrete 2/1/2023 Conditional Approval TIMOTHY POWELL
Deputy Shotcrete 2/1/2023 Conditional Approval TIMOTHY POWELL
Deputy Drilled-In Anchors 2/3/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 2/3/2023 Conditional Approval RONALD JIMENEZ
Deputy Shotcrete 2/3/2023 Conditional Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 2/6/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 2/6/2023 Conditional Approval RONALD JIMENEZ
Deputy Shotcrete 2/6/2023 Conditional Approval RONALD JIMENEZ
Pre-Inspection 2/8/2023 Partial Inspection RONALD JIMENEZ
Deputy Drilled-In Anchors 2/9/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 2/9/2023 Conditional Approval RONALD JIMENEZ
Deputy Shotcrete 2/9/2023 Conditional Approval RONALD JIMENEZ
Footing/Foundation/Slab 2/9/2023 Partial Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/15/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 2/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/21/2023 Conditional Approval TIMOTHY POWELL
Deputy Reinf. Concrete 2/21/2023 Conditional Approval TIMOTHY POWELL
Deputy Drilled-In Anchors 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/23/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 2/23/2023 Conditional Approval RONALD JIMENEZ
Pre-Inspection 2/23/2023 Partial Inspection RONALD JIMENEZ
Deputy Drilled-In Anchors 2/24/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 2/24/2023 Conditional Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 2/27/2023 Approved TIMOTHY POWELL
Deputy Reinf. Concrete 2/27/2023 Approved TIMOTHY POWELL
Deputy Drilled-In Anchors 2/28/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 2/28/2023 Conditional Approval RONALD JIMENEZ
Special/Order Compliance 2/28/2023 Approved RONALD JIMENEZ
Deputy Drilled-In Anchors 3/1/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 3/1/2023 Conditional Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 3/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/3/2023 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Concrete 3/3/2023 Conditional Approval RONALD JIMENEZ
Structural Steel Frame 3/3/2023 Not Ready for Inspection RONALD JIMENEZ
Drywall Nailing 3/6/2023 Partial Approval TIMOTHY POWELL
Excavation/Setback/Form/Re-Bar 3/6/2023 Partial Approval TIMOTHY POWELL
Light Gage Steel Frame 3/6/2023 Not Ready for Inspection TIMOTHY POWELL
Deputy Shotcrete 3/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/10/2023 Conditional Approval RONALD JIMENEZ
Light Gage Steel Frame 3/15/2023 Corrections Issued RONALD JIMENEZ
Pre-Inspection 3/15/2023 Partial Inspection RONALD JIMENEZ
Deputy Drilled-In Anchors 3/22/2023 Conditional Approval TIMOTHY POWELL
Pre-Inspection 3/22/2023 Partial Inspection RONALD JIMENEZ
Structural Steel Frame 3/22/2023 Partial Inspection RONALD JIMENEZ
Deputy Drilled-In Anchors 3/29/2023 Conditional Approval RONALD JIMENEZ
Structural Steel Frame 3/29/2023 Partial Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 3/30/2023 Conditional Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 4/3/2023 Conditional Approval RONALD JIMENEZ
Excavation/Setback/Form/Re-Bar 4/3/2023 Partial Approval RONALD JIMENEZ
Drywall Nailing 4/6/2023 Partial Approval TIMOTHY POWELL
Light Gage Steel Frame 4/6/2023 Not Ready for Inspection TIMOTHY POWELL
Deputy Reinf. Concrete 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 4/18/2023 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 4/18/2023 Corrections Issued RONALD JIMENEZ
Footing/Foundation/Slab 5/2/2023 Corrections Issued RONALD JIMENEZ
Light Gage Steel Frame 5/2/2023 Corrections Issued RONALD JIMENEZ
Light Gage Steel Frame 5/12/2023 Not Ready for Inspection RONALD JIMENEZ
Final 5/15/2023 Not Ready for Inspection RONALD JIMENEZ
Green Building Final 5/15/2023 Not Ready for Inspection RONALD JIMENEZ
Green Building Rough 5/15/2023 Approved RONALD JIMENEZ
Reinforced Concrete Frame 5/15/2023 Not Ready for Inspection RONALD JIMENEZ
SGSOV-Seismic Gas S/O Valve 5/15/2023 SGSOV Not Ready RONALD JIMENEZ
Smoke Detectors 5/15/2023 Not Ready for Inspection RONALD JIMENEZ
Light Gage Steel Frame 5/17/2023 Not Ready for Inspection RONALD JIMENEZ
Light Gage Steel Frame 6/22/2023 Partial Inspection RONALD JIMENEZ
Light Gage Steel Frame 6/26/2023 Partial Approval RONALD JIMENEZ
Special/Order Compliance 8/22/2023 Partial Inspection MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 12/18/2023 Partial Approval RONALD JIMENEZ
Reinforced Concrete Frame 12/18/2023 Partial Approval RONALD JIMENEZ
Deputy Reinf. Concrete 12/22/2023 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 1/17/2024 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 1/24/2024 Partial Approval RAFAEL CORTES
Masonry Wall/Backfill 1/24/2024 Partial Approval RAFAEL CORTES
Masonry Wall/Backfill 2/9/2024 Partial Approval TIMOTHY POWELL
Masonry Wall/Backfill 2/23/2024 Partial Approval TIMOTHY POWELL
Deputy Drilled-In Anchors 3/12/2024 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 3/13/2024 Partial Approval TIMOTHY POWELL
Drywall Nailing 3/15/2024 Partial Approval TIMOTHY POWELL
Pre-Inspection 3/20/2024 Partial Inspection JEFFREY FULTON
Structural Steel Frame 3/20/2024 Corrections Issued JEFFREY FULTON
Insulation 4/12/2024 Not Ready for Inspection TIMOTHY POWELL
Light Gage Steel Frame 4/12/2024 Not Ready for Inspection TIMOTHY POWELL
Pre-Inspection 4/12/2024 Partial Inspection TIMOTHY POWELL
Light Gage Steel Frame 4/15/2024 Partial Inspection TIMOTHY POWELL
Light Gage Steel Frame 4/19/2024 Partial Approval TIMOTHY POWELL
Drywall Nailing 5/7/2024 Partial Inspection TIMOTHY POWELL
Insulation 5/7/2024 Partial Inspection TIMOTHY POWELL
Light Gage Steel Frame 6/6/2024 Partial Approval TIMOTHY POWELL
Drywall Nailing 7/1/2024 Partial Approval TIMOTHY POWELL
Insulation 7/1/2024 Not Ready for Inspection TIMOTHY POWELL
Drywall Nailing 7/8/2024 Partial Approval TIMOTHY POWELL
Insulation 7/10/2024 Partial Approval TIMOTHY POWELL
Drywall Nailing 7/19/2024 Partial Approval TIMOTHY POWELL
Drywall Nailing 7/24/2024 Partial Approval RONALD JIMENEZ
Masonry Wall/Backfill 7/24/2024 Partial Approval RONALD JIMENEZ
Reinforced Masonry Frame 7/24/2024 Partial Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 7/29/2024 Approved TIMOTHY POWELL
Deputy Reinf. Masonry 7/29/2024 Approved TIMOTHY POWELL
Masonry Wall/Backfill 7/29/2024 Not Ready for Inspection TIMOTHY POWELL
Light Gage Steel Frame 7/30/2024 Not Ready for Inspection TIMOTHY POWELL
Reinforced Masonry Frame 7/30/2024 Not Ready for Inspection TIMOTHY POWELL
Light Gage Steel Frame 8/8/2024 Partial Inspection TIMOTHY POWELL
Light Gage Steel Frame 8/12/2024 Not Ready for Inspection RONALD JIMENEZ
Pre-Inspection 8/15/2024 Not Ready for Inspection TIMOTHY POWELL
Masonry Wall/Backfill 8/19/2024 Partial Inspection RAMAZANALI ALMASI
Light Gage Steel Frame 8/20/2024 Not Ready for Inspection RAFAEL CORTES
Masonry Wall/Backfill 8/20/2024 Partial Approval RAFAEL CORTES
Deputy Drilled-In Anchors 8/21/2024 Conditional Approval RONALD JIMENEZ
Deputy Reinf. Masonry 8/21/2024 Conditional Approval RONALD JIMENEZ
Masonry Wall/Backfill 8/21/2024 Approved RONALD JIMENEZ
Light Gage Steel Frame 8/27/2024 Conditional Approval DARRYL ARNOLD
Structural Steel Frame 8/29/2024 Partial Inspection TIMOTHY POWELL
Drywall Nailing 9/9/2024 Partial Approval TIMOTHY POWELL
Drywall Nailing 9/18/2024 Partial Approval TIMOTHY POWELL
Light Gage Steel Frame 10/17/2024 Partial Inspection TIMOTHY POWELL
Reinforced Concrete Frame 12/19/2024 Partial Approval PAUL BAZERKANIAN
Light Gage Steel Frame 1/24/2025 Partial Approval TIMOTHY POWELL
Light Gage Steel Frame 6/4/2025 Partial Inspection TIMOTHY POWELL
Pre-Inspection 8/14/2025 Approved TIMOTHY POWELL
Pre-Inspection 1/15/2026 Approved EDWIN GREGORYONA
Pre-Inspection 1/27/2026 Approved MARTIN TAVITIAN
Pre-Inspection 2/25/2026 Approved MARTIN TAVITIAN