2528 N CANYON DR 90068

Certificate Information: 2528 N CANYON DR 90068

Application / Permit
20016-10000-14783
Plan Check / Job No.
B20LA10993
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL KITCHEN, GUEST ROOM AND BATH, IN TO KITCHEN, DEN, LAUNDRY ROOM, POWDER ROOM ON FIRST FLOOR. ADD MASTER BATH IN EXISTING CLOSET AND RECONFIGURE CLOSETS ON SECOND FLOOR. AND EXTERIOR ALTERATION ON (E) TWO STORY SFD. (NO CHANGE IN FLOOR AREA OR HEIGHT)
Permit Issued
Issued on 7/23/2020
Issuing Office
Current Status
Permit Finaled on 3/29/2022

Permit Application Status History

Submitted 6/23/2020 APPLICANT
Assigned to Plan Check Engineer 6/23/2020 TSE MING HUANG
Corrections Issued 6/24/2020 TSE MING HUANG
Plan Check Approved 7/15/2020 AUNG SOE
Issued 7/23/2020 APPLICANT
Building Plans Picked Up 7/27/2020 APPLICANT
Permit Finaled 3/25/2022 BRIAN SULLIVAN

Permit Application Clearance Information

"D" conditions Cleared 7/9/2020 RUBEN VASQUEZ
ZI Cleared 7/9/2020 RUBEN VASQUEZ
Grading Pre-Inspection Cleared 7/13/2020 ROBERT HUGHES
Eng Process Fee Ord 176,300 Cleared 7/14/2020 JEANIE LAM
Sewer availability Cleared 7/14/2020 JEANIE LAM

Contact Information

Contractor Living Los Angeles Construction; Lic. No.: 948471-B 2120 POWERS STREET      POMONA, CA 91766
Engineer Garcia,, Ricardo Ray; Lic. No.: C66957 27702 QUINCY ST      CASTAIC, CA 91384

Inspector Information

CRAIG VAUGHAN, (213) 202-3250 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/28/2020 Approved ENRIQUE MIRELES
BUILDING-Rough-Frame 8/5/2020 Not Ready for Inspection BRIAN SULLIVAN
ELECTRICAL-Rough 8/5/2020 Approved BRIAN SULLIVAN
PLUMBING-Rough 8/7/2020 Conditional Approval BRIAN SULLIVAN
Wood Frame 8/10/2020 Partial Approval BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 8/17/2020 Partial Approval BRIAN SULLIVAN
Insulation 8/17/2020 Not Ready for Inspection BRIAN SULLIVAN
Interior/Exterior Lathing 8/17/2020 Partial Approval BRIAN SULLIVAN
Shower Pan 8/17/2020 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 8/21/2020 Not Ready for Inspection BRIAN SULLIVAN
Deputy Wood Construction 8/21/2020 Conditional Approval DAVID MATSON
Wood Frame 8/25/2020 Conditional Approval BRIAN SULLIVAN
Drywall Nailing 8/28/2020 Conditional Approval BRIAN SULLIVAN
Interior/Exterior Lathing 8/31/2020 Approved BRIAN SULLIVAN
Shower Pan 9/29/2020 Not Ready for Inspection BRIAN SULLIVAN
Shower Pan 10/8/2020 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 12/15/2020 SGSOV Not Ready BRIAN SULLIVAN
Final 2/17/2021 Corrections Issued BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 2/17/2021 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 2/17/2021 Approved BRIAN SULLIVAN
Final 7/14/2021 Conditional Approval RAUL BARAJAS
Final 3/25/2022 Permit Finaled BRIAN SULLIVAN