840 S ALVARADO ST 90057

Certificate Information: 840 S ALVARADO ST 90057

Application / Permit
20016-10000-14184
Plan Check / Job No.
B20LA10551
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
REMODEL EXISTING BUILDING TO ACCOMMODATE AUTO PART RETAIL STORE- REMODEL FRONT FACADE AND OPEN CONCRETE WALL FOR NEW DOORS AND INFILL SOME (E) CONCRETE OPENINGS. INTERIOR T.I. ENTIRE BUILDING, AND REMOVE MEZZANINE LEVEL, RESTRIPE PARKING LOT. ADD MECHANICAL UNIT ON ROOFTOP, WEIGHT=1050#
Permit Issued
Issued on 1/12/2021
Issuing Office
Current Status
CofO Issued on 6/9/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/26/2020 APPLICANT
Assigned to Plan Check Engineer 7/16/2020 SAM CHANG
Corrections Issued 7/23/2020 SAM CHANG
Quality Review Completed 7/31/2020 TIEN JEN WANG
Building Plans Picked Up 11/13/2020 APPLICANT
Green Plans Picked Up 12/24/2020 APPLICANT
Plan Check Approved 1/12/2021 SAM CHANG
Issued 1/12/2021 APPLICANT
CofO in Progress 6/9/2022 TIMOTHY BUXTON
CofO Issued 6/9/2022 ERNESTO CORRAL
Permit Finaled 6/9/2022 ERNESTO CORRAL

Permit Application Clearance Information

Work Adjacent to Public Way Cleared 9/10/2020 ARMEN SARKISIAN
Redevelopment Project Area Cleared 9/21/2020 DAVID URITA
ZI Cleared 9/21/2020 DAVID URITA
DAS Clearance Cleared 11/5/2020 SAM CHANG
Green Code Cleared 12/24/2020 AARON COSTA
Eng Process Fee Ord 176,300 Cleared 1/5/2021 JEANIE LAM

Contact Information

Architect Wichmann,, Quin Andrew; Lic. No.: C28957 15 W 7TH STREET      COVINGTON, KY 41011
Contractor Hanna Design Group Inc; Lic. No.: 872509-B 650 E ALGONQUIN RD ST 405      SCHAUMBURG, IL 60173
Engineer Flum,, David; Lic. No.: C45688 PO BOX 717      WINDSOR, CA 95492

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/12/2021 No Access for Inspection KATY RAMIREZ
Footing/Foundation/Slab 3/9/2021 Partial Approval KATY RAMIREZ
Pre-Inspection 3/9/2021 Approved KATY RAMIREZ
Deputy Drilled-In Anchors 3/11/2021 Conditional Approval RONALD PACHECO
Deputy Reinf. Concrete 3/11/2021 Conditional Approval RONALD PACHECO
Footing/Foundation/Slab 3/11/2021 Partial Approval RONALD PACHECO
Deputy Drilled-In Anchors 7/7/2021 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/8/2021 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/9/2021 Conditional Approval DANIEL COLLINS
Drywall Nailing 7/12/2021 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 7/12/2021 Partial Inspection KATY RAMIREZ
Reinforced Masonry Frame 7/15/2021 Corrections Issued KATY RAMIREZ
Deputy Reinf. Masonry 7/16/2021 Conditional Approval KATY RAMIREZ
Masonry Wall/Backfill 7/19/2021 Approved DANIEL COLLINS
Wood Frame 7/19/2021 Approved DANIEL COLLINS
Light Gage Steel Frame 7/21/2021 Approved DANIEL COLLINS
Reinforced Concrete Frame 7/21/2021 Approved DANIEL COLLINS
Drywall Nailing 7/26/2021 Approved DANIEL COLLINS
Interior/Exterior Lathing 7/26/2021 Approved DANIEL COLLINS
Deputy Drilled-In Anchors 8/12/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/13/2021 Conditional Approval JONATHAN QUACH
Final 3/2/2022 Not Ready for Inspection TIMOTHY BUXTON
Green Building Final 3/2/2022 Not Ready for Inspection TIMOTHY BUXTON
SGSOV-Seismic Gas S/O Valve 3/2/2022 SGSOV No Gas TIMOTHY BUXTON
Smoke Detectors 3/2/2022 Approved TIMOTHY BUXTON
Final 3/30/2022 Not Ready for Inspection DARRYL ARNOLD
Green Building Final 3/30/2022 Conditional Approval DARRYL ARNOLD
Green Building Rough 3/30/2022 Conditional Approval DARRYL ARNOLD
Final 6/9/2022 Conditional Approval TIMOTHY BUXTON
Green Building Final 6/9/2022 Approved TIMOTHY BUXTON