6636 W MOORE DR 90048

Certificate Information: 6636 W MOORE DR 90048

Application / Permit
20016-10000-13068
Plan Check / Job No.
B20LA09765
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR/ EXTERIOR REMODEL OF (E) ONE-STORY SFD. REMODEL OF (E) KITCHEN, DINING ROOM, AND MASTER BATHROOM. CONVERT (E) 3/4 BATHROOM TO FULLBATHROOM, (E) HALLWAY TO 1/2 BATHROOM, (E) BEDROOM TO STUDY ROOM. ADD AND REMOVE ONE WINDOW AT MASTERBATHROOM AREA. ALL WORK PER ENGINEERED DESIGN.
Permit Issued
Issued on 7/15/2020
Issuing Office
Metro
Current Status
Permit Finaled on 2/10/2021

Permit Application Status History

Submitted 6/4/2020 APPLICANT
Assigned to Plan Check Engineer 6/5/2020 CRISTINA SALAZAR
Corrections Issued 6/5/2020 CRISTINA SALAZAR
Plan Check Approved 7/1/2020 GEORGE ALVAREZ
No Progress 7/9/2020 GEORGE ALVAREZ
Plan Check Approved 7/10/2020 GEORGE ALVAREZ
Issued 7/15/2020 APPLICANT
Building Plans Picked Up 7/16/2020 APPLICANT
Permit Finaled 2/10/2021 JOSEPH MCGARRY

Permit Application Clearance Information

HPOZ Cleared 7/9/2020 JONATHAN KAPLAN

Contact Information

Contractor S E V Enterprises; Lic. No.: 1030297-B 4732 W 160TH STREET      LAWNDALE, CA 90260
Engineer Singh,, Jasbir; Lic. No.: C38767 16194 EASTRIDGE CT      CHINO HILLS, CA 91709

Inspector Information

RONNIE MINDANAO, (213) 202-3252 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/3/2020 Approved ARTHUR SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 8/18/2020 Approved ARTHUR SARGSYAN
Gas Test 8/18/2020 Approved ARTHUR SARGSYAN
PLUMBING-Rough 8/18/2020 Approved ARTHUR SARGSYAN
Underground Mechanical 8/18/2020 Approved ARTHUR SARGSYAN
BUILDING-Rough-Frame 9/23/2020 Not Ready for Inspection ARTHUR SARGSYAN
ELECTRICAL-Rough 9/23/2020 Not Ready for Inspection ARTHUR SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 9/23/2020 Approved ARTHUR SARGSYAN
HVAC-Rough 9/23/2020 Not Ready for Inspection ARTHUR SARGSYAN
Wood Frame 9/23/2020 Not Ready for Inspection ARTHUR SARGSYAN
ELECTRICAL-Rough 9/29/2020 Approved ARTHUR SARGSYAN
HVAC-Rough 9/29/2020 Approved ARTHUR SARGSYAN
PLUMBING-Rough 9/29/2020 Approved ARTHUR SARGSYAN
Rough-Elec/Plmb/HVAC 9/29/2020 Approved ARTHUR SARGSYAN
Wood Frame 9/29/2020 Approved ARTHUR SARGSYAN
Insulation 10/2/2020 Approved JOSEPH MCGARRY
Drywall Nailing 10/9/2020 Approved ARTHUR SARGSYAN
Drywall Nailing 10/9/2020 Off-Hour Fees Due
Interior/Exterior Lathing 10/19/2020 Partial Approval JOSEPH MCGARRY
Shower Pan 10/19/2020 Approved JOSEPH MCGARRY
Underground Mechanical 11/25/2020 Partial Approval DAVID CHAN
Service/Power Release 12/2/2020 Approved JOSEPH MCGARRY
Interior/Exterior Lathing 12/7/2020 Not Ready for Inspection DAVID CHAN
Interior/Exterior Lathing 12/11/2020 Approved JOSEPH MCGARRY
ELECTRICAL-Final 1/21/2021 Not Ready for Inspection STUART CHAPMAN
Final 1/21/2021 Corrections Issued STUART CHAPMAN
HVAC-Final 1/21/2021 Not Ready for Inspection STUART CHAPMAN
PLUMBING-Final 1/21/2021 Not Ready for Inspection STUART CHAPMAN
ELECTRICAL-Final 2/2/2021 Approved CHRIS CHRISTENSEN
HVAC-Final 2/2/2021 Approved CHRIS CHRISTENSEN
PLUMBING-Final 2/2/2021 Approved CHRIS CHRISTENSEN
SGSOV-Seismic Gas S/O Valve 2/4/2021 SGSOV Not Ready JOSEPH MCGARRY
Final 2/8/2021 Corrections Issued SCOTT FINNILA
Green Building Final 2/8/2021 Approved SCOTT FINNILA
SGSOV-Seismic Gas S/O Valve 2/8/2021 SGSOV Not Ready SCOTT FINNILA
Smoke Detectors 2/8/2021 Approved SCOTT FINNILA
Final 2/10/2021 Permit Finaled JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 2/10/2021 SGSOV Approved JOSEPH MCGARRY
Smoke Detectors 2/10/2021 Approved JOSEPH MCGARRY