INTERIOR REMODEL TO (E) SINGLE FAMILY DWELLING [26'x22' 1-Story / 1924LA43550]. ADD BEAMS AND CONCRETE PADS PER ENGINEER. REMOVE UNPERMITTED ADITIONS TO SIDE AND REAR. RESTORE TO APPROVED SIZE OF [26' X 22']
Permit Issued
Issued on 7/1/2020
Issuing Office
Current Status
Permit Finaled on 4/5/2021

Permit Application Status History

Submitted 3/20/2020 APPLICANT
Assigned to Plan Check Engineer 3/23/2020 KEVIN MORALES
Corrections Issued 3/23/2020 KEVIN MORALES
Applicant returned to address corrections 4/21/2020 JESSE JIMENEZ
Applicant returned to address corrections 4/22/2020 JESSE JIMENEZ
Applicant returned to address corrections 4/28/2020 JESSE JIMENEZ
Plan Check Approved 6/23/2020 ADAM HEGAZI
Issued 7/1/2020 APPLICANT
Building Plans Picked Up 7/9/2020 APPLICANT
Permit Finaled 4/5/2021 OSVALDO PARAMO

Permit Application Clearance Information

Grading Pre-Inspection Cleared 4/13/2020 KIRK LINKLATER

Contact Information

Contractor Av Design Build Construction; Lic. No.: 1033230-B 4654 E AVE S UNIT B116      PALMDALE, CA 93552
Engineer Salto,, Alvaro; Lic. No.: C83859 7366 W MANCHESTER AVE #B      LOS ANGELES, CA 90045

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/14/2020 Approved OSVALDO PARAMO
ELECTRICAL-Rough 8/18/2020 Not Ready for Inspection OSVALDO PARAMO
HVAC-Rough 8/18/2020 Not Ready for Inspection OSVALDO PARAMO
PLUMBING-Rough 8/18/2020 Not Ready for Inspection OSVALDO PARAMO
Wood Frame 8/18/2020 Not Ready for Inspection OSVALDO PARAMO
ELECTRICAL-Rough 9/8/2020 Approved OSVALDO PARAMO
HVAC-Rough 9/8/2020 Not Ready for Inspection OSVALDO PARAMO
PLUMBING-Rough 9/8/2020 Corrections Issued OSVALDO PARAMO
HVAC-Rough 9/11/2020 Corrections Issued OSVALDO PARAMO
PLUMBING-Rough 9/11/2020 Approved OSVALDO PARAMO
Wood Frame 9/11/2020 Partial Approval OSVALDO PARAMO
HVAC-Rough 9/17/2020 Approved OSVALDO PARAMO
PLUMBING-Rough 9/17/2020 Approved OSVALDO PARAMO
BUILDING-Rough-Frame 9/29/2020 Corrections Issued OSVALDO PARAMO
MERV13>=Rough 9/29/2020 Approved OSVALDO PARAMO
Floor/Roof Diaphrgm/Shear Wall 10/2/2020 Approved OSVALDO PARAMO
Wood Frame 10/2/2020 Approved OSVALDO PARAMO
Insulation 10/13/2020 Approved OSVALDO PARAMO
Drywall Nailing 10/22/2020 Approved OSVALDO PARAMO
BUILDING-Rough-Frame 2/12/2021 Approved OSVALDO PARAMO
Final 2/12/2021 Corrections Issued OSVALDO PARAMO
MERV13>=Final 2/12/2021 Not Ready for Inspection OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 2/12/2021 SGSOV Not Ready OSVALDO PARAMO
Smoke Detectors 2/12/2021 Not Ready for Inspection OSVALDO PARAMO
Final 3/16/2021 Corrections Issued OSVALDO PARAMO
MERV13>=Final 3/16/2021 Not Ready for Inspection OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 3/16/2021 SGSOV Approved OSVALDO PARAMO
Smoke Detectors 3/16/2021 Approved OSVALDO PARAMO
Final 4/5/2021 Permit Finaled OSVALDO PARAMO
MERV13>=Final 4/5/2021 Approved OSVALDO PARAMO