17045 W OTSEGO ST 91316

Certificate Information: 17045 W OTSEGO ST 91316

Application / Permit
20016-10000-07901
Plan Check / Job No.
B20LA05600
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED INTERIOR REMODEL TO EXISTING SINGLE FAMILY DWELLING WHICH WILL INCLUDE THE REMOVAL OF A PARTIAL BEARING WALL ON THE FIRST FLOOR. AND CONVERT EXISTING BATHROOM AND CLOSET INTO TWO SEPERATE BATHROOMS ON THE SECOND FLOOR. ALL WORK PER ENGINEER OR RECORD.
Permit Issued
Issued on 4/28/2020
Issuing Office
Valley
Current Status
Permit Finaled on 8/18/2020

Permit Application Status History

Submitted 3/19/2020 APPLICANT
Assigned to Plan Check Engineer 3/19/2020 FERNANDO FLORES
Corrections Issued 3/19/2020 FERNANDO FLORES
Applicant returned to address corrections 4/7/2020 CRISTINA SALAZAR
Plan Check Approved 4/16/2020 MICHAEL LOPEZ
Building Plans Picked Up 4/17/2020 APPLICANT
Issued 4/28/2020 LADBS
Permit Finaled 8/18/2020 STEVEN BACK

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/27/2020 GUILLERMO PETRA
Sewer availability Cleared 3/27/2020 JOHN TRIANTAFYLLOS
Public Works-Highway Ded. Cleared 3/31/2020 LEE GUILBEAUX
Public Works-Sewers Cleared 3/31/2020 LEE GUILBEAUX
Public Works-Open Permits Cleared 3/31/2020 LEE GUILBEAUX

Contact Information

Contractor Kotov Construction Inc; Lic. No.: 1062227-B 22525 SHERMAN WAY UNIT 402      WEST HILLS, CA 91307
Engineer Levin,, Vladimir; Lic. No.: C35001 207 N BOWLING GREEN WAY      LOS ANGELES, CA 90049

Inspector Information

JON MCHUGH, (818) 774-4348 Office Hours: 7:00-8:00 AM MON-FRI
IVAN SARABIA, (818) 774-4348 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 4/30/2020 Not Ready for Inspection STEVEN BACK
ELECTRICAL-Rough 4/30/2020 Not Ready for Inspection STEVEN BACK
HVAC-Rough 4/30/2020 Approved STEVEN BACK
PLUMBING-Rough 4/30/2020 Corrections Issued STEVEN BACK
BUILDING-Rough-Frame 5/5/2020 Partial Approval STEVEN BACK
ELECTRICAL-Rough 5/5/2020 Approved STEVEN BACK
HVAC-Rough 5/5/2020 Approved STEVEN BACK
PLUMBING-Rough 5/5/2020 Approved STEVEN BACK
Drywall Nailing 5/12/2020 Partial Approval STEVEN BACK
Interior/Exterior Lathing 5/12/2020 Partial Approval STEVEN BACK
Shower Pan 5/12/2020 Approved STEVEN BACK
Footing/Foundation/Slab 7/1/2020 Corrections Issued STEVEN BACK
Footing/Foundation/Slab 7/6/2020 Corrections Issued STEVEN BACK
Footing/Foundation/Slab 7/9/2020 Approved STEVEN BACK
Wood Frame 7/15/2020 Approved STEVEN BACK
Drywall Nailing 7/21/2020 Approved STEVEN BACK
BUILDING-Rough-Frame 8/18/2020 Approved STEVEN BACK
Final 8/18/2020 Permit Finaled STEVEN BACK
Smoke Detectors 8/18/2020 Approved STEVEN BACK