5333 N RIVERTON AVE 91601

Certificate Information: 5333 N RIVERTON AVE 91601

Application / Permit
20016-10000-06946
Plan Check / Job No.
B20LA04785
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT PER LABC CHAPTER 93. INSTALL STEEL CANTILEVER COLUMNS AND PLYWOOD SHEAR WALLS.
Permit Issued
Issued on 6/30/2020
Issuing Office
Current Status
CofC Issued on 10/7/2021

Permit Application Status History

Submitted 3/10/2020 APPLICANT
Assigned to Plan Check Engineer 4/1/2020 MANUEL MONTUFAR
Corrections Issued 4/7/2020 MANUEL MONTUFAR
Quality Review Completed 4/14/2020 HANS SANTIAGO
Applicant returned to address corrections 5/8/2020 MANUEL MONTUFAR
Applicant returned to address corrections 5/22/2020 MANUEL MONTUFAR
Plan Check Approved 5/28/2020 MANUEL MONTUFAR
Issued 6/30/2020 APPLICANT
OK for CofC 7/2/2021 KENNETH ROBERTS
CofC Issued 10/7/2021 KENNETH ROBERTS

Permit Application Clearance Information

Historic Resource Verification Cleared 5/11/2020 MICAELA TORRES-GIL
Redevelopment Project Area Cleared 5/14/2020 DAVID URITA
Tenant Habitability Plan Cleared 6/24/2020 MICHAEL SOTO

Contact Information

Contractor Repipe 1 Restoration Inc; Lic. No.: 1003868-B       ,
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 743 S SIERRA VISTA AVE C      ALHAMBRA, CA 91801

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/14/2020 Not Ready for Inspection JOE VELASQUEZ
Deputy Steel/Welding 8/21/2020 No Access for Inspection JOE VELASQUEZ
Footing/Foundation/Slab 8/24/2020 Approved JOE VELASQUEZ
Structural Steel Frame 8/24/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 8/24/2020 Not Ready for Inspection JOE VELASQUEZ
Structural Steel Frame 9/4/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 9/4/2020 Partial Approval JOE VELASQUEZ
Structural Steel Frame 9/18/2020 Approved JOE VELASQUEZ
Wood Frame 9/18/2020 Approved JOE VELASQUEZ
Interior/Exterior Lathing 9/24/2020 Approved JOE VELASQUEZ
Final 6/14/2021 Not Ready for Inspection JOE VELASQUEZ
METHANE-Final 6/14/2021 Not Ready for Inspection JOE VELASQUEZ
SGSOV-Seismic Gas S/O Valve 6/14/2021 SGSOV Not Ready JOE VELASQUEZ
Smoke Detectors 6/14/2021 Not Ready for Inspection JOE VELASQUEZ
Final 7/2/2021 OK for CofC KENNETH ROBERTS
METHANE-Final 7/2/2021 Approved KENNETH ROBERTS
SGSOV-Seismic Gas S/O Valve 7/2/2021 SGSOV Approved KENNETH ROBERTS
Smoke Detectors 7/2/2021 Approved KENNETH ROBERTS