2563-2563 1/2 E GANAHL ST 90033
Certificate Information: 2563-2563 1/2 E GANAHL ST 90033
- Application / Permit
- 20016-10000-06513
- Plan Check / Job No.
- X20LA04111
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- 20 Window and 4 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. 2 Kitchen 2 bathroom remodel for residential buildings (no structural changes). Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___25___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. Replace drywall (no new walls added) for single family dwellings and duplexes only.
- Permit Issued
- Issued on 3/4/2020
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 9/1/2020
Permit Application Status History
| Issued | 3/4/2020 | LADBS |
| Permit Finaled | 8/31/2020 | OSVALDO PARAMO |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Av Design Build Construction; Lic. No.: 1033230-B | 4654 E AVE S UNIT B116 PALMDALE, CA 93552 |
Inspector Information
| OSVALDO PARAMO, (213) 202-9854 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Insulation | 4/13/2020 | Approved | CHRISTOPHER DELLEFIELD |
| Interior/Exterior Lathing | 4/13/2020 | Partial Approval | CHRISTOPHER DELLEFIELD |
| Drywall Nailing | 4/17/2020 | Approved | OSVALDO PARAMO |
| Final | 8/20/2020 | Corrections Issued | OSVALDO PARAMO |
| SGSOV-Seismic Gas S/O Valve | 8/20/2020 | SGSOV Approved | OSVALDO PARAMO |
| Smoke Detectors | 8/20/2020 | Approved | OSVALDO PARAMO |
| Final | 8/31/2020 | Permit Finaled | OSVALDO PARAMO |