1226-1228 S MEADOWBROOK AVE 90019

Certificate Information: 1226-1228 S MEADOWBROOK AVE 90019

Application / Permit
20016-10000-05779
Plan Check / Job No.
B20LA03863
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
INTERIOR REMODELING AND WINDOW CHANGE (REPLACE AND ADD) FOR EXISTING DUPLEX
Permit Issued
Issued on 6/4/2020
Issuing Office
Current Status
Permit Finaled on 6/15/2021

Permit Application Status History

Submitted 2/26/2020 APPLICANT
Assigned to Plan Check Engineer 3/6/2020 ADAM HEGAZI
Corrections Issued 3/6/2020 ADAM HEGAZI
Plan Check Approved 3/18/2020 ADAM HEGAZI
Issued 6/4/2020 APPLICANT
Building Plans Picked Up 6/8/2020 APPLICANT
Permit Finaled 6/15/2021 JOSEPH MCGARRY

Permit Application Clearance Information

HPOZ Cleared 3/18/2020 DANIEL MATA
Historic monument Cleared 3/18/2020 DANIEL MATA

Contact Information

Architect Park,, Yong Keun; Lic. No.: C24806 351 CANON DE PARAISO LN      LA CANADA FLINTRIDGE, CA 91011
Contractor Space C & C Inc; Lic. No.: 1065583-B 1234 S HARVARD BLVD      LOS ANGELES, CA 90006
Engineer Lee,, Sang Youck; Lic. No.: S3821 3531 BROOKHILL ST      GLENDALE, CA 91214

Inspector Information

RONNIE MINDANAO, (213) 202-3252 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/20/2020 Approved ARTHUR SARGSYAN
ELECTRICAL-Rough 10/30/2020 Approved ARTHUR SARGSYAN
PLUMBING-Rough 10/30/2020 Approved ARTHUR SARGSYAN
Wood Frame 10/30/2020 Approved ARTHUR SARGSYAN
HVAC-Rough 11/9/2020 Corrections Issued DONALD CRICHLOW
Wood Frame 11/9/2020 Approved DONALD CRICHLOW
HVAC-Rough 11/18/2020 Corrections Issued JOSEPH MCGARRY
Insulation 11/18/2020 Corrections Issued JOSEPH MCGARRY
HVAC-Rough 11/24/2020 Approved CHRIS CHRISTENSEN
Insulation 11/24/2020 Approved CHRIS CHRISTENSEN
Interior/Exterior Lathing 11/24/2020 Approved CHRIS CHRISTENSEN
Drywall Nailing 12/3/2020 Approved SABAS ALONSO
ELECTRICAL-Final 4/30/2021 Corrections Issued SCOTT FINNILA
Final 4/30/2021 Partial Inspection SCOTT FINNILA
HVAC-Final 4/30/2021 Corrections Issued SCOTT FINNILA
PLUMBING-Final 4/30/2021 Approved SCOTT FINNILA
Final 5/19/2021 Not Ready for Inspection JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 5/19/2021 SGSOV Approved JOSEPH MCGARRY
Smoke Detectors 5/19/2021 Approved JOSEPH MCGARRY
Final 6/15/2021 Permit Finaled JOSEPH MCGARRY