3217 W MCCARTHY DR 90065

Certificate Information: 3217 W MCCARTHY DR 90065

Application / Permit
20016-10000-05280
Plan Check / Job No.
B20LA03486
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO (E) SINGLE FAMILY DWELLING. KITCHEN/BATHROOM REMODEL. CONVERT HALLWAY TO BATHROOM. REMOVE AND REPLACE WINDOWS FOR SAME SIZE AND TYPE. (2) NEW BEAMS. ALL WORK PER ENGINEER DESIGN.
Permit Issued
Issued on 2/24/2020
Issuing Office
Metro
Current Status
Permit Finaled on 1/27/2021

Permit Application Status History

Submitted 2/21/2020 APPLICANT
Assigned to Plan Check Engineer 2/21/2020 KEVIN MORALES
Corrections Issued 2/21/2020 KEVIN MORALES
Plan Check Approved 2/24/2020 FARSHAD ALIMOHAMADI
Issued 2/24/2020 LADBS
Permit Finaled 1/26/2021 CRAIG VAUGHAN

Permit Application Clearance Information

Supp. Use District POD/CDO/TDO Cleared 2/24/2020 TERRI OSBORNE

Contact Information

Contractor L.E Construction Inc; Lic. No.: 928732-B P O BOX 1319      GUASTI, CA 91743
Engineer Chi,, Joseph Chiwol; Lic. No.: C53156 19623 BOMAR CT      ROWLAND HEIGHTS, CA 91748

Inspector Information

RONNIE MEDINA, (213) 469-5852 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 3/25/2020 Not Ready for Inspection CRAIG VAUGHAN
PLUMBING-Rough 3/25/2020 Not Ready for Inspection CRAIG VAUGHAN
Wood Frame 3/25/2020 Not Ready for Inspection CRAIG VAUGHAN
ELECTRICAL-Rough 3/31/2020 Corrections Issued CRAIG VAUGHAN
PLUMBING-Rough 3/31/2020 Approved CRAIG VAUGHAN
Wood Frame 3/31/2020 Approved CRAIG VAUGHAN
ELECTRICAL-Rough 4/7/2020 Approved CRAIG VAUGHAN
Shower Pan 4/7/2020 Approved CRAIG VAUGHAN
Drywall Nailing 4/10/2020 Approved CRAIG VAUGHAN
Insulation 4/10/2020 Approved CRAIG VAUGHAN
Interior/Exterior Lathing 4/17/2020 Approved CRAIG VAUGHAN
Gas Test 5/11/2020 Not Ready for Inspection CHRISTOPHER DELLEFIELD
ELECTRICAL-Final 8/19/2020 Not Ready for Inspection CRAIG VAUGHAN
Service/Power Release 8/19/2020 Not Ready for Inspection CRAIG VAUGHAN
Sewer 9/2/2020 Conditional Approval HAMIK HARTOUNIAN
Final 1/21/2021 Not Ready for Inspection CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 1/21/2021 SGSOV Approved CRAIG VAUGHAN
Smoke Detectors 1/21/2021 Corrections Issued CRAIG VAUGHAN
Final 1/26/2021 Permit Finaled CRAIG VAUGHAN
Gas Test 1/26/2021 Approved CRAIG VAUGHAN
Smoke Detectors 1/26/2021 Approved CRAIG VAUGHAN