2524 S GRIFFITH AVE 90011

Certificate Information: 2524 S GRIFFITH AVE 90011

Application / Permit
20016-10000-04723
Plan Check / Job No.
B20LA03031
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH 93. INSTALL NEW 2 HFX's, AND WOOD SHEAR WALLS
Permit Issued
Issued on 4/28/2021
Issuing Office
Current Status
CofC Issued on 10/10/2024

Permit Application Status History

Submitted 2/18/2020 APPLICANT
Assigned to Plan Check Engineer 3/4/2020 BIDYUT RATH
Corrections Issued 3/12/2020 BIDYUT RATH
Quality Review Completed 3/23/2020 SAI KHUM
Building Plans Picked Up 3/26/2020 APPLICANT
Plan Check Approved 6/22/2020 DANIEL SANJUAN
Issued 4/28/2021 APPLICANT
OK for CofC 10/10/2024 DARRYL ARNOLD
CofC Issued 10/10/2024 WINSTON DUNNING

Permit Application Clearance Information

Address approval Cleared 5/27/2020 THOMAS LANG
Eng Process Fee Ord 176,300 Cleared 6/22/2020 ELENA LOPEZ
Tenant Habitability Plan Cleared 4/20/2021 PHILLIP MUNGUIA

Contact Information

Contractor Batten Construction Inc; Lic. No.: 1023700-B 14873 EDGERIDGE DR      HACIENDA HEIGHTS, CA 91745
Engineer Reyes,, Jose E; Lic. No.: C70677 1219 E ADAMS BLVD      LOS ANGELES, CA 90011

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/13/2021 Conditional Approval DARRYL ARNOLD
Deputy Steel/Welding 6/7/2021 Conditional Approval MARK FERRARI
Excavation/Setback/Form/Re-Bar 6/11/2021 Approved DARRYL ARNOLD
Footing/Foundation/Slab 6/11/2021 Approved DARRYL ARNOLD
Floor/Roof Diaphrgm/Shear Wall 8/13/2021 Conditional Approval DARRYL ARNOLD
Wood Frame 8/13/2021 Conditional Approval DARRYL ARNOLD
Interior/Exterior Lathing 8/19/2021 Corrections Issued MARK FERRARI
Final 6/13/2022 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 6/13/2022 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 6/13/2022 Conditional Approval DARRYL ARNOLD
Final 6/14/2022 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 6/14/2022 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 6/14/2022 Conditional Approval DARRYL ARNOLD
Final 10/10/2024 OK for CofC DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 10/10/2024 SGSOV Approved DARRYL ARNOLD
Smoke Detectors 10/10/2024 Approved DARRYL ARNOLD