3682 E PRIMAVERA AVE 90065

Certificate Information: 3682 E PRIMAVERA AVE 90065

Application / Permit
20016-10000-03135
Plan Check / Job No.
B20LA02048
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
KITCHEN REMODEL REMOVING BEARNING-WALL AND ADD POSTS & BEAM PER ENGINEER DESIGN.
Permit Issued
Issued on 2/6/2020
Issuing Office
Metro
Current Status
Permit Finaled on 4/30/2020

Permit Application Status History

Submitted 2/3/2020 APPLICANT
Assigned to Plan Check Engineer 2/3/2020 FARSHAD ALIMOHAMADI
Corrections Issued 2/3/2020 FARSHAD ALIMOHAMADI
Plan Check Approved 2/6/2020 FERNANDO FLORES
Issued 2/6/2020 LADBS
Permit Finaled 4/30/2020 OSVALDO PARAMO

Permit Application Clearance Information

Grading Pre-Inspection Cleared 2/6/2020 KIRK LINKLATER
Specific Plan Cleared 2/6/2020 RICHARD REASER

Contact Information

Contractor Pure Energy Construction; Lic. No.: 1038504-B 21044 SHERMAN WAY      LOS ANGELES, CA 91303
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/11/2020 Partial Approval OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 3/12/2020 Approved OSVALDO PARAMO
Footing/Foundation/Slab 3/12/2020 Approved OSVALDO PARAMO
BUILDING-Rough-Frame 3/27/2020 Approved OSVALDO PARAMO
ELECTRICAL-Rough 3/27/2020 Approved OSVALDO PARAMO
HVAC-Rough 4/6/2020 Corrections Issued OSVALDO PARAMO
Final 4/30/2020 Permit Finaled OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 4/30/2020 SGSOV Approved OSVALDO PARAMO
Smoke Detectors 4/30/2020 Approved OSVALDO PARAMO