3745 S BENTLEY AVE 90034

Certificate Information: 3745 S BENTLEY AVE 90034

Application / Permit
20016-10000-01729
Plan Check / Job No.
B20LA01060
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH. 93. INSTALL WOOD SHEAR WALLS AT ONE (1) LOCATION AT SOUTH SIDE; TWO (2) LOCATIONS AT NORTH SIDE AND WEST SIDE CORNER.
Permit Issued
Issued on 3/14/2022
Issuing Office
Metro
Current Status
Issued on 3/14/2022

Permit Application Status History

Submitted 1/21/2020 APPLICANT
Assigned to Plan Check Engineer 2/5/2020 BIDYUT RATH
Corrections Issued 2/13/2020 BIDYUT RATH
Quality Review Completed 2/19/2020 SAI KHUM
Building Plans Picked Up 2/21/2020 APPLICANT
Applicant returned to address corrections 2/8/2022 BIDYUT RATH
Applicant returned to address corrections 2/28/2022 BIDYUT RATH
Plan Check Approved 3/8/2022 BIDYUT RATH
Issued 3/14/2022 APPLICANT

Permit Application Clearance Information

Tenant Habitability Plan Cleared 3/11/2022 RICARDO BOHORQUEZ

Contact Information

Contractor Owner-Builder       ,
Engineer Foroutan-Naini,, Fardad; Lic. No.: C43935 8860 CORBIN AVE STE 212      NORTHRIDGE, CA 91324

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/3/2023 Partial Inspection GRANT WOODS
Deputy Drilled-In Anchors 5/4/2023 Conditional Approval GRANT WOODS
Footing/Foundation/Slab 5/9/2023 Partial Approval GRANT WOODS
Wood Frame 5/16/2023 Not Ready for Inspection MICHAEL PETRUSKO
Deputy Wood Construction 5/19/2023 Conditional Approval MICHAEL PETRUSKO
Floor/Roof Diaphrgm/Shear Wall 5/19/2023 Not Ready for Inspection MICHAEL PETRUSKO
Wood Frame 5/19/2023 Not Ready for Inspection MICHAEL PETRUSKO
Floor/Roof Diaphrgm/Shear Wall 5/23/2023 Approved MICHAEL PETRUSKO
Wood Frame 5/23/2023 Approved MICHAEL PETRUSKO
Drywall Nailing 6/21/2023 Approved MICHAEL PETRUSKO
Interior/Exterior Lathing 6/21/2023 Approved MICHAEL PETRUSKO
Final 7/13/2023 No Access for Inspection MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 7/13/2023 SGSOV Not Ready MICHAEL PETRUSKO
Smoke Detectors 7/13/2023 Not Ready for Inspection MICHAEL PETRUSKO
Final 9/22/2023 Not Ready for Inspection MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 9/22/2023 SGSOV Not Ready MICHAEL PETRUSKO
Smoke Detectors 9/22/2023 Not Ready for Inspection MICHAEL PETRUSKO