1552 S POINT VIEW ST 90035

Certificate Information: 1552 S POINT VIEW ST 90035

Application / Permit
20014-40000-00488
Plan Check / Job No.
B20SP00125
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
One-story, ground floor additions (306 SF total) to the side and rear of (E) one-story Single Family Dwelling. All work per Engineered Design.
Permit Issued
Issued on 3/2/2020
Issuing Office
Metro
Current Status
CofO Issued on 9/29/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/5/2020 APPLICANT
Assigned to Plan Check Engineer 2/5/2020 JASON JANGADA
Corrections Issued 2/5/2020 JASON JANGADA
Applicant returned to address corrections 2/27/2020 CHRISTOPHER KOMANCHECK
Plan Check Approved 3/2/2020 FERNANDO FLORES
Issued 3/2/2020 LADBS
CofO in Progress 9/28/2021 STUART CHAPMAN
Permit Finaled 9/29/2021 DEROLD HAUFF
CofO Issued 9/29/2021 DEROLD HAUFF
Permit Finaled 9/29/2021 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/28/2020 JEANETTE VONG
Hydrant and Access approval Cleared 2/28/2020 JEREMY CARTER
Roof/Waste drainage to street Cleared 2/28/2020 JEANETTE VONG
Sewer availability Cleared 2/28/2020 JEANETTE VONG

Contact Information

Contractor G A Design Build; Lic. No.: 941130-B 8449 EVEREST ST      DOWNEY, CA 90242
Engineer Carrillo,, Jesus Eduardo; Lic. No.: C77737 8207 BROOKGREEN RD      DOWNEY, CA 90240

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/6/2020 Approved DAVID CHAN
METHANE-Barrier 3/6/2020 Approved DAVID CHAN
METHANE-Subgrade 3/6/2020 Approved DAVID CHAN
PLUMBING-Rough 3/19/2020 Partial Approval MATTHEW NUCKOLLS
ELECTRICAL-Rough 5/6/2020 Approved DAVID CHAN
Floor/Roof Diaphrgm/Shear Wall 5/6/2020 Corrections Issued DAVID CHAN
HVAC-Rough 5/6/2020 Approved DAVID CHAN
PLUMBING-Rough 5/6/2020 Corrections Issued DAVID CHAN
PLUMBING-Rough 5/11/2020 Approved MATTHEW NUCKOLLS
Floor/Roof Diaphrgm/Shear Wall 5/12/2020 Approved MATTHEW NUCKOLLS
PLUMBING-Rough 5/12/2020 Approved MATTHEW NUCKOLLS
Pre-Inspection 5/19/2020 Corrections Issued DAVID CHAN
Floor/Roof Diaphrgm/Shear Wall 5/22/2020 Approved DAVID CHAN
Interior/Exterior Lathing 6/3/2020 Partial Approval THOMAS LOGRASSO
Shower Pan 6/3/2020 Partial Approval THOMAS LOGRASSO
Green Building Rough 6/9/2020 Corrections Issued SABAS ALONSO
Insulation 6/9/2020 Approved SABAS ALONSO
Shower Pan 6/9/2020 Approved SABAS ALONSO
Green Building Rough 6/12/2020 Approved SABAS ALONSO
Drywall Nailing 6/22/2020 Approved SABAS ALONSO
Interior/Exterior Lathing 6/22/2020 Approved SABAS ALONSO
Service/Power Release 10/22/2020 Approved DAVID CHAN
SGSOV-Seismic Gas S/O Valve 12/17/2020 SGSOV Not Ready DAVID CHAN
BUILDING-Rough-Frame 1/8/2021 No Access for Inspection DAVID CHAN
Final 1/8/2021 Not Ready for Inspection DAVID CHAN
Green Building Final 1/8/2021 Approved DAVID CHAN
METHANE-Final 1/8/2021 Approved DAVID CHAN
METHANE-Rough 1/8/2021 Approved DAVID CHAN
SGSOV-Seismic Gas S/O Valve 1/8/2021 SGSOV Approved DAVID CHAN
Smoke Detectors 1/8/2021 No Access for Inspection DAVID CHAN
BUILDING-Rough-Frame 3/18/2021 Approved STUART CHAPMAN
ELECTRICAL-Final 3/18/2021 Approved STUART CHAPMAN
Final 3/18/2021 Corrections Issued STUART CHAPMAN
HVAC-Final 3/18/2021 Not Ready for Inspection STUART CHAPMAN
PLUMBING-Final 3/18/2021 Approved STUART CHAPMAN
Smoke Detectors 3/18/2021 Approved STUART CHAPMAN
Final 3/25/2021 Not Ready for Inspection MICHAEL FAUNCE
Final 5/19/2021 Corrections Issued STUART CHAPMAN
Interior/Exterior Lathing 8/27/2021 Approved STUART CHAPMAN
Pre-Inspection 8/27/2021 Not Ready for Inspection STUART CHAPMAN
Final 9/13/2021 Corrections Issued RUBEN SALAS
Final 9/28/2021 OK to Issue CofO STUART CHAPMAN